Loading...
99-005 RESOLUTION NO. 99-05 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF AVENTURA, FLORIDA, AUTHORIZING THE CITY MANAGER TO EXECUTE THE ATTACHED WORK AUTHORIZATION NO. 15414.54 FOR PREPARATION OF CONSTRUCTION DOCUMENTS FOR PEDESTRIAN SAFETY IMPROVEMENTS ON COUNTRY CLUB DRIVE BY AND BETWEEN THE CITY OF AVENTURA AND KEITH AND SCHNARS, P.A.; AUTHORIZING THE CITY MANAGER TO DO ALL THINGS NECESSARY TO CARRY OUT THE AIMS OF THIS RESOLUTION; AND PROVIDING AN EFFECTIVE DATE. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF AVENTURA, FLORIDA, THAT: Section 1. The City Manager is hereby authorized to execute the attached Work Authorization No. 15414.54 ($80,695) for the preparation of construction documents for pedestrian safety improvements on Country Club Drive by and between the City and Keith and Schnars, P.A. Section 2. The City Manager is authorized to do all things necessary to carry out the aims of this Resolution. Section3. This Resolution shall become effective immediately upon its adoption. The foregoing Resolution was offered by Commissioner Rogers-Libert, who moved its adoption. The motion was seconded by Commissioner Berger, and upon being put to a vote, the vote was as follows: Resolution No. 99-o_.~5 Page 2 Commissioner Arthur Berger 3,es Commissioner Jay R. Beskin absent Commissioner Ken Cohen yes Commissioner Jeffrey M. Perlow yes Commissioner Patricia Rogers-Libert yes Vice Mayor Harry Holzberg 3,es Mayor Arthur I. Snyder y~ PASSED AND ADOPTED this 2nd day of Febr~y, 199~ /~ ~I~'['HUR I. S~DE~, MAYOR ATTEST: TERESA M. SMITH, CMC CITY CLERK APPROVED AS TO LEGAL SUFFICIENCY: KEITH and SCHNARS, P.A. E N G~ N E E R S ,* P L A N N E R $" S U R V E Y O R S WORK AUTHORIZATION NO. 15414.54 The City of Aventura has requested Work Authorization No. 15414.54, as provided for in the agreement between the City of Aventura and Keith and Schnars, P.A. and approved by the City Commission on August 20, 1996. This Work Authorization No. 15414.54 provides for technical services in accordance with Articles 3 and 4 of the agreement as further detailed in the scope of services in Exhibit A. Payment for such services shall be in accordance with Article 5 of the agreement. Estimated Labor Expenses Reimbursables Conceptual Traffic Design & Coord. $4,180.00 Engineering Design Services $19,870.00 $1,000.00 Permitting Services $3,980.00 Bidding Services $3,690.00 Construction Services $12,055.00 $1,000.00 Subconsultant Services Landscaping Design Services $8,600.00 $600.00 Landscaping Bid Services $1,000.00 Landscaping Construction Services $2,600.00 Electrical Design Services $13,500.00 Electrical Construction Services $5,500.00 10% Project Management (K&S) $3,120.00 Total Estimated Labor Expenses are $78,095.00 Total Estimated Reimbursables $2,600.00 The time period for this work authorization will be: Preliminary Design 30 Days Final Construction Plans 30 Days Permitting Phase 30 Days Construction Phase 120 Days 6500 North Andrews Avenue · Ft. Lauderdate, Florida 33309-2132 (954) 776-1616 ° (800) 488-1255 · Fax (954) 771-7690 CITY OF AVE~, FLORIDA / ATTEST through ~anager / BY City Manager ~, / City Clerk Teresa M. Smith Edc M. Soroka ~./ day of ~¢_.,~1/~ . , 1999 APPROVED AS TO FORM BY C~,~y ,-,L~u,,,uy Notice to Proceed __ Yes __ No Weiss Serota & Helfman, P.A. Project Initiation Date RECOMMENDED through its ClP Project Manager Capital Project Manager Antonio F. Tomei dayof ~..¢v, , /~/ 1999 Exhibit A Work Authorization No. 15414.54 Preparation of Final Construction Documents for Pedestrian Safety Improvements West/North/East Country Club Drive Scope of Consulting Services between The City of Aventura, Florida and Keith and Schnars, P.A. January12,1999 Exhibit A WORK AUTHORIZATION NO. 15414.54 Preparation of Final Construction Documents for Pedestrian Safety Improvements West/North/East Country Club Drive SCOPE OF CONSULTING SERVICES PREAMBLE CONSULTANT proposes to provide professional services associated with the preparation of construction documents for pedestrian safety improvements as listed in the Final Engineering Design Section (1.03) of this proposal. The proposed design will incorporate elements delineated in the Pedestrian Circulation Study prepared by Keith and Schnars under Work Authorization No. 15414.09.09001. Specific elements of the design shall include, but not be limited to, the geometric design, horizontal alignment, grading, clear zones, sight distance, landscaping, electrical, pavement marking and signage. 1.0 Engineering Design Services 1.01 Conceptual Traffic Design & Coordination Based on the information provided in the Country Club Drive Pedestrian Circulation Study prepared in December 1996, the CONSULTANT shall develop more detailed locations of proposed crosswalks and design treatments and perform the necessary contacts and reviews with Miami- Dade County Public Works Department (MDPWD) to obtain approval of the traffic engineering devices. Specific activities include: · Verification of sight distance requirements and availability for such proposed crosswalk locations. · Development of conceptual design treatments to insure that good (above minimum) safety is provided for pedestrians through enhanced advance signing and pavement markings. · Investigation of need and potential for flashing advance signs, overhead signing, active signing or in-pavement lighting. · Determination of overhead lighting requirements for enhanced visibility of pedestrians during early morning and evening hours. · Coordination with MDPWD traffic engineering staff and/or manage- ment. t.02 Preliminary Design The CONSULTANT shall prepare a preliminary design plans for review by the City of Aventura and regulatory agencies. Prepare an opinion of probable cost for the proposed improvements. 1.03 F~nal Enqineering Design The CONSULTANT shall prepare final construction documents for the following pedestrian safety improvements: 1. Installation of a crosswalk with signal heads at the intersection of the Lehman Causeway and West Country Club Drive (N.E. 192nd Street). Specifically, across West Country Club Drive to the new sidewalk south of the Lehman Causeway. 2. Upgrade existing pedestrian crosswalk at Turnberry Isle Club and Resort. 3. Sidewalk connections to five (5) bus stops along Country Club Drive. 4. Realignment of walkway and sidewalk approaches at both sides to major driveways (approximately 30 driveways, not including the intersections of Country Club Drive and Aventura Boulevard and Country Club Drive and N.E. 34th Avenue). 5. Five (5) additional crosswalks across Country Club Ddve. 6. Installation of ground lighting along Country Club Drive exer- cise/walking path. The final construction documents shall include the following: · Project manual including the contract documents and specifications. * Construction plans at 1" = 40' scale as follows: Title Sheet & Location Map Engineering Design Survey Demolition Plans Paving, Grading and Drainage Plans Paving, Marking and Signing Plans Electrical Plans Landscaping Plans Construction Details 1.04 Permitting Phase The CONSULTANT shall provide technical criteria, written description and design data for use in filing the application for permits with agencies having jurisdiction to rewiew the design of the project. Permit fees are the responsibility of the CLIENT and are not included within this agreement. Permit applications will be submitted to the following regulatory agencies: 1. Metropolitan Dade County Public Works Department (Traffic Engineering only). 2. DERM. 3. City of Aventura. 1.05 Meetings The CONSULTANT shall allotJattend three (3) hours/week for meetings for a period of twelve (12) weeks required to review the work tasks associated with this proposal. At the request of the CLIENT, the CONSULTANT will attend any additional meetings that will be billed on an hourly basis under the General Engineering Assistance No. 15414.00.05001. as provided for in the agreement between the City of Aventura and Keith and Schnars, P.A. and approved by the City Commission on August 20, 1996. 2.0 Bidding or Negotiating Services The CONSULTANT, following the City's approval of the Construction documents ("Construction documents" shall mean the entire contract for construction, including all addendums or alterations thereto, drawings and technical specifications) and of the latest Statement of Probable Construction Cost, shall assist the City in obtaining, evaluating, awarding and preparing construction contracts. The CONSULTANT will prepare bid packages and release them to contractors and assist in the selection of a contractor. Services include but are not limited to, a review of contract proposals, review of contractor's submitted credentials, subcontractor's submitted credentials, to assist the City in their selection of a contractor. 3.0 Construction Services The CONSULTANT shall provide construction observation services necessary to certify to the regulatory agencies that the construction work has been completed in substantial compliance with the approved documents and permits. Services included in this item are described as follows: a. Shop drawinqs: The CONSULTANT will review shop drawings, samples, other data and reports which the selected contractor is required to submit for review, but only for the conformance with design concept of the project and compliance with the information given on the design drawings. Such review shall not extend to means, methods, techniques, sequence or procedures of construction or to safety precautions and programs incident thereto. b. Site Visits: CONSULTANT shall make visits to the site at intervals appropri- ate to the vadous stages o1: construction as CONSULTANT deems neces- sary in order to observe as an experienced and qualified design professional the progress and quality of the various aspects of the contractor(s)'s work. c. Inspections and Tests: The CONSULTANT shall observe the utility testing required in final certification to certify to the responsible utility entity (the actual testing will be by others). d. Construction Observation: Service shall include coordination with contrac- tor(s) and responsible utility entity to facilitate construction of the improve- ments contained in the design plans including any preconstruction meetings. Inspections will be performed as required for permits, record ;drawings, information, and final utility certification. e. Final Certification: The CONSULTANT will prepare the final certification and process record drawings for the design from the survey information to be supplied by the contractor or by other means agreed to by both CONSUL- TANT and CLIENT and certified to the appropriate agencies. 4.0 Landscaping Design Services (See attached proposal.) 5.0 Electrical Design Services (See attached proposaL) INPROJECT WORK AUTHORIZATION PROJECT UMBER 15414 NUMBER 15414.54 MANAGER: FrankDeLuca TASK NAME: COUNTRY CLUB DRIVE IMP. - CONCEPTUAL TRAFFIC ................ DESIGN & COORD. DEPT. CODE: 09 PAGE 1 OF 5 TASK CLASSIFICATION HOURS_ ~ RATE DOLLARS RELATED Proposal Preparatio~/ REIMBURSABLE EXPENSES: EST. COST PRINT NO. 02 Admin. Asst. $35.00 $280.00 SUBCONSULTANT A $ 04 Communi__~ Liaison $60,00 SUBCONSULTANT B 06 CADD Operator $65.00 SUBCONSULTANT C 07 Scientist Il $75.00 SUBCONSULTANT D 08 Economic/Financial Analyst ~" $75.001 PERMIT FEES 09 Scientist I lat/J~B~a $60.0( TRAVEL 11 Graphic D~igner ~ $60.0( EQUIPMENT/SUPPLIES 12 Landscape Architect RLA~._~)__/ $85.0( PRINTS & GRAPHICS 13 Field Representative $55.0( 14 Landscape Designer __ $65.0( 15 Planner (AICP) $75.0( A. TOTAL REIMBURSABLE EXP 16 Associate Planner $60.0( 17 Project Engineer/Designer~ ~ $65.0( DIRECT EXPENSES: 18 Project Man~ager I ~ $85.0( SUBCONSULTANT A 19 Professional Engineer (P.E.~)/ $85.0( SUBCONSULTANT B 20 Prof. Land Su~e~r (P.L.S. & Mapper~ $75.0( -- SUBCONSULTANT O 21 Senior Project Manager __ $120.0~ $2,880.001 SUBCONSULTANT D 22 Senior Member $175.0( BLUEPRINT/REPROS 23 Senior Project Engineer $75.0( PERMIT FEES 24 Project Manager II ~ $95.0C $760.0( MEALS 25 Technician II/ $60.0C __ EQUIPMENT/SUPPLIES ~r III $105.0C -- 29 Technician I $55.0¢ 30~Tronspodation Planner $65.0¢ $260.0(; 32 Senior Field Representative $75.0C B. TOTAL DIRECT EXPENSES 42 Survey Party ~ $85.0C 43 Spec. Survey Pady ~ Ouote C. TOTAL DIRECT LABOR $4,180.00 T&M TOTAL BUDGET $4,180.00 (A+B+C) PREPARED BY: FD DATE: 1/6/99 TOTAL HOURS ~ ~ APPROVED BY: FD DATE: 1/6/99 TOTAL DOLLARS $4,180.0~~ (Dept, Director) 04/o1~$ PROJECT WORK AUTHORIZATION PROJECT NUMBER 15414 NUMBER 15414.54 MANAGER: Wilson Sanchez TASKNAME: COUNTRY CLUB DRIVE IMPROVEMENTS - FINAL DESIGN PHASE DEPT. CODE: 05 PAGE2OF5 TASK I .OURLV PROPOSAL CLASSIFICATION HOURS I RATHE D~OLLARS_ RELATED Proposal PreparationI REIMBURSABLE EXPENSES: EST. COST PRINT NO. 02 Admire Asst. I $35.00 SUBCONSULTANT A $ 04 Communit~ Liaison I $60.00 SUBCONSULTANT B 06 CADD Operator I SUBCONSULTANT C 07 Scientist II I ~ SUBCONSULTANT D 08 Economic/Financial AnaJyst I ~ PERMIT FEES 09 Scientist I TRAVEL 121 I~G rephiCLandscapeDeSigner Architect II $60.00 EQUIPMENT/SUPPLIES I PRINTS & GRAPHICS $1,000.00 14 Landscape Designer I ~6~.00 15 Planner (AICP) / ~ A. TOTAL REIMBURSABLE EXP $1,000.00 16 Associate Ptanner ~ $60.00 17 Project Engineer/Designer/ $65.00 $11,700.00 DIRECT EXPENSES: 18 Project Manag~er I $85.00 $3,400.00 SUBCONSULTANT A 19 ProfeSsional Engineer (_P.E.) $85.00 SUBCONSULTANT B 20 Prof. Land Surveyor (P.L.S. & Mapper) $75.00 SUBCONSULTANT C 21 Senior Project Manager 21 $120.00 $2,520.00 SUBCONSULTANT D 22 Senicr Member $175.00 BLUEPRINT/REPROS 23 Senior Project Engineer 30 $75.00 $2,250.00 PERMIT FEES 24 Project Manager II $95.00 __ MEALS 25 Technician II __ $60.00 -- EQUIPMENT/SUPPLIES ~l~ $105.00 29 Technician 1 $55.00 30 Tranaporta~tien Planner $65.00 32 Senior Field Representative $75.00 S. TOTAL DIRECT EXPENSES 42 Survey Party __ ~ $85.00 ~ Spec. Survey Party Quote C. TOTAL DIRECT LABOR $19,870.00 T&M TOTAL BUDGET $20,870.00 (A+B+C) PREPARED BY: WS DATE: 1/6/99 :TOTAL HOURS I I APPROVED BY: PRG DATE: 1/6/99 TOTAL DOLLAR~I $19,870.~ (Dept. Director) 04/01~6 PROJECT WORK AUTHORIZATION PROJECT NUMBER 15414 NUMBER 15414.54 MANAGER: Wilson Sanchez TASK NAME: COUNTRY CLUB DRIVE IMPROV~EMENTS - PERMITTING PHASE DEPT. CODE: 05 PAGE 3 OF 5 TASK / HOURLY PROPOSAL [ CLASSIFICATION HOURS/ RATE D~OLLAR~S RELATED Proposal Preparation REIMBURSABLE EXPENSES: EST. COST PRINT NO. 02 Admln. Asst. $35.00 $280.00 SUBCONSULTANT A $ 04 Communl~Lialson $60,00 __ SUBCONSULTANT B 06 CADD Operator $65.00 SUBCONSULTANT C 07 Scientist II $75.00 SUBCONSULTANT D 08 Economic/Financial Analyst $75.00 PERMIT FEES 09 Scientist I $60.00 TRAVEL 11 Graphic Designer $60.00__ EQUIPMENT/SUPPLIES 12 Landscape Architect R ~_~ $85.00 -- PRINTS&GRAPHICS $500.00 13 Field Representative $55.00 14 Landscape D~signer $65.00 15 Planner (AICP) $75.00: -- A. TOTAL REIMBURSABLE EXP $500.00 16 Associate Planner $60.0~ 17 Project En~gineer/Designer $65.0{ $1,690.00 DIRECT EXPENSES: ~__ $85.0{ $1,530.00 SUBCONSULTANT A 19 Professional Engineer (?.E.) $85.0£ __ SUBCONSULTANT B 20 Prof. Land Su~e_~r (P.L.S. & M~ $75.0{ SUBCONSULTANT C 21 Senior Project Manager $120.0~ $480.0£ SUBCONSULTANT D 22 Senior Member $175.0C __ BLUEPRINT/REPROS 23 Senior Project Engineer $75.0£ PERMIT FEES 24 Project Manager II $95.0(; MEALS 25 Technician 11 $60.0(; EQUIPMENT/SUPPLIES 26 Project Mana_~ger III $105,0C 129 Technician I $55.0C 30 Transportation Planner $65.0~ 32 Senior Field Representative $75.00 B. TOTAL DIRECT EXPENSES 42 Survey Parly $85.00 43 Spec. Sur~y Party "Quote C. TOTAL DIRECT LABOR $3,980.00 T&M TOTAL BUDGET $4,480.00 (A+B+C) PREPARED BY: WS DATE: 1/6/99 TOTAL HOURS ~ ~ APPROVED BY: PRG DATE: 1/6/99 TOTAL DOLLARS~ $3,980.0~0 (Dept, Director) 04~01/96 LNUMBER 15414 NUMBER 15414.54 MANAGER: Wilson Sanchez [~~ ~,'~I~c{SUF~L:~,O~' '?' TASK NAME: COUNTRY CLUB DRIVE IMPROVEMENTS - BIDDING SERVICES DEPT. CODE: 05 PAGE 4 OF 5 CLASSIFICATION __ -- DOLLARS RELATED Proposal Preparation REIMBURSABLE EXPENSES: EST. COST PRINT NO. 02 Admin. Asst. SUBCONSULTANT A $ 04 Communi~ Liaison __ ~ $60.00 SUBCONSULTANT B 06 CADD Operator ~ ~ SUBCONSULTANT C 07 Scientist II ~ $75.00 SUBCONSULTANT D 08 EconomicJFinencial Analyst ~ ~O0 PERMIT FEES 09 Scientist I ~ ~ TRAVEL 11 Graphic Designer ~ $60.00 EQUIPMENT/SUPPLIES 12 Lendsc~ape Architect R~)~ ~ -- $8~.~ PRINTS & GRAPHICS 13 Field Representetive ~ ~ 14 Landscape Designer ~ ~o0 15 Planner (AICP) ~ ~ A. TOTAL REIMBURSABLE EXP 16 Associate Planner ~ ~ 17 Pro~ct Engineer/Designer ~ ~ $520.00 DIRECT EXPENSES: 18 P~roject Manager I ~ ~ $1,700.00 SUBCONSULTANT A 19 Professional Engineer (P.E.) ~ ~ SUBCONSULTANT B 20 Prof. Land Surveyor (~P.L.S. & Mappe~) ~ ~ - SUBCONSULTANT C 21 Senior Project Manager ~ ~ $720.0~ SUBCONSULTANT D 22 Senior Member __~ ~ BLUEPRINT/REPROS 23 Senior Project Engineer ~ ~ ~ PERMIT FEES 24 Project Uana~ger II ~ ~O0 MEALS 25 Teshalclen II ~ ~ EQUIPMENT/SUPPLIES 30 Transpodati~ Planner ~ ~ 32 Senior Field Representative ~ ~ B. TOTAL DIRECT EXPENSES 42 Survey Party ~ ~ 43 Spec. Survey Party ~1~ Quo~te C. TOTAL DIRECT LABOR $3,690.00 T&M TOTAL BUDGET $3,690.00 (A+B+C) PREPARED BY: WS DATE: 1/6/99 TOTAL HOURS ~ ~ APPROVED BY: PRG DATE: 1/6/99 TOTAL DOLLARS $3,690.00 (Dept. Director) 04/Ol/96 PROJECT WORK AUTHORIZATION PROJECT NUMBER 15414 NUMBER 15414.54 MANAGER: Wilson Sanchez TASK NAME: COUNTRY CLUS DRIVE IMPROVEMENTS - CQNSTRUCTION PHASE DEPT. CODE: 05 PAGE 5 OF 5 TASK / HOURLY PROPOSAL CLASSIFICATION HOURS RATE DOLLARS RELATED Proposal Preparatio~ ~ REIMBURSABLE EXPENSES: EST. COST PRINT NO. 02 Admin. Asst. LB $35.00 SUBCONSULTANT A $ 04 Communi~Llalson q $60.00 SUBCONSULTANT S 06 CADD Operatort $65.00 SUBCONSULTANT C 07 Scientist II $75.00 SUBCONSULTANT D 08 Economic/Financial Analyst $75.00 PERMIT FEES 09 Scientist I $60.00 TRAVEL $500.00 11 Grephic Designer ~ $60.00 EQUIPMENT/SUPPLIES 12 La~dsca[3e Architect (RLA)/ $85.00 PRINTS & GRAPHICS $500.00 13 Field Representative __ $55.00 14 Landscape Designer ~ $65.00 15 Planner (AICP) __ ~ $75.00 A. TOTAL REIMBURSABLE EXP $1,000.00 1~6 _Asscciate Planner $60.00 17 Project Engineer/Designer ~ $65.00 DIRECT EXPENSES: 1~8~1/ $85.00 $1,360.00 SUBCONSULTANT A 19 Professional Engineer (P.E.) $85.00 SUBCONSULTANT B 20 Prof. Land Surveyor (P.L.S. & Mepper~ $75.00 SUBCONSULTANT C 21 Senior Project Manager $120.00 $720.00 SUBCONSULTANT D 22 Senior Member $175.00 BLUEPRINT/REPROS 23 Senior Project Engineer __~. $75.00 $3,225.00 PERMIT FEES 24 Project Manager III $95.00 MEALS 25 Technician II $60.00 EQUIPMENT/SUPPLIES ~ $1o5.0( 29 Technician I $55.0( 30 Tr~sportation Planner $65.0( 32 Senior Field Representative $75.0( $6,750.00 B. TOTAL DIRECT EXPENSES 4~2 Survey Party $85.0~( __ 43 Spec. Survey Party Quote C. TOTAL DIRECT LABOR $12,055.00 T&M  TOTAL BUDGET $13,055.00 _ (A+B+C) PREPARED BY: WS DATE: 1/6/99 TOTAL HOURS ~ APPROVED BY; PRG DATE: 1/6/99 TOTAL DOLLARS $12.055.0~ (Dept. Director) 04/0~/96 O'LI~A RYD F$ii:NA$$ O¢IATE$ P.A. LA~SCAP~ ARCHtTECTURE LAND ~ANNING URBAN DESIGN GRAPHIC DESIGN ]~tlaI~' 5, 1999 Mr. Wilson Sanchez~ P.E. Project Manager - Keith & Sctmars, P.A. 6500 North Andrews Avenue Ft,'Lauderdale, Florida 33309-2132 Re: 'Safety Improvements for Country Club Drive AventUra, Florida Dear Sanchez: Puxs.u, am to our rec, ent discussion, the fei/owing is an outline of professional laridslc0.pe arcNtectur~l ' se~c~: for :tl~e:imstallaiion of five (5) pedestrian'.ero.~swalks and for realigning, walki~va~,s and Side~valk approaches at the major driveways, located at the abov~ referenced project. These services will in"ciude coordination with Project Electrical Engineer regarding the itlmnination of the jogging path: A) Design Ph~e 1): Prepare file required landscape and h-rigation plans. 2) . Prepare a Statement of Probable Construction Cost B) Bidding Phase 1) Attend pre-Nd conference. 2) ' Respond to bidder inquires. 3) Review landscape and irrigation competitive bids. C) Construction Administration Phase - Perform periodic observations of the landscape and irrigation installation. Our fee For these professional services will be as foilows: CompleEion of hem 'A':- Design Phase $ 8,600.00 Corhpletion of Rem 'B' - Bidding Phase $ 1,000.00 Completion of Item 'C' - Construction Adn~'fistration Phase $ 2,600.00 Total $t2,200.00 OAK PLAZA PROFES5iONAL CENTER 8525 S,'¢L 92ND STRE-ZT, SUITE C11 MIAMI, FLORIO~t 33156 (3051 596-B096[ - : , MEMBERS OF THE AMERICAN SOCi~:TY OF LANDSCAP~ ARCHITECTS January 5, 1999 Mr. Wilson Sanchez- Keith and Scllnars, P.A. 6500 N. Andrews Ave Fort Lauderdale, FL 33309-2132 Re: West Country Club Drixre Walkway Lighting City of Aventura, FL Dear Mt'. Sanchez: We are pleased to submit our proposal for electrical engineering services for the above project. Our services shall include the following: I. Design 1. Evaluation and recommendation of fi. xmre selection. 2. Completed tracings of drawings for the work, covering all phases of mu: design, in accordm~ce with a format determh~ed by you. 3. Photometric evaluation. 4. Final project specifications. 5. Coordination with FP&L for electric service requirements. Final cost estimate for the work performed m~der tiffs a~eement. Attend meetings to answer questions relevant to our design. 12. Construction BEC ;vill make available project representative to assist in the evaluation and recommendation of bids subm;,tted by approved contractors. 2101 ~l. ANDREWS AVENUE, SUITE 100, FORT t_AUDERDAI..E, FLORIDA 33311 (954) 564-3111 FAX: (95.4.) 564-3040 Mr. Wilsou Sanchez 2 January 5, 1999 Review and approve (or take other appropriate action in respect of) Shop Drawings and samples, the results of tests and inspections and other data which _ each Contractor is required to submit, but only for conformance with the design concept of the Project and compliance with the information given in tile Contract Documents (but such review and approval or other action shall not exceed to means, methods, sequences, techniques or procedures of construction or to safety preca-utions and programs incident thereto)i and receive and review (for general content as required by the Specffications) maintenance and operating schedule and instruction, guarantees, bonds and certificates of inspection which are to be assembled by Conlzactor(s) is in accordance with the Contract Documents. 3. Issue all instructions of OWNER to Contractor(s); issue necessary interpretations and clarifications of the Contract Documents; have authority, as OWNER's representative to require special inspection or testing of the work; act as initial interpreter of the requirements of the Contract Documents and judge of the acceptability of the work thereunder, and make decisions onall claims of OWNER and ContraCtor(s) relating to the acceptability of'the WOrk or the interpretation of the requirements of the Contract Documents pertaining to the execution and progress of the work. The ENGINEER shall render all . interpretations or decisions in good faith and in accordance with the requirements of the Contract Documents. 4. Make visits to the site at periods appropriate to the various stages of construction to observe, as an experienced and qualified professional, the progress and quality of the executed work of Contractor(s) and to det:J'a~ine in general if such work is proceeding in accordance with the Contract Documents. Prepare trip reports to document observations made during these inspections. ENGINEER shall not be responsible for the means, methods, techniques, sequences or procedures of construction selected by Contractor(s) or the safety precautions and programs incident to the work of Contractor(s). It is understood that BEC will not be performing detailed quality control and inspection services such as checking the installation of conduits for conformity with the electrical drawings and appropriate manufacturer's shop drawings. ENGINEER's efforts will be directed toward providing a greater de~ree of confidence for OWNER that the completed work of Contractor(s) will conform to the Contract Drawings, hut ENGIXqEER shall not be responsible for the failure of Contractor(s) to perform the work in accordance with the Contract Drawings, During such visits and on the basis of Mr. Wilson Sanchez 3 January 5, 1999 on-site observations, ENGINEER shall keep OWNER informed of the progress of the work, shall endeavor to guard OWNER against defects and deficiencies in such work and may disapprove or reject work failing to conform to the Contract Documents. BEC will make available a project representative to visit the construction site on a periodic basis during project milestones and critical work. BEC reserves the right to rcq~uest additional compensation should construction extend beyond *.he Substantial and/or Final Acceptance periods except for delays resulting fi'om acts or omissions of the Consultant. Our scope of services shall include the walkway lighting design on West Country Club Drive, an overall length of approximately 2.3 miles. Our design shall also include the design for up to two (2) pedesu-ian crossiugs; location to be dctermLned by the City. Our fee for this work sb. all be $19,000.00, payable as follows: When Plans are 20% Complete $ 2,700,00 When Pierre are 50% Complete $ 4,050.00 When Plans are 80% Complete $ 4,050.00 When Plans are 100% Complete $ 2,700.00 Construction Phase - Billed per percent of construction completeness $ 5,500.00 Very truly yours, ACCEPTED .DATE F2149gDO.wpd Mr. Wilson Sanchez, P.E. Jmlu,'u'y 5, 1999 Page two Reimbursable expenses, such as but not limited to, blueprimmg, reproductions, computer plots, Federal Express/courier expenses, and long distance communications will be additional and will be invoiced for al our cost. We estimate that Incidental Expenses will be approximately $600.00. Please let me know if you require any additional information. Very truly your_s, O'LEARY DESIGN ASSOCIATES, PA WILLIAM A. O'LEARY, FASL~A WAO/cas