Loading...
99-001RESOLUTION NO. 99-01 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF AVENTURA, FLORIDA, AUTHORIZING THE CITY MANAGER TO EXECUTE THE ATTACHED AMENDMENT TO WORK AUTHORIZATION NO. 15414.39 FOR WILLIAMS ISLAND BOULEVARD CONSTRUCTION SERVICES BY AND BETWEEN THE CITY OF AVENTURA AND KEITH AND SCHNARS, P.A.; AUTHORIZING THE CITY MANAGER TO DO ALL THINGS NECESSARY TO CARRY OUT THE AIMS OF THIS RESOLUTION; AND PROVIDING AN EFFECTIVE DATE. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF AVENTURA, FLORIDA, THAT: Section 1. The City Manager is hereby authorized to execute the attached Amendment to Work Authorization No. 15414.39 ($26,768.37) for Williams Island Boulevard Construction Services by and between the City and Keith and Schnars, P.A. Section 2. The City Manager is authorized to do all things necessary to carry out the aims of this Resolution. Section 3. This Resolution shall become effective immediately upon its adoption. The foregoing Resolution was offered by Commissioner Perlow, who moved its adoption. The motion was seconded by Commissioner Cohen, and upon being put to a vote, the vote was as follows: Commissioner Arthur Berger yes Resolution No. 99-0__~ Page 2 Commissioner Jay R. Beskin Commissioner Ken Cohen Commissioner Jeffrey M. Perlow Commissioner Patricia Rogers-Libert ,/es Vice Mayor Harry Holzberg Mayor Arthur I. Snyder yes PASSED AND ADOPTED this 5th day of January, 1999. ATTEST: TERESA M. SMITH, CMC CITY CLERK APPROVED AS TO LEGAL SUFFICIENCY: WORK AUTHORIZATION NO. 15414.39 The City of Aventura has requested Work Authorization No. 15414.39, as provided for in the agreement between the City of Aventura and Keith and Schnars, P.A. and approved by the City Commission on August 20, 1996. This WoCk Authorization No. 15414.39 provides for technical services in accordance with Articles 3 end 4 of the agreemen! as fur[her detailed in the scope of services in Exhibit A. Payment for such services shall be in accordance with Article 5 o[ the agreement. Total estimated labor expenses are $129,640.00 To{al estimated reimbursables are $5,000.00 The time period for this work authorization will be: Preliminary Design Final Construction Plans Permitting Construction Phase 30 Days 30 Days 90 Days 120 Days CITY: ATTEST City Clerk Teresa M- Smith APPROVED AS TO, FOR~I / ~ City At{omey Wei~s Serota& Helfman, P.A- CITY Of AVEN, I,T-,~:~tA, FLORIDA/ through ~n~ger / BY ( '- Ci~Manager ~ / EficM Soroka ~ / day of ,19 Notice to Proceed Yes No Project Initiation Date /F2~O/~ 7 . ,-REC~MMEI~IDED tJlrough its BY "t,,--.w-~! ~k.._ Di~ctor of Community Service Rober~ M. Shermap P.02 Exhibit A Work Authorization No. 15414.39 Prepare Construction Documents for N.E. 183rd Street (Williams Island Boulevard) Scope of Consulting Services between The City of Aventura, Florida and Keith and Schnars, P.A. November 14, 1997 Exhibit A WORK AUTHORIZATION NO, 15414.39 Prepare Construction Documents for N.E. 183rd Street 0Nilliams Island Boulevard) SCOPE OF CONSULTING SERVICES PREAMBLE CONSULTANT proposes to provide engineering services associated with preparing construction documents for roadway conversion of the N.E. 183rd Street (Williams Island Boulevard) in the City of Aventura from Admiral's Port Condominum to N.E. 31 st Avenue. The proposed design will incorporate elements delineated in the Capital Improvement Program report prepared by Keith and Schnars, P.A. under Work Authorization No. 15414.00.05008. Specific elements of the design shall include, but not be limited to, the geometric design, horizontal alignment, sight distance, roadway drainage, clear zones, sidewalks, driveway modifications and signage. 1,0 Engineering Design Services The CONSULTANT shall prepare a praliminary roadway design for review by the City of Aventura and regulatory agencies. Prepare an opinion of probable cost for the proposed improvements. 1.02 Final Engineering Design The CONSULTANT shall prepare final construction documents for the following roadway improvements: Adjust pavement width as required to achieve acceptable sight and clear zone distances. 2. Curb and gutter along the edge of pavement as required. 3. Drainage collection system. Relocation of western entrance of Admiral's Port Condominium to the west to meet acceptable sight distance requirements. 5. Pedestrian sidewalks and crosswalks. 6. Pavement markings and signage. 1.03 Permitting Phase The CONSULTANT will provide technical criteria, written description and design data for use in filing the application for permits with agencies having jurisdiction to review the design of the project. Permit fees are the responsibility of the CLIENT and are not included within this agreement. Permit applications will be submitted to the following regulatory agencies: IVletropolitan Dade County Environmental Resources Management (DERM). 2. Metropolitan Dade County Public Works Department. 3. City of Aventura 1.04 Construction Phase The CONSULTANT shall provide construction observation services necessary to certify to the regulatory agencies that the construction work has been completed in substantial compliance with the approved documents and permits. Services included in this item are described as follows: Shod drawings: The CONSULTANT will review shop drawings, samples, other data and repods which the selected contractor is required to submit for review, but only for the conformance with design concept of the project and compliance with the information given on the design drawings. Such review shall not extend to means, methods, techniques, sequence or procedures of construction or to safety precautions and programs incident thereto. Site Visits: CONSULTANT shall make visits to the site at intervals appropriate to the v~ous stages of construction as CONSULTANT deems necessary in order to observe as an experienced and qualified design professional the progress and quality of the various aspects of the contractor(s)'s work. Insoections and Tests: The CONSULTANT shall observe the utility testing required in final certification to certify to the responsible utiIity entity (the actual testing will be by others). 2 Constr~ction Observation: Service shall include coordination with ~;ontractor(s) and responsible utility entity to facilitate construction of the improvements contained in the design plans including any preconstruction meetings. Inspections will be performed as required for permits, record drawings, information, and final utility certification. Final Certification: The CONSULTANT will prepare the final certification and process record drawings for the design from the survey information to be supplied by the contractor or by other means agreed to by both CONSULTANT and CLIENT and certified to the appropriate agencies. We anticipate the following items requiring as-built certification: Roadway and appurtenances Storm drainage system 1.05 Landscaping Drainage Services (See attached proposal.) 1,06 Electrical Design Services (See attached proposal.)