99-056 RESOLUTION NO. 99-56 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF AVENTURA, FLORIDA APPROVING AND AUTHORIZING THE CITY MANAGER TO EXECUTE AND OTHERWISE ENTER INTO THE ATTACHED CHANGE ORDER NO. 1 FOR AVENTURA GOVERNMENT CENTER BY AND BETWEEN THE CITY AND JAMES A. CUMMINGS, INC.; AUTHORIZING THE CITY MANAGER TO DO ALL THINGS NECESSARY TO CARRY OUT THE AIMS OF THIS RESOLUTION; AND PROVIDING AN EFFECTIVE DATE. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF AVENTURA, FLORIDA, THAT: Section 1. The City Manager is hereby authorized to execute and otherwise enter into Change Order No. 1 for Aventura Government Center by and between the City and James A. Cummings, Inc., attached hereto and incorporated herein as specifically as if set forth at length herein. Said Change Order amount is $560,291. Section 2. The City Manager is hereby authorized to do all things necessary to carry out the aims of this Resolution. Section 3. This Resolution shall become effective immediately upon its adoption. Rogers- The foregoing Resolution was offered by Commissioner Libert , who moved its adoption. The motion was seconded by Commissioner Cohen , and upon being put to a vote, the vote was as follows: Commissioner Arthur Berger Commissioner Jay R. Beskin yes Commissioner Ken Cohen Commissioner Harry Holzberg 3,es Resolution No. 99-56 Page 2 Commissioner Jeffrey M. Perlow yes Commissioner Patricia Rogers-Libert Mayor Arthur I. Snyder yes PASSED AND ADOPTED this 5th day of October, 1999. A'I-I'EST: TERESA M. $0R'0KA, CMc/AAE CITY CLERK APPROVED AS TO LEGAL SUFFICIENCY: CITY ATTORNEY EMS/tms CITY OF AVENTURA CHANGE ORDER FORM CHANGE ORDER NO. I CONTRACT NUMBER: 97-9-30-2 DATE: October 1, 1999 PROJECT TITLE: Aventura Government Center PROJECT CONTRACTOR: James A. Cummings Inc. DESCRIPTION OF CHANGES: See attached Exhibit A Original GMP Contract Amount: $13,028,946 Total Previous Change Orders: 0 This Change Order: 560,291 Revised GMP Contract Amount: $13,589,237 Amended Contract Completion Date: September 30, 2000 The sum of $560,291 is hereby added to the GMP Contract price, and the total adjusted Contract price to date thereby is $13,589,237. The time provided for completion in the Contract has been amended to September 30, 2000. This document shall become an amendment to the Contract and all provisions of the Contract will apply thereto. Approved by City Manager Date Accepted by James A. Cummings Inc Date Summary Change Order No. 1 Unanticipated Permit Requirements Sitework 11 ,St 4 Piling 51,839 Concrete 294,450 Steel 91,716 Plaza deck Waterproofing 22,387 Louvers-Pump mom/generator mom 5,277 Plumbing 47,749 Post Tensioning 2,195 HVAC - Smoke Evacuation 44,529 Subtotal 571,956 Finishing Revisions Generator roof 2,737 Balcony drainage tile revision 4,276 Subtotal 7,013 Chamber Redesign Commission Dais 16,890 Ceiling baffles 27,708 Projection Screen 6,119 Projec/or Lift Screen 7,059 Concrete 86,662 Subtotal 144,438 Deducts Masonry (7,165.0) Stairway Revisions (60,640.0) Deleted stage (12,381.0) Deleted Garage overhead door (4,008.0) Revise chamber walls (6,788.0) Reduce metal shelving (2,504.0) change structural beams (4,198.0) delete curtain and track (7,661.0) Delete steel for roof parapet (20,701.0) Revisions to roofing (4,153.0) Revision to fueling station (4,417.0) Subtotal (134,616) Total 588,791 Tax Savings (87,379) Overhead 58,879 Total Change to GMP 560,291 CHANGE C ARCHITECT [] ORDER CO T CTOg [] ~1ELD [] A IA DO~U~f EJ%'T G701 O'FlIER C] PAGE ONE PROJECT: A~ entura Governraem Center CHANGE ORDER NUMBER: #001 (name, address) 19200 West Country Club Drive Aventura, FL 33180 DATE: November 3, 1999 ARCHITECT'S PROJECT NO: 97-20 TO CONTRACTOR:James A. Cummings, Inc. (name, address) 3575 N.W. 53`4 Street CONTRACT DATE: December 15, 1998 Ft. LauderdaIe, FL 33309 CONTRACT FOR: Aventura Government Ctr. The Contract ks changed as follows: I Revise the Guaranteed Maximum Price to include Addendum #1 and Addendum #2 changes as listed below in accordance with Addendum mi and Addendum #2 Drawings and Specifications as listed in Exhibit A attached herewith and made a part of this Agreement: a. Provide the sitework and utilities in accordance with the Addendum #1 and Addendum #2 Contract Documents ...................................................... ADD: $11,814.00 b. Provide the auger cast piling in accordance with the Addendum #1 and Addendum #2 Contract Documents including mobilization, layout and as-builts ................... ADD: $51,839.00 c. Provide the concrete structure in accordance with the Addendum #1 and Addendum #2 Contract Documents including concrete formwork, concrete placing, concrete materials, concrete tSnishes, concrete reinforcing and precast prestressed sections. The plaza level secondary concrete pour is included as broom finished lightweight colored concrete with tooled joints at twenty (20) feet on center. Bomanite is not included .......... ADD: $448,560.00 d. Pro',ide the masonry in accordance with the Addendum #1 and Addendum #2 Contract Documents .......................................................... DEDUCT: $7,165.00 e. Change stair treads at stair #2 to precast concrete and change stair #1 and stair #5 to colored concrete ..................................................... DEDUCT: $60,640.00 L Provide the structural and miscellaneous steel in accordance with the Addendum # 1 and Adde~,,dum e2 Contract Documents .......................................... ADD: 81,564.00 g. Provide the entrance canopy in accordance with the G.M.P. Contract Documents. Please note that the cladding or roofing of the canopy are not included in the G.M.P., Addendum #1 or Addendum #2 ......................................................... NO CHANGE h. Provide the dias at the council chamber and bullet resistant material for the counter at room #105. The Barrier Series 3 Accessory Consoles are not included ................... ADD: $16,890.00 i. Delete the wood framing for the stage at the council chamber .................. DEDUCT: $12,381.00 Provide the overhead coiling doors in accordance with the Addendum #1 and Addendum ~-2 Contract Documents ................................................ DEDUCT: $4,008.00 k. Provide the plaster baftle ceiling in the council chamber, security ceilings in the holding cells, t)Llllct !c'.J,{iili[ I/lCb[l LU tJlc ~'ec¢ption countc:', plastic laminate wall panels at tile reporting carrels and fake column covers in accordance with the Addendum #l and Addendum #2 Contract Documents. Fiber reinforced gypsum wall board is not included ........... ADD: $27,708.00 ~'~ J (~ CONTINUED ON PAGE TWO CHANGE [] ARCHITECT [] O R D E R CONTRACTOR [] FIELD 0 AIM DOCUMENT G70I OTHER 0 PAGE TWO PROJECT: Aventura Government Center CHANGE ORDER NUMBER: g001 (name, address) 19200 West Country Club Drive DATE: TO CONTRACTOR:A''cnturu' FL 33180 ARCHITECT'S PROJECT NO: November 3, 1999 97-20 (name, address) James A. Cummings, Inc. CONTRACT DATE: 3575 N.W. 53rd Street CONTRACT FOR: December 15, 1998 Ft. Lauderdale, FL 33309 Aventura Government Ctr. The Contract is changed :as follows: 1. Provide the prefabricated fiberglass showers in accordance with the G.M.P. Contract Documents. Ceramic tile at the showers is not included, in accordance with Owner directive dated September 30, 1999 Addendum g 1 Cost Estimate, Item gl7 ............. NO CHANGE m. Provide the quarry tile at the balconies in accordance with the Addendum gl and Addendum #2 Contract Documents .......................................... ADD: $4,276.00 n. Provide the acoustical ceilings in accordance with the G.M.P. Contract Documents. KS/',ai l}n~h ik>l thc inctal panel ceiling is not included in accordance with Owner directive dated September 30, 1999 Addendum #1 Cost Estimate, Item g20 ............. NO CHANGE o. Provide 3/8" thick acoustical wall panels in accordance with the Addendum gl and Addendum g2 Contract Documents. The sounds#ak or acoustical wall panels are not inc]nded at rooms 135. 136, 150. 321 or 322 ................................ DEDUCT: $6,788.00 p. Provide the resilient tile flooring, carpeting and robber flooring in accordance with the G.M.P. Contract Documents in accordance with Owner directive dated September 30, 1999 Addendum #1 Cost Estimate, Item #22 .......................... NO CHANGE q. Provide the painting in accordance with the G.M.P. Contract Documents. The epoxy paint for the glue dry and blood dry rooms is included in accordance with Owner directive dated September 30, 1999 Addendum gl Cost Estimate, Item #23 ............. NO CHANGE r. Provide the Carlisle CCW 500-R hot applied waterproofing for the plaza deck and balconies in accordance with R.F.I. #43 ...................................... ADD: $22,387.00 s Provide the roofing in accordance with the Addendum #1 and Addendum #2 Contract Documents. The bilco hoisting hatch, davit flashing, pitch pans for the steel parapet bracing and window washing safety anchors are not included. The generator roof is included as a 24 gauge gavalume roof with a kynar finish as manuf:~ctured b}, ,\cicor ........................................... DEDUCT: $1,416.00 t. Provide the chalkboards and tackboards in accordance with the G.M.P. Contract Documents in accordance with Owner directive dated September 30, 1999 Addendum gl Cost Estimate, Item g26 .......................................... NO CHANGE CONTINUED ON PAGE THREE CHANGE ARCHITECT [] O FID EFI co 'r. croa [] AIM ~UME~ G701 O~ER 0 PAGE THREE Aventura Government Center CHANGE ORDER NUMBER: #001 PROJECT: 19200 West Country Club Drive (name, address) Aventura, FL 33180 DATE: November 3, 1999 97-20 TO CONTRACTOR:James A. Cummings, Inc. ARCHITECT'S PROJECT NO: (name, address) 3575 N.W. 53r~ Street CONTRACT DATE: December 15. 1998 Aventura Ft. Lauderdale, FL 33309 CONTRACT FOR: Government Ctr. Thc Contract is changed as follows: ti. Provide louvers at the pump room, generator room and penthouse .................. ADD: $5,277.00 v. Delete brushed aluminum raised numbers attached to the main entrance, required in Addendum #1 and Addendum #2 Contract Documents, in accordance with Owner directive dated September 30, 1999 Addendum #1 Cost Estimate, Item #28 ............. NO CHANGE w. Provide fire extinguishers and cabinets in accordance with the G.M.P. Contract Documents in accordance with Owner directive dated September 30, 1999 .\ddcndum ~ l Cost Estimate, Item #30 ......................................... NO CHANGE x. Provide metal shelving in accordance with the Addendum #1 and Addendum #2 Contract Documents .................................................. DEDUCT: $2,504.00 y. Delete all window washing equipment as required in the Addendum #l and Addendum #2 Contract Documents in accordance with Owner directive dated September 30. 1999 Addendum #1 Cost Estimate, Item #33 ......................... NO CHANGE z. Delete the stage curtain and track as required in the G.M.P. Contract Documents ...................................................... DEDUCT: $7,661.00 aa. Delete projection screen curtain required in the Addendum #l and Addendum #2 Contract Documents in accordance with Owner directive dated September 30, 1999 Addendum #1 Cost Estimate, Item #35 ..................................................... NO CHANGE bb. Provide the projection screens in accordance with the Addendum #1 and Addendum #2 Contract Documents. The projection screen in the community room is not included ............................................................... ADD: $6,119.00 cc. Provide overhead retractable projector lift at the council chamber. This is included as an Owner's allowance for labor and material of $7,000.00 ....................... ADD: $7,059.00 dd. Provide the plumbing in accordance with the Addendum #1 and Addendum #2 Contract Documents. The hot water heaters, recirculating pumps and air hammer arresters are not included ................................................ ADD: $47,749.00 CONTINqJED ON PAGE FOUR CHANGE [] ARCHITECT 1~ ORDER CONT .,CTOR [] FIELD C3 MIA DOCUMENT G701 OTHER [] PAGE FOUR Aventura Government Center #00l PROJECT: 19200 West Country Club Drive CHANGE ORDER NUMBER: (name. :~dckcsa) Aventura, FL 33180 DATE: November 3, 1999 97-20 TO CONTRACTORjames A. Cummings, Inc. ARCHITECT'S PROJECT NO: (nd.mc. add.rcs.s) 3575 N.W. 5Yd Street CONTRACT DATE: December 15, 1998 Ft. Lauderdale, FL 33309 Aventura CONTRACT FOR: Govemment Ctr. The Contract is chamged ~ follows: . . ee. Deletechandefiersrequ~red m the Addendum #1 and Addendum #2 Contract Documents in accordance with Owner directive dated September 30, 1999 Addendum #1 Cost Estimate, Item #41 ......................................... NO CHANGE ff. Delete pre-engineered metal building included in the G.M.P .................. DEDUCT: $4,417.00 gg. Provide the smoke evacuation system in accordance with the Addendum #2 Contract Documents .................................................... ADD: $44,529.00 hh. Provide additional overhead for changes contained herein. (The Contractors Fee is hereby increased by $58,879.00 for a total of $480,479.00) ................... ADD: $58,879.00 2. The Contract Time is extended to September 30, 2000 (13 l calendar days). 3. The G.M.P. shall be adjusted to reflect the Tax Savings on materials to be purchased directly by the City of Aventura in accordance with the tax savings program ........ DEDUCT: $87,379.00 TOTAL CHANGE THIS CHANGE ORDER #001 - ADD: $560.291.00 Not valid until signed by the Owner, Amhltect and Contractor. The origirml (C:.~:.-.; :--..) (Gua. r-.mteed Maximum Price)w= ........................ 1:13,028,946.00 Net dmngc by p~ mafl'~orized Chzm~ Oxx:~:s ............................... $ 0.00 The (,~?:emwe~mm) (Oua.mnteed Mmdmum Prlo:) prio~ ~o this Clzu~e Orde. t was .......... S 13,028,946.00 Thc (~ (Guat-ameed Mmdmum Price) w~l be (m,,.X ,~,~s~-~,-) by this Change 0 rd~r in dsc m.4mn[ c~- ............................ $ 560,291.00 Thenew(C-'m..:_--_zt_~.-_m)(Guaranreed.M. aximumPrtce)indudingth~ChangeOrder~ ..S 13,589,237.00 TheComr~ct Tlme~,fll be(Incx'm.sed)~(~by ( 131 )days. The date of Substmatlal Completkm as of fl~: date of this Change Ordm' therefore is September 30, 2000 Con~-,..,z~m Chang,= Michael A. S hiff, Assoc. InC. James A. Cummings, Inc. City of Aventura 1103 E. Las Olds Blvd. 3575 N.W. 53rd Stj~eet 2d999N.m. 191st #500 Streer, ' ~-/ t/~q' - ' ~A. Cummings, Pres~l~t. .a4z~c~ s-~,.uT~ O~ taom~cr~ In~ ~ 'roax ^v~ ..'~. ~t~s~O'TO~, D.C. ~ G701--1987 EXHIBIT "A" PAGE i City of Aventura (~ovcrnment Center, Police Facility & Cultural Center Index of Drawings - 100% Construction Documents Including Addendum #1 & N2 ARCttlTECTU~L O~'~NGS O~q Date - Rev No. - Re~. Date 0~ Oae - Rev No. _ Rev. ~.12 Pa~ial ~ird F~r Plan 1~10~8 -2- O~4~g A10.7 Roof~enthouse (ntedor Plan 1~1~8 ~ No Revision ~.15 Padial Fou~ ~r p~n ~I~8 -1- 01~9 All.3 O~r ~tail~valions 1~10~8 -I- 01~9 ~.18 ,Pa~a~ R~en~ou~ Fk Plan Not Issu~ ~.20 L~e Safe~ Ground F~r 1~10~8 -1- 01~8 1 Of 3 Paving & O~age P~n Sept. 1998 -7-~4~9 ~.21 ~e Safe~ P~a Lever 1~10~8 -1- 01~8 2 of 3 Pang & D~age ~ls SepL 1998 -~4~9 ~.22 ~e Safe~ P~n ~i~ f~r 1~1 ~8 -1- 01~8 3 of 3 Water & ~. P&D Ntes. SepL 1998 ~O 1-1~ ~.23 ~e Safe~ P~n Fou~ ~r Plan 1~1~8 -1- 01~8 ~.24 ~e Safe~ P~n F~ ~r 1~1~8 -l- 01~8 ~NOSCAPE & [R~GA~ON D~NGS ~5 R~en~ ~e Safe~ P[an 1 ~1 ~ -1- 01~8 ~-1 P~n~ P~n 1 ~1 ~8 ~ No ~.3 Bu~ E~ ~O I~I~ -1- 01~ - ;. ~.4 Bu~ E~ ~Q 1 ~1 ~8 -1 - 01~ S~U~L D~NGS ' A4.1 Bu~ng Se~o~ 1~1~8 -I- 01~ S-1 Omu~ Le~l Founda~on P~n 01~9 -2- 0~ A4.2 Budding Se~o~ 1~1~8 -1- 01~ S-lA Omu~ ~el P~t-Te~n. P~. 0~1~9-2-0~ A4.3 Bur~g Se~o~ 1~I~8 -1- 01~9 S-2 P~ Level Post-Tension P~n 01~9 -2- 0~9 A4.4 WaE ~ons I~1~8-1- 01~ S-3 ~rF~P~n 01~9-2-~ A4.5 Wa~ S~o~ 1~1~8-1-01~ S4 F~ ~rF~ P~n 01~-2-~ A4.6 Wa~ S~ons I~I~8 -i- 01~9 S-5 ~ ~r F~ P~n 0~9 -2- 0~ A4.7 Wa~ Se~o~ 1 ~1~8 -2- 0~ S~ Penney U~r R~f F~. PL 01~ -2- 0~4~ A4.8 Wa~ S~o~ 1 ~1 ~8 ~ No Re~ion S-7 L~e~ R~f F~ P~n 0~ -2- 0~4~ ~.I Intedor E~va~ 1~1~8-1- 01~9 S~ Bu~ ~ ~ ~uf~ 01~ -2- ~4~ ~.2 [ntedor E~va~ 1 ~10~8 -1- 01~ S-9 Bldg. ~ & ~ B.M. S~. 01~9 -2~ ~.3 Intent EIeva~o~ I~1~8 -1- 0i~ S-10 Bu~ ~on 01~ -2- ~.4 Intedor E~vaUo~ 1~10~8 -1- 01~g ~11 Bu~mg Se~on 0~9 -2- 0~4~9 ~.5 Intedo~ E~va~ons I~1~8 ~ Np Re~ion ~12 Bu~ng ~on 0~9 ~.6 Intedor Eievafio~ 1~1~8 -I- 01~9 ~13 Bu~g Pa~[ Se~o~ l~10~8 -2- ~.7 Intedor E~vaU~ & S~ons 1~1~8 -I- 01~. ~14 Steel ~n~ ~ & ~ 0~9 -2- ~.8 Intedor S~o~ N~ Issu~ ~t S Pi~e ~ps ~ & ~ 0~ -2- 0~4~ ~.9 1' ~. Intedor ~ To~t ~. 1~1~8 ~ No R~n ~16 Pae Caps ~ & ~ 0~ -2- 0~4~ ~.10 ~ ~. Intedo~ EE~ To~t ~. 1 ~1~8 -I- 01~9 ~17 S~u~l S~ & ~iis 0~ -2- 0~4~ A5.11 3~ FL Intedor E~ns Toilet ~. 1 ~1 ~8 ~ No Rev~ion S-18 Pile Caps Se~o~ & ~ta~s 0~9 -2- O~4~g AS. 12 4~ & 5~ FL Intedor ~v. Toilet Rm. 1 ~l 0~8 ~ No Re~sion S-19 P~ie Caps Se~ions & ~ta~s 01~9 -2- 0~9 A6.i Ground Level Re~ ~{~ing 1~10~8 -1- 01~9 S-20 Gen. Ntes,S~nds, Sec. & OeL 0~0~9 -2- 0~4~9 A5,2 Plaza Level Re~ ~ing 1~10~8 -2- O~4~9 S-21 _ ~QL~j[s Reinf. pl~.~p:. ~)~9~4~9_ A6.3 - ' 3~ Fio~r R&fle~ ~iUhg 1 ~10~8 -2- 0~9- ~-~ ShearWa~ Reinf. Pin. & Sec. 01~9 -2- 0~4~9 A6.4 4th Floor ReRe~ ~iUng 1 ~I 0~8 -2- 0~4~9 S-23 Pile Caps Se~o~ & Detai~s 0~9 -2- 0~4~9 A6.5 5th Floor Refle~ ~g ~ ~1 ~8 -2- 0~4~9 S-24 Ground Fbor PaPal Plan 01~9 -2- 0~4~ A6.6 Me~anine Refl~ ~iling I~1~8 -1- 01~9 S-25 P~a Level Pa~a[ P~n 01~9 -2- 0~4~9 A7.1 Stair ~1 - Plan, S~ns & ~tails 1~10~8 -1- 01~9 . S-26 Budding Se~ 0i~ -2- 0~ A7.2 Stair~2-Plan.~ns&~ta~s 1~I~8-1- 01~ fS-Zr ~nemtorE~um*P~ns 0~9-2-0~ 0~9 -2- 0~ ~/1~~ ,ECHANICAL D~NGS O~ Date - Re~.No. - Rev- PAGE 2 SEC-10 Flee. Sec Systems CC~ Riser 02~4/99 .~. 02~4/99 PZ 2 Plaza F. P Plumb. Dom. ~r.&San 12/I0/98 -2- 0~4/99 12 December 1998 PZ 5 3" Floor Plan Plumbing I ~10/98 -2- 02~4/99 P5.1 Padial Plumbing P~n l~& ~ F~r P5.2 Pa~ial Plumbing Plan 3~ Flor 1~I~8 -2- 0~4~9 CONTACTING REQUIREMENTS P6.1 Plumbing Iso~tfi~ ~ ~10~8 -2- 0~4~9 ~520 ~ement FO~ 0~29~ ~pE~tions and ~tes fo~ Paymen[ 2 ~IRE PROTECTION O~NGR 0i292 S~u~ o~ Values 2 FPI.1 S~. L~end & NoIes F~ ProL ~1~8 -1- 01~9 0~310 Pr~e~ Manage~nt and ~oMinatioa 4 FP2.0 S~e P~n Fke Prot~on 1~1~8 ~ No Re.ion 0132[ ~n Phot~p~ 2 FP2.1 Ground ~ ~e Pro~e~on Plan ~1~8 ~ No Re~n 0~323 Ne~ ~a~ S~ules 4 FP2.2 S~nd F~r F~ Pro[~on P~n 1 ~1~8 ~ No Re~ion 013~ Shop D~s. P~u~ Data, a~ Sables 5 FP2.4 Fou~ F~r ~ Pint.on ~n 1~1~ ~ No ~n 014~ T~ ~mto~ S~s 4 FPZ6 Pen~u~ & R~ ~ PmL PL 1~1~8 ~ No ~ 5 016~0 Ba~P~u~R~u~n~ 2 ' ~LECTRICAL O~NG~ 016~ P~u~ S~n Pr~ums 5 E2,9 Ele~l ~ ~ Syste~ p~n 1~0~8 -~- 01~ 02511 D~inf~on of Water D~on 3 ~.l 0 E~I Fou~ R~t ~h~ P~n l~f0~8 -2- ~ 02535 S~e San~ S~mge U~es 5 E2.12 E~I Fou~ ~t S~t~ P~n l~l ~8 -1- 0 I~9 02743 B~u~ ~a~te Parent 6 ~.13 FleXI ~ ~t ~h~ng P~n ~1~8 -2- 0~ 02753 Po~ ~nt ~n~te Pave~nt E2.16 Ele~l R~f Plan 1 ~1 ~8 -2- 0~4~9 0282~ Chain ~k Fends a~ Gates 5 E3.4 Ele~fi~l ~ure S~ule & ~sem 1~10~8 -1- 01~9 03 I~ ~n~ete Fo~s and A~sso~s E3.5 ~nlarg~ Ele~fi~l R~ms & E~v. I~10~8 -2- 0~4~9 03151 ~pa~ion and ~n~on Join~ 3 E3.6 Enlarged EI~I R~s & Bev. 1~i~8-1- 0f~9 032~ ~n~ete Relnfor~n[ 4 E3.7 Enlarged EIe~fi~l R~ms &EIev. 1~10~8 -2- 0~ .03~ Cast~ ~n~ete 9 I / ~ ~ I 0~ ~n~te Curing ~ 3 0~70 ~p Pr~ ~a~te 7 OJ J2'3 L,gh~,e,gh~ Insulating Con¢~ele Roo~ Deck S PAGE 3 0;'550 Modified Biluminou$ Membrane Roor~ng 7 15910 Ou~o~ S~ciaRies ~ 7 07520 Shee[ Me~aI Flashing and Trim 5 15930 Te~inal Unit ~ I 07840 Fires[opplng 4 15g~ Controls ~3~0 ~mic ~ 5 ~6~ ~h~g 5 ~5~0 ~us~l ~s 5 I~0 ~h~ Pm(~on 8~t~ 6 ~ G~n~e F~ 6 1670~ ~~ ~l Pm~ S ~3 R~Fmnt S~t ~ 5 1~ Tm~ Vo~ge S~e S~pm~om 12 ~723 ~ Wa~ ~e~ 5 16740 ~ fo~ S~t~ 5 p~S ON 10 - SPECIAL~E~ ~0170 P~s~c To,et ~a~n~ 4 - ~D OF (NO~ OF SPECIFICA~ONS - 10526 F~ ~nguis~m, ~b~. a~ ~s~s 3 Addendum ~1 Native (20 Pages) Oared 22 Janua~ 1999 108~ To~ Ba~. a~ ~u~ ~ 6 11192 ~ Holl~ Meal 7 1~ Basic Me~an~l Mate~ & Me~s