Loading...
2008-012 RESOLUTION NO. 2008-12 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF AVENTURA, FLORIDA APPROVING AND AUTHORIZING THE CITY MANAGER TO EXECUTE AND OTHERWISE ENTER INTO THE ATTACHED CHANGE ORDER FOR BID NUMBER 07-12-8-2 FOR NE 29TH PLACE AND YACHT CLUB WAY MILLING AND RESURFACING CONSTRUCTION BY AND BETWEEN THE CITY AND WEEKLEY ASPHALT PAVING, INC.: AUTHORIZING THE CITY MANAGER TO CARRY OUT THE AIMS OF THIS RESOLUTION; AND PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, NE 29th Place and Yacht Club Way are included in the 2007/08 Road Resurfacing Capital Improvement Program; and WHEREAS, use of the same contractor for the Yacht Club Drive Road Resurfacing project to perform construction of the Yacht Club Way and NE 29th Place Road Resurfacing projects will reduce costs associated with bidding and will mitigate the substantial increases in asphalt costs in the one (1) year time lapse between the original bid and present time; and WHEREAS, the City of Aventura currently has Weekley Asphalt Paving, Inc. under contract to perform improvements applicable to the Yacht Club Drive Road Resurfacing project; and WHEREAS, a change order is necessary to provide for the road resurfacing improvements to NE 29th Place and Yacht Club Way, and the work provided for under the enclosed Change Order is exempt from further competitive bidding pursuant to City Code Section 2-253(6). NOW THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF AVENTURA, FLORIDA, THAT: Section 1: That the above stated recitals are hereby adopted and confirmed. Section 2: That the City Manager is hereby authorized to execute and otherwise enter into attached Change Order NO.2 for Bid No. 07-12-8-2 Yacht Club Drive Road Resurfacing Improvements by and between the City and Weekley Asphalt Paving, Inc. for road resurfacing improvements to NE 29th Place and Yacht Club Way for the amount of $207,627.23. Section 3: That the City Manager is hereby authorized to do all things necessary to carry out the aims of this Resolution. Section 4: That this resolution shall become effective immediately upon its adoption. The foregoing Resolution was offered by Commissioner Joel, who moved its adoption. This motion was seconded by Commissioner Holzberg, and upon being put to a vote, the vote was as follows: Commissioner Zev Auerbach yes Commissioner Teri Holzberg yes Commissioner Billy Joel yes Commissioner Michael Stern yes Commissioner Luz Urbaez Weinberg yes Vice Mayor Bob Diamond yes Mayor Susan Gottlieb yes Resolution No. 2008- 11..- Page 2 PASSED AND ADOPTED this 5th day of February, 2008. APPRO~il ~A CITY ATTORNEY CITY OF AVENTURA CHANGE ORDER FORM CHANGE ORDER NO.2 CONTRACT NUMBER: 07-12-8-2 DATE: January 24,2008 PROJECT TITLE: Yacht Club Drive Milling & Resurfacing Improvements PROJECT CONTRACTOR: Weekley Asphalt Paving, Inc. COST: $207,627.23 BUDGET LINE ITEM: 120-5001-541-6305 DESCRIPTION OF CHANGES: Additional Milling & Resurfacing, Maintenance of Traffic, Crosswalks, Mobilization, Signage & Markings of NE 2911i PL & Yacht Club Way Revised Contract Amount: $ 253,357.00 $ 32,101.75 $ 207,627.23 $ 493,085.98 Original Contract: Total Previous Change Orders: This Change Order: Total Change Orders to Date: 1 Contract Amount Before This Change: $285,458.75 Total Change in Contract Period: 228 Calendar Days The sum of $207,627.23 is hereby added to the Contract price, and the total adjusted Contract price to date thereby is $493,085.98. The time provided for completion of the Contract increases by two hundred twenty eight (228) days. This document shall become an amendment to the Contract and all provisions of the Contract will apply thereto. Recommended by Recommended by Consultant ~~fJ~' Capital Projects Manager Date \-'2.a..t-ost Date Recommended for Budgetary Purposes: Finance Support Services Director Date Approved by City Manager Date Accepted by Contractor Date WEEKLEY ASPHALT PAVING, INC. WAP JOB # 07017 CONTRACT # 07-12-8-2-2 JOB DESCRPITION: CITY OF AVENTURA - YACHT CLUB DRIVE MILLING AND RESURFACING COUNTY Dade Contract Item Number Quantity Unit UnltPrice Descriotion Amount 1 1.000 LS $ 6,030.00 GENERAL CONDITIONS $ 6,030.00 2 1.000 LS $ 19,620.00 MOBILIZATION $ 19,620.00 17 1.000 LS $ 10,000.00 TRAFFIC CONTROL; AND AVENTURA POLICE DEPT. $ 10,000.00 NORTHEAST 29TH PLACE - MILL AND RESURFACE 3 1.000 LS $ 8,327.00 MAINTENANCE OF TRAFFIC $ 8,327.00 4 4496.000 SY $ 4.25 MILL EXISTING ASPHALT (1" Minimum Thickness) $ 19,108.00 5 4496.000 SY $ 4.50 INSTALL 1" MINIMUM TYPE 5-111 ASPHALT $ 20,232.00 6 4.000 EA $ 2,610.00 REMOVE EXISTING AND INSTALL NEW HANDICAP $ 10,440.00 7 1.000 LS $ 16,549.50 PAVEMENT MARKINGS AND SIGNAGE $ 16,549.50 1.000 LS $ 8,900.00 ALT. BID TO PERFORM WORK AT NIGHT $ 8,900.00 TOTAl $ 83,556.50 YACHT CLUB WAY - MILL AND RESURFACE 3 1.000 LS $ 7,530.00 MAINTENANCE OF TRAFFIC $ 7,530.00 4 5771.000 SY $ 4.25 MILL EXISTING ASPHALT (1" Minimum Thickness) $ 24,526.75 5 5771.000 SY $ 4.50 INSTALL 1" MINIMUM TYPE 5-111 ASPHALT $ 25,969.50 7 1.000 LS $ 11,891.70 PAVEMENT MARKINGS AND SIGNAGE $ 11,891.70 TOTAL $ 69,917.95 YACHT CLUB WAY CROSSWALKS AND HANDICAP RAMPS 3 1.000 LS $ 2,653.03 MAINTENANCE OF TRAFFIC $ 2,653.03 12.000 CY $ 38.00 REGULAR EXCAVATION $ 456.00 16.000 SY $ 102.00 ASPHALT BASE AND SURFACE $ 1,632.00 98.000 LF $ 7.80 REMOVE AND DISPOSE OF CONCRETE CURB AND $ 764.40 40.000 LF $ 32.60 TYPE "0" CURB AND GUTTER $ 1,304.00 23.000 SY $ 87.55 4" CONCRETE SIDEWALK $ 2,013.65 23.000 LF $ 18.50 RELOCATE EXISTING IRRIGATION $ 425.50 6 80.000 SF $ 47.80 ARMOR GUARD TACTILE (VANGUARD) $ 3,824.00 55.000 LF $ 32.60 TYPE F CURB $ 1,793.00 23.000 SY $ 18.40 REMOVE EXISTING CONCRETE SIDEWALK $ 423.20 7 1.000 LS $ 3,214.00 PAVEMENT MARKINGS AND SIGNAGE $- 3,214.00 TOTAL $ 18,502.78 GRAND TOTAL $ 207,627.23