2003-026RESOLUTION NO. 2003-26
A RESOLUTION OF THE CITY COMMISSION OF THE
CITY OF AVENTURA, FLORIDA APPROVING AND
AUTHORIZING THE CITY MANAGER TO EXECUTE AND
OTHERWISE ENTER INTO THE ATTACHED CHANGE
ORDER FOR THE NE 188TM STREET IMPROVEMENTS
PROJECT, BY AND BETWEEN THE CITY AND JAMES A.
CUMMINGS, INC; AUTHORIZING THE CITY MANAGER
TO DO ALL THINGS NECESSARY TO CARRY OUT THE
AIMS OF THIS RESOLUTION; AND PROVIDING AN
EFFECTIVE DATE.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF AVENTURA, FLORIDA, THAT:
Section_1. The City Manager is hereby authorized to execute and otherwise
enter into a Change Order for the NE 188~h Street Improvements Project, by and
between the City and James A. Cummings, Inc., attached hereto and incorporated
herein as specifically as if set forth at length herein. Said Change Order amount is
$112,280.00.
Section 2. The City Manager is hereby authorized to do all things necessary to
carry out the aims of this Resolution.
Section 3. This Resolution shall become effective immediately upon its
adoption.
The foregoing Resolution was offered by Commissioner Holzberg, who moved its
adoption. The motion was seconded by Vice Mayor Grossman, and upon being put to
a vote, the vote was as follows:
Commissioner Zev Auerbach
Commissioner Jay R. Beskin
Commissioner Ken Cohen
Commissioner Bob Diamond
Commissioner Manny Grossman
Commissioner Harry Holzberg
Mayor Jeffrey M. Perlow
yes
yes
yes
yes
yes
yes
yes
Resolution No. 2003- ?6
Page 2
PASSED AND ADOPTED this Ist day of April, 2003.
ATTI
/
SA M/SORt:
~ CLE~.~_.
VIC
APPROVED AS TO LEGAL SUFFICIENCY:
CITY ATTORNEY
CHANGE
ORDER
Page 1 of 3
PROJECT:
Aventura Recreational Center
3375 NE 188= Street
Aventura, FL 33180
TO CONTRACTOR:
James A, Cummings, Inc.
3575 NW 53r~ Street
Fort Lauderdale, FL 33309
CHANGE ORDER NUMBER:
DATE:
ARCHITECT'S PROJECTNO:
CONTRACT DATE:
03-18-03
11-06-01
The Contract is changed as follows:
Owner Change Order
Not valid until signed by the Owner, Architect and Contractor
1. Provide additional pollution retardant baffle at Structure 9C in accordance with Request for Change Order
g0010 dated May 28 2002 ....... . .................. ADD-$ 569.00
2. Remove and replace additional unsuitable materials encountered during the performance of the Work in
accordance with Request for Change Order ~fl)01? dated March 03, 2003 ............................. ADD' $ 43,976.00
3. Revise water and drainage systems due to conflicts encountered with exisifing underground utilities in
accordance with Request for Change Order 00018, Revision 1, dated March 03, 2003 .................. ADD: $28,448.00
4. Revise new 8" water services to the South as required to c~oss the existing 6" water main in accordance with
Request for Change order #0019 dated September05 2003 ..................... ADD:$ 9,314.00
5. Provide Conflict Manhole at Station 109+05 in accordance with Request for Change Order #0022 dated
September 05, 2002 ...................................................................................................................... ADD: $ 5,797.00
6. Provide Bellsouth conduit sleeves across 188th Street in accordance with Request for Change Order g0026
dated October 25, 2002 ................................................................................................................. ADD: $1,590.00
7. Modify drainage Structures 2B & 6B due to conflict with existing transite water line in accordance with Request
for Change Order 00028 dated November 22, 2002 ...................................................................... ADD: $ 2,768.00
8. Relocate fire hydrant due to conflict with curb at entmn~ loop cul-de-sac in accordance with Request for
Change Order g0035 dated March 04 2003 .......................... ADD: $ 3,534.00
9.Provide irrigation tap ori~nally indicated to he by "C.N. lvLB. Forces" in accordance with Request for Change
Order #0036 dated December 12 2003 .................................. ADD: $ 2,534.00
10. Remove and replace curbs and raise parking grades on the North Side of 188th Sffeet in accordance with
Request for Change Order g0046 dated January 15, 2003 ............................................................. ADD: $10,764.00
CHANGE
ORDER
Page 2 of 3
PROJECT:
Aventura Recreational Center
3375 NE 188~ Street
Aventura, FL 33180
TO CONTRACTOR:
James A. Cummings, Inc.
3575 NW 53= Street
Fort Lauderdale, FL 33309
CHANGE ORDER NUMBER:
DATE:
ARCHITECT'S PROJECT NO:
CONTRACT DATE:
0~1~03
11-06-01
The Contract is changed as follows:
Owner Change Order
Not valid until signed by the Owner, Architect and Contractor
11. Relocate fire hydrant at station 118+80 to accomodate new entrance to Charter School in accordance with
Request for Change Order 00047 dated February 17, 2003 ........................................................... ADD: $ 1,282.00
12.Provide additional pollution retardant baffles as directed by D.E.R.M. during thc final inspection in accordance
with Request for Change Order ~00~6 dated March 03, 2003 ....................................................... ADD: $ 1,704.00
CHANGE
ORDER
Page 3 of 3
PROJECT:
Aventura Recreational Center
3375 NE 188~' Street
Aventura, FL 33180
TO CONTRACTOR:
James A. Cummings, Inc.
3575 NW 53~ Street
Fort Lauderdale, FL 33309
CHANGE ORDER NUMBER:
DATE:
ARCHITECT'S PROJECT NO:
CONTRACT DATE:
0~1~03
11-06-01
The Contract is changed as follows:
Owner Change Order
Not valid until signed by the Owner, Architect and Contractor
The original (C;~,L-;;; C;;;;;,,) (Guaranteed Maximum Price (Anlendment No. 1)) was ..............................
Net Change by Previously authorized Change Orders (Amendme~4s No. 2 and 3) was .........................
The ~ (Guaranteed Maximum Pdce) pdor to this Change Order was .........................
The ~Cc.;,;..~: C;.T,) (Guaranteed Maximum Price) will be (increased) ~cc;~.;)
(',J.';;.';,..,u~J) by this Change Order in the amount of ....... . ...................
The new (~ (Guamntasd Maximum Price) including this Change Order
The Contract Time will be (~ (dasmased) (unchanged)
The date of Substantisl Compk-'flo~ as of the date of this Change Order theretore is .................
92,666.00
5,138,682.00
5,231,348.00
112,280,00
5,343,628.00
0 days
02-14-03
NOTE: This summary does not mflec~ changes in the Contract Sum, Contract Time or Guaranteed Maximum Pdce which have been
AL,~horized by construction Change Directive.
~rmetlo/A~amil & Partheml Inc.
ARCHITECT
J. ames A. Cummlngs~ Inc.
CONTRACTOR
2601 South 0ayshora Drive .,3675 NW 53~ Street
Address Address
City of Aventura
OWNER
.19200 West Countnf Club Dr.
Address
SIGNATURE SIGNATURE SIGNATURE
DATE DATE DATE
Mism~ FL 33133 .Fgrt Laude~dais~ FL 33309 Aventum~ FL 33180
BY Addle Lamas BY .William R. Den'er BY Eric Somka