Loading...
99-029RESOLUTION NO. 99-29 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF AVENTURA, FLORIDA, AUTHORIZING THE CITY MANAGER TO EXECUTE THE ATTACHED WORK AUTHORIZATION NO. 99-186-A FOR PROFESSIONAL DESIGN SERVICES FOR BISCAYNE ($/6) PHASE II AND REMAINING PORTION OF FEC LANDSCAPE BUFFER BY AND BETWEEN THE CITY OF AVENTURA AND O'LEARY DESIGN ASSOCIATES, P.A.; AND PROVIDING AN EFFECTIVE DATE. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF AVENTURA, FLORIDA, THAT: Section 1. The City Manager is hereby authorized to execute the attached Work Authorization No. 99-186-A ($72,505.00) for professional design services by and between the City and O'Leary Design Associates, P.A.. Section 2. The City Manager is authorized to do all things necessary to carry out the aims of this Resolution. Section3. This Resolution shall become effective immediately upon its adoption. The foregoing Resolution was offered by Commissioner Vice Mayor Rogers- Libert, who moved its adoption. The motion was seconded by Commissioner Cohen, and upon being put to a vote, the vote was as follows: Commissioner Arthur Berger absent Commissioner Jay R. Beskin yes Commissioner Ken Cohen yes Commissioner Harry Holzberg yes Commissioner Jeffrey M. Perlow yes Vice Mayor Patricia Rogers-Libert yes Mayor Arthur I. Snyder yes Resolution No. 99- 2_9 Page 2 ~F¥1'-HUR I. SI(IYDEI~, MAYOR ATTEST: TERESA M. SOROKA, CMC/AAE CITY CLERK APPROVED AS TO LEGAL SUFFICIENCY: CITY ATTORNEY EMS/tms EXHIBIT 'A' WORK AUTHORIZATION NO.99-186-A LANDSCAPE DEVELOPMENT - BISCAYNE FIVE & SIX SR5/BISCAYNE BOULEVARD MIAMI GARDENS DRIVE TO AVENTURA BOULEVARD FOR AVENTURA, FLORIDA SCOPE OF CONSULTING SERVICES BETWEEN THE CITY OF AVENTURA, FLORIDA AND O'LEARY DESIGN ASSOCIATES, P.A. JUNE 1, 1999 EXHIBIT 'A' WORK AUTHORIZATION NO. 99-186-A LANDSCAPE DEVELOPMENT - BISCAYNE FIVE & SIX SR5/BISCAYNE BOULEVARD MIAMI GARDENS DRIVE TO AVENTURA BOULEVARD FOR AVENTURA, FLORIDA SCOPE OF CONSULTING SERVICES PREAMBLE The Consultant proposes to provide professional services associated with the preparation of landscape plans for the City of Aventura. 1.0 Preparation of Construction Plans and Bid Documents. The consultant will prepare detailed construction plans and bid documents to include landscaping and irrigation. These services will include coordination with the Florida Department of Transportation and the Florida East Coast Railroad. The Consultant will include in this contract, the services of Bailey Engineering Consultants, Electrical Engineers, for electrical service to irrigation controllers. The Maintenance of Traffic plans and concrete separator removal plans will be prepared by Keith and Schnars, City Engineers, and the cost of these services will be invoiced by Keith and Schnars directly to the City of Aventura. 2.0 Bidding Phase The Consultant shall assist the City of Aventura in securing competitive bids for this project. These services will include attendance at a pre-bid conference, answering of bidders questions during Bidding Phase, issue addenda, evaluation of competitive bids, and written recommendation of successful bidders. 3.0 Construction Administration Phase The Consultant will administer construction of this project as follows: Attend pre-construction "kick-oW' meeting. Attend all coordination meetings with City and Florida Department of Transportation. Perform periodic observations during the construction process. Complete all meeting minutes and project correspondence. Review and approve contractor's shop drawings and payment requisitions. Secure a permit from the Florida Department of Transportation. Complete final inspection and final punch-list and issue Notice of Acceptance to contractor. Secure all warranties and operating manuals and remit to City. I O'LEARY DESIGN ASSOCIATES., P.A. Landscape Architects WAGE RATE CERTIFICATION DATE; JUNE 1, 1999 PROJECT NO: 99-186-A PROJECT: LANDSCAPE DEVELOPMENT - BISCAYNE FIVE & SIX SR5/BISCAYNE BOULEVARD (MIAMI GARDENS DRIVE TO AVENTURA BOULEV AVENTURA, FLORIDA PROJECT MANAGER: WILLIAM A. O'LEARY TASK NAME: LANDSCAPE ARCHITECTURAL SERVICES TASK HOURLY PROPOSAL CLASSIFICATION HOURS RATE DOLLARS 1. PROJECT MANAGER 217 95 $ 20,615.00 2. LANDSCAPE ARCHITECT 325 80 $ 26,000.00 TOTAL HOURS TOTAL DOLLARS $ 46,615.00 REIMBURSABLE EXPENSES SUB-CONSULTANT 'B' SUB-CONSULTANT 'C' SUB-CONSULTANT 'D' TRAVEL PRINTS/GRAPHICS/INCIDENTALS A. TOTAL REIMBURSABLE EXP. DIRECT EXPENSES: SUB-CONSULTANT 'A' (ENVIRONMENTAL AUDIT) SUB-CONSULTANT 'B' ARCHITECT SUB-CONSULTANT 'C' ELECTRICA SUB-CONSULTANT 'D' GRAPHICS B. TOTAL DIRECT EXPENSES 3. TOTALDIRECTLABOR TOTAL BUDGET (A+B+C) PREPARED BY WAO APPROVED BY:WAO EST. COST RELATED PRINT NO. $ 1,550.00 $ 1,550.00 $ 3,800.00 $ 3,8O0.00 $ 46,615.00 $ 51,965.00 6/1/99 6/1/99 WORK AUTHORIZATION NO. 99-186-A The City of Aventura has requested Work Authorization No. 99-186-A, as provided for in the agreement between the City of Aventura and O'Leary Design Associates, P.A. and approved by the City Commission on August 20, 1996. This Work Authorization No. 99-186-A provides for Landscape Architectural services in accordance with Articles 3 and 4 of the agreement as further detailed in the scope of services Exhibit A. Payment for such services shall be in accordance with Article 5 of the agreement. Total estimated labor expenses are ............ $46,615.00 Total estimated direct expenses are ............ $ 3,800.00 Total estimated reimbursables are .............. $1,550.00 By: d~~ d/~/O'LEARY DESIGN ASSOCIATE(S~ WILLIAM A. O'LEAR~(, FA-SLA ( ATTEST: ~.City Clerk TERESA M. SOROKA CITY: CITY OF AVENTURA, FLORIDA through ~AGER/ By: ~itR~sa~ecrR ~OKA day of ,19 APPROVED AS TO FORM Cit WEIS S-SEROTA-HELFMAN Notice to Proceed Yes No Project Initiation Date RECOMMENDED through its CAPITAL PROJECTS MANAGER By: ~--"~"~-- - ' ~ Capital Projects Manager ANTONIO F. TOMEI t'-/ day of 0~/2~/~999 ~6~5~ ~5~5~040 May28, 1999 Mr. William O'Leary O'LeaEf Design Associates, P.A. Oak Plaza Center 8525 S.W. 92~a Street, Suite C11 Miami, FL 33156 Re: Biscayne 5 & 6 Lm~dscaping Aventura Florida Dear Mr. O'Leary: We are pleased to submit our proposal for electrical engineering services for the above project. Our services shall include the fbllowing: Completed tracings of drawings for the work, covering all phases of om' design, in accordance with a format determined by you. 2. Final project specifications. Final cost estimate for the work performed under this agreement. Attend meetings to answer questions relevant to our design. 4. Sen,ices dm-lng bidd, ing. 5. Coordination witla FP&L tbr electric service requirements. Our scope of services shall haclude the design of an eleclaical system to provide service to the proposed irrigation pumps on Biscayne Boulevard. Our fee for this work shall be $2,600.0, payable as follo~vs: 50% Complete - When Pla~.s are 50% Complete 100% Complete - When Plans are Complete $ 1,300.00 $ 1,300.00 Very truly yours, Lillian M. Reyes, P.E. ACCEPTED DATE F/4797D.wpd May 28, 1999 Mr. Willian~ O'Leary O'Leary Design Associates, P.A, Oak Plaza Center 8525 S.W. 92~a Street, Suite C11 Miami, FL 33156 Biscayne 5 & 6 Landscaping Aventm.a, Florida Dear Mr. O'Leary: We are pleased to submit this revised proposal for our general services during construction for the above project. Our services shall be for the electrical work shown on our drawh~gs and shall consist of the ~:bllowi.ng: Shop drawings will be reviesved to determine their conformance with the design drawings. The scope of field monitoring services will be limited to two (2) site visits provided for the purpose of assessing general conformance of the work with design drawings and specifications. It is understood that Bailey Engineering Consultants, Inc. will not be peri:brining detailed quality control and inspection services such as checking the installation of conduits .for co~fformity with the electrical drawings attd appmpr/ate manu/hcturer's shop drawings, The work will be perfomaed under a lump sum contract o£$1,200,00. Payment for services shall be prorated over the consmmfion period of thc project. Very truly 7.curs, L' 'an. M. Reyes, P.E. ACCEPTED DATED tD8999G,vq>~