Loading...
99-004 RESOLUTION NO. 99-04 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF AVENTURA, FLORIDA, AUTHORIZING THE CITY MANAGER TO EXECUTE THE ATTACHED WORK AUTHORIZATION NO. 15414.53 FOR PREPARATION OF ENGINEERING DESIGN SURVEY ON COUNTRY CLUB DRIVES BY AND BETWEEN THE CITY OF AVENTURA AND KEITH AND SCHNARS, P.A.; AUTHORIZING THE CITY MANAGER TO DO ALL THINGS NECESSARY TO CARRY OUT THE AIMS OF THIS RESOLUTION; AND PROVIDING AN EFFECTIVE DATE. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF AVENTURA, FLORIDA, THAT: Section 1. The City Manager is hereby authorized to execute the attached Work Authorization No. 15414.53 ($25,900) for the preparation of engineering design survey on West, East and North Country Club Drives by and between the City and Keith and Schnars, P.A. Section 2. The City Manager is authorized to do all things necessary to carry out the aims of this Resolution. Section 3. This Resolution shall become effective mmediately upon its adoption. The foregoing Resolution was offered by Commissioner Rogers-Libert, who moved its adoption. The motion was seconded by Commissioner Berger, and upon being put to a vote, the vote was as follows: Resolution No. 99- o._~4 Page 2 Commissioner Arthur Berger yes Commissioner Jay R. Beskin absent Commissioner Ken Cohen yes Commissioner Jeffrey M. Perlow yes Commissioner Patricia Rogers-Libert yes Vice Mayor Harry Holzberg yes Mayor Arthur I. Snyder ~ PASSED AND ADOPTED this 2"d day of F~ ~9Z ATTEST: TERESA M. SMITH, CMC CITY CLERK APPROVED AS TO LEGAL SUFFICIENCY: CITY'ATTORNEY KEITH and SCHNARS P.A WORK AUTHORIZATION NO. 15414.53 The City of Aventura has requested Work Authorization No. 15414.53, as provided for in the agreement between the City of Aventura and Keith and Schnars, P.A. and approved by the City Commission on August 20, t996. This Work Authorization No. 15414.53 provides for technical services in accordance with Articles 3 and 4 of the agreement as further detailed in the scope of services in Exhibit A. Payment for such services shall be in accordance with Article 5 of the agreement. Estimated Labor Expenses Reimbursables Engineering Design Survey/Field $16,750.00 Engineering Survey/Office $9,150.00 Total Estimated Labor Expenses are $25,900.00 Total Estimated Reimbursables $0.00 The time period for this work authorization will be: Preparation of Design Survey 60 Days CITY: ATTEST CITY OF AV....E.J~L~URA, FLORIDA/' throug,~j~ity Manager / BY (. -_.__ BY City Clerk City Manage% / Teresa M. Smith Eric M. Sorok~ / ~ dayof /¢__/)'~r~?"-"" ,1999 APPROVED AS TO FORM BY ~__..~ Notice to Proceed __ Yes ___ No Weiss Serota & Helfman, P.A. Project Initiation Date RECOMMENDED through its CIP Project Manager Capital Project Manager Antonio F. Tomei dayof ~ ,I999 6500 North Andrews Avenue · Ft. Lauderdale, Florida 33309-2132 (954) 776-1616 · (800) 488-1255 · Fax (954) 771-7690 Exhibit A Work Authorization No. 15414.53 Preparation of Engineering Design Survey West/North/East Country Club Drive Scope of Consulting Services between The City of Aventura, Florida a~ld Keith and Schnars, P.A. January19,1999 Exhibit A WORK AUTHORIZATION NO. 15414,53 Preparation of Engineering Design Survey West/North/East Country Club Drive SCOPE OF CONSULTING SERVICES PREAMBLE CONSULTANT proposes to provide professional services associated with preparation of a field survey and engineering evaluation and improvements for West/North/East Country Club Drive. The CONSULTANT shall prepare final construction plans for the roadway improvements based on the field data collected. 2.0 Surveying Services 2.01 En.qineerincl Desiqn Survey CONSULTANT shall conduct an engineering design survey along Country Club Drive. The length of the surveys shall extend from high point to high point to be field determined for identificstion of drainage areas affecting the specific design locations. The su~/ey shall include the locations and elevations of roadway centedines, edge of pavements, medians, swales, drainage structures, drainage high point/Iow point elevatiohs where necessary for design, and identification of possible drainage obstructions. These services include field locations of the following: · Centedine and edge of pavement of the identified road; · Driveway openings; · Signage and permanent structures within the survey area; · Swale locations and elevations where required for safety improve- ments; · Pedestrian walkway. Driveway openings will have additional elevations determined for tie-in considerations. Office services include updating the base sheets of 1" - 40' scale (or as directed by the design engineer) depicting the field locations and existing right-of-way lines and platted property, lines. All surveying services shall be performed in accordance with Rule 61 F17-6 of the Flodda Adminis- trative Code. ~i~ROJECIT WORK AUTHORIZATION PROJECT ~ ~EiTH ~d ~i~AR$:~:,~,, h PROJECT SUM~RY sHEET TASK NAME: COUNTRY CLUB DRIVE IMPROVEMENTS - DESIGN SURVEY - FIELD DEPT. CODE: 37 PAGE I OF 2 TASK -- HOURLY PROPOSAL CLASSIFIOATIOht HOURS RATE DOLLARS REi ATED Proposal Preparation ~ REIMBURSABLE EXPENSES: EST. COST PRINT NO. 02 Admin. Asst~,~ $35.00 SUBCONSULTANT A $ 04~mmunity L'iaison ~ $60.00 SUBCONSULYANT B 06 CADD Opera~or .__~5.00 SUBCONSULTANT C 07 Scientist It ~ $75.00 SUBCONSULTANT D 08 Economic/Financial Analysl __ $75.00 PERMIT FEES 39 Scientist t $60.00 TRAVEL Graphic Designer ~ $60.00 EQUIPMENT/SUPPLIES - 12 Landscape Architect (RLA) ~ $85.00 PRINTS & GRAPHICS -- ]3 _Field Representative ~ $55.00 - 14 La_nd__s~cape Desigf/er ~ $65.00 15 PI~??_~"(~ICP) ~ $75.00 A. TOTAL REIMBURSABLE EXP 17 Project Engineer/Desigl~er ~ $65.00 __ DIRECT EXPENSES: 19 Professional Engineer (P.E) ~ $85.00 SUBCONSUL~ANT B 20 Prof. Land Surveyor (PL.S ; Mapper) 10~ $75.00 $750.00 SUBCONSULTANT C - 21 Senior Project Manager ~ $120.00 SUBCONSULTANT D 22 Senior Member ~ $175.08 BLUEPRINT/REPROS -- 23 Senior Project Engineer ~ $75.08 PERMIT FEES 24 Project Manager II ~ $95.0(: MEALS 25 Technician II ~ $60.0~ EQUIPMENT/SUPPLIES 26 Project Manager III ~ $105.06 -- -- 29 Technician I 80~ $55.0( $4,400.0~ Transpodation P~anner ~ $65.0( 32 Senior Field Representalive 80~ $75.06 $4,800.00 B. TOTAL DIRECT EXPENSES 42 Survey Party 80~ $85.0¢ $6,800.00 43 Spec. Survey Party ~ Quote C. TOTAL DIRECT LABOR $16.758 00 T&M TOTAL BUDGET __ $16.750.60 (A+B+C) PREPARED BY: MO DATE: 1/6/99 TOTAL HOURS 250 ~ APPROVED BY: MO DATE: t/6/99 TOTAL DOLLARS __ . $16,750.06 ~ (Bept. Director) d4/01/96 [P~(~JECT WORK AUTHORIZATION PROJECT I KEITI~ ~nd SCHi~,~R5, P~A. - NUMBER 15414 _NUMBER 15414.53 MANAGER: Robert Kris~ JENGINEER:PLANN~RS_SURVEYORS L PROJECT SUMM}&RY sHEET TASK NAME: COUNTRY CLUB DRIVE IMPROVEMENTS - DESIGN SURVEY- OFFICE DEPT. CODE: 22 PAGE 2 OF 2 TASK ~ HOURLY PROPOSAL CLASSIFICATIOH __ HOURS~-~ RATE DOLLARS RELATED Proposal Preparation ~ REIMBURSABLE EXPENSES: EST COST PRINT NO. Admin. Assr~ $35.0( SUBOONSULTANT A $ 04 Communily Liaison ~ $60.0( SUBCONSUL~TANT B ' 06 CADD Operator $65.0( SUBCONSULTANT C Scientist Il $75.0( SUBCONSULTANT D 08 Economic/Financial Analyst ~ $75.0( PERMIT FEES -- k~ $60.0( TRAVEL 11 Graphic Designer ~ $60.0~ EQUIPMENT/SUPPLIES 12 Landscape Architect (RLA) ~ $85.00! PRINTS & GRAPHICS -- 13 Field Representative ~ $55.00 14 Landscape Deskjrler ~ $B5.00 -- 15 Planner (AiCP) ~ $75.00 A. TOTAL REIMBURSABLE EXP 18 Project Manager I ~ $85.00 SUBCONSULTANT A - 24 Project Manager II ~ $95.00 MEALS Project Manager Ill ~ $105,00 42 Survey Pady ~ $85.00 __ (A+B+C) TOTAL HOURS ~ APPROVED BY: RK DATE: 1/6/99