Loading...
2003-060RESOLUTION NO. 2003- 6._.~0 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF AVENTURA, FLORIDA, AUTHORIZING THE CITY MANAGER TO EXECUTE THE ATTACHED WORK AUTHORIZATION NO. 01-0103-035 FOR PROFESSIONAL DESIGN SERVICES FOR THE HOSPITAL DISTRICT NE 213TM STREET CONNECTOR DRAINAGE IMPROVEMENTS PROJECT BY AND BETWEEN THE CITY OF AVENTURA AND CRAVEN THOMPSON AND ASSOCIATES, INC.; AND PROVIDING AN EFFECTIVE DATE. NOW, THEREFORE, BE IT RESOLVED BY THE CiTY COMMISSION OF THE CITY OF AVENTURA, FLORIDA, THAT: Section 1. The City Manager is hereby authorized to execute attached Work Authorization No. 01-0103-035 ($60,200.00) for professional design services for the Hospital District NE 213th Street Connector Drainage Improvements by and between the City and Craven Thompson and Associates, Inc. Section 2. The City Manager is authorized to do all things necessary to carry out the aims of this Resolution. Section 3. This Resolution shall become effective immediately upon its adoption. The foregoing Resolution was offered by Commissioner Beskin, who moved its adoption. The motion was seconded by Vice Mayor Grossman, and upon being put to a vote, the vote was as follows: Commissioner Zev Auerbach Commissioner Jay R. Beskin Commissioner Ken Cohen Commissioner Bob Diamond Commissioner Harry Holzberg Vice Mayor Manny Grossman Mayor Jeffrey M. Perlow yes yes yes yes yes yes yes Resolution No. 2003- 6o Page 2 PASSED AND ADOPTED this 2nd day of September, 2003. JE'C'FRCl~.Y M. PI~RLOW,~z~Z0'R APPROVED AS TO LEGAL SUFFICIENCY: CITY A~TNO~ WORK AUTHORIZATION NO. 01-0103-03~ The City of Aventura has requested Work Authorization No. 01-0103-035 as provided for in the Agreement I~tween the City of Aventura and Craven Thompson and Associates, Inc. and approved by the City Commission on July 3, 2001. This Work Authorization No 014)103-035 provides for technical services in accordance with Articles 3, 4, 6, 7 and 8 of the Agreement as further detailed ia the scope of services ia Exhibit A. Payment for such services shall be in accordance with Article 5 of the Agreement. Schematic Design Phase Prepare Site Specific Survey ............................................................................... $5,500.00 Schematic Engineering Plans .............................................................................. $3,000.00 Total Schematic Phase ...................................................................................... $8,500.00 1)¢~i~ Phase Prepare Design Drawings .................................................................................. $15,500.00 Pmpm~ Drainage Calculations .............................................................................. $1,200.00 Project Management ....................... . ..................................................................... $5,000.00 Total Design Phase ........................................................................................... 21,700.00 Permitting Phase Prepare and Process Permits ................................................................................ $6,000.00 Coordination with FDOT and DERM .................................................................. $1,500.00 Total Permitting Phase ...................................................................................... $7,500.00 Bidding Phnse Prepa~ Bid Documents/Technical Specifications ................................................ $2,200.00 Attend Pre-bid Conference .................................................................................... $200.00 Respond to RFI's/Prepare Addendums .................................................................. $500.00 Total Bidding Phase .......................................................................................... $2~900.00 Construction Phase Shop Drawing Revim~' ........................................................................................... $800.00 Site Visits ......................................................................................................... $12,500.00 Project Closeout Documentation ......................................................................... $1,200.00 Total Construction Phase ................................................................................ 14,500.00 Reimbursable Expenses Printing, Graphics, Communications ..................................................................... $500.00 Geoteclmical ....................................................................................................... $1,600.00 Utility Locations ................................................................................................. $2,500.00 Comers, Express Mail, Etc ................................................................................... $500.00 Total Reimbursable Expenses ........................................................................... $5,100.00 Total Estimated Labor Expenses are .................................................................. $55,100.00 Total Estimated Reimbursable Expenses are ........................................................ $5,100.00 The time period for this Work Authoi~7~tion will be: Schematic Design Phase ........................................... 60 Days Design Phase ............................................................ 60 Days Permitting Phase .................................................... 150 Days ConsU'uction Services Phase (estimate) ................... 150 Days BY APPROVED AS TO FORM ~y ~ ~ ~~'~ City Attomey Weiss Serota& Helfman, P.A. Notice to Proceed Yes Project Initiation Date No RECOMMENDED through its Capital Projects Manager Capital Projects Maaager Antonio F. Tomei day of t~,, 2003 Consultant shall prepare design drawings and specifications for the western extension of the 213t~ Street clmmage system to serve the Hospital District. The plans shall be for the design of the 60" drainage culvert to be placed under Biscayne Boulevard, most likely by jack and bore. This Work Authorization is based on portions of the general layout as proposed in the Drainage & Sanitary System Study of Biscayne Lake Gardens Neighborhood and Hospital D~strict, prepared by Craven Thompson & Associates. Consultant will more specifically perform the following: · Perform field survey and prepare survey drawings sufficient for the proposed design. * Prepare engineering plans for the jack and bore construction of a 60" drainage culvert under Biscayne Boulevard to connect to existing NE 213~ Street "North Collector System. * Prepare En~necrs Cost Estimate for the proposed improvements. · Prepare and submit drainage calculations and permit applications for the following: DERM Environmental Resource Permit, FDOT General Use Permit, and FDOT Drainage Permit (if required). o Process the aforementioned applications through their respective agencies and obtain drawing approval by the City. · Prepare technical specifications for inclusion into the City's Bid package. · Miscellaneous coordination with agencies, franchise utilities, and/or City. · Prepare bid documents and assist City in bidding the work. · Provide construction services, including general observation of the work to assure eotfformance with specifications and drawings. · Attend final inspections and coordinate with City and Coahactor on final acceptance of the WOrk. · Provide Statements of Completion as required by the permitting agencies and/or the City. The following are not included: Design and permittiag of gravity sanitmy sewer, force main, water main. or the extension of the drainage system west to 28a' Avenue to fie in to the Hospital District System.