Loading...
98-092 RESOLUTION NO. 98-92 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF AVENTURA, FLORIDA, AUTHORIZING THE CITY MANAGER TO EXECUTE THE ATTACHED WORK AUTHORIZATION NO. 97-167-A FOR PROFESSIONAL LANDSCAPE ARCHITECT SERVICES FOR N.E. 190TM LANDSCAPING AND STREET LIGHTING BY AND BETWEEN THE CITY OF AVENTURA AND O'LEARY DESIGN ASSOCIATES, P.A. FOR THE AMOUNT OF $46,380; AND PROVIDING FOR AN EFFECTIVE DATE. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF AVENTURA, FLORIDA, THAT: Section 1. The City Manager is hereby authorized to execute the attached Work Authorization No. 97-167-A in the amount of $46,380 for professional landscape architect services by and between the City and O'Leary Design Associates, P.A. Section 2. The City Manager is authorized to do all things necessary to carry out the aims of this Resolution. Section 3. This Resolution shall become effective immediately upon its adoption. The foregoing Resolution was offered by Commissioner Beskin, who moved its adoption. The motion was seconded by Commissioner Cohen, and upon being put to a vote, the vote was as follows: Resolution No. 98-62 Page 2 Commissioner Jay R. Beskin yes Commissioner Arthur Berger yes Commissioner Ken Cohen ~,es Co,.,.~ ssion~]: Jeffrey Perlow yes Co,.,.~ ssionerPatricia Rogers-Libert absent Vice Mayor Harry Holzberg yes Mayor Arthur I. Snyder yes PASSED AND ADOPTED this 17th day of NovepRber, 1998. ARTHUR I. ~'0ER/MAYOR- ATTEST: TERESA M. SMITH, CMC CITY CLERK APPROVED AS TO LEGAL SUFFICIENCY: CITY ATTORNEY EXHIBIT 'A' WORK AUTHORIZATION NO.98-167-A N.E. 190TH STREET LANDSCAPING AND STREET LIGHTING FOR AVENTURA, FLORIDA BETWEEN THE CITY OF AVENTURA, FLORIDA AND O'LEAR¥ DESIGN ASSOCIATES, P.A. OCTOBER 22, 1998 EXHIBIT 'A' WORK AUTHORIZATION NO. 98-167-A N.E. 190TH STREET LANDSCAPING AND STREET LIGHTING FOR AVENTURA, FLORIDA SCOPE OF CONSULTING SERVICES PREAMBLE Consultant proposes to provide professional services associated with the completion of plans and contract documents for NE. 190th Street, from N.£ 29th Avenue to the eastern terminus of N.E. 190th Street, as follows; I) Landscape Architectural Services A) Contract Documents 1) Complete detailed landscape plans. 2) Complete detailed irrigation plans for the two (2) easternmost median islands and for the South side right-of-way adjacent to N.E. 29th Avenue, including retrofitting the existing irrigation system, as needed. 3) Complete plans for the south right-of-way sidewalk extension at N.E 29th Avenue. 4) Details for illuminated street signs. 5) Complete specifications suitable for bidding. B) Bidding Phase 1) Assist the City of Aventura in securing competitive bids. 2) Evaluate bids and make recommendation to City Manager C) Construction Administration Phase 1) Attend pre-construction "kick-oW' meeting. 2) Attend on-site construction meetings, as needed. 3) Review and approve contractor shop drawings. 4) Complete final inspection and final punch-list and issue 'Notice of Acceptance' to contractor. 5) Secure all warranties and operating manuals and remit tv City 6) Prepare "as-built" plans documenting deviations and or additions to contract plans II) Electrical Engineering Services (by Bailey Engineering Consultants). O'LEARY DESIGN ASSOCIATES., P.A. Landscape Architects WAGE RATE CERTIFICATION DATE: OCTOBER 22, 1998 PROJECT NUMBER: 98-167~A PROJECT: 190th STREET LANDSCAPING AND STREET LIGHTING AVENTURA, FLORIDA PROJECT MANAGER: WILLIAM A. O'LEARY TASK NAME: LANDSCAPE ARCHITECTURAL SERVICES TASK HOURLY PROPOSAL CLASSIFICATION HOURS RATE DOLLARS 1. PROJECT MANAGER 128 95 $ 12,160.00 2. LANDSCAPE ARCHITECT 184 80 $ 14,720.00 TOTAL HOURS TOTAL DOLLARS $ 26,880.00 REIMBURSABLE EXPENSES EST. COST RELATED PRINT NO. SUB-CONSULTANT 'B' SUB-CONSULTANT 'C' SUB-CONSULTANT 'D' TRAVEL PRINTS/GRAPHICS/INCIDENTALS $ 1,500.00 A. TOTAL REIMBURSABLE EXP. $ 1,500.00 DIRECT EXPENSES: SUB-CONSULTANT 'A' (ENVIRONMENTAL AUDIT) SUB-CONSULTANT 'B' ARCHITECT SUB-CONSULTANT'C' ELECTRICA $ 18,000.00 SUB-CONSULTANT 'D' GRAPHICS B. TOTAL DIRECT EXPENSES $ 18,000.00 C. TOTAL DIRECT LABOR $ 26,88000 TOTAL BUDGET $ 46,380.00 {A+B+C) PREPARED BY WAO 10/22/98 APPROVED BY: WAO 10/22/98 WORK AUTHORIZATION NO. 98-167-A The City of Aventura has requested Work Authorization No. 98-167-A, as provided for in the agreement between the City of Aventura and O'Lea;? Design Associates, P.A. and approved by the ('itv Commission on August 20, 1996. This Work Authorization No. 98-167-A provides for Landscape Architectural services in accordance with Articles 3 and 4 of the agreement as further detailed in the scope of services Exhibit A. Payment for such services shall be in accordance with Article 5 of'the agreement Total estimated labor expenses are ............ $18,00000 Total estimated direct expenses are .......... $26,880.00 Total estimated reimbursables are ............. $ 1,500.00 O'LEARY DESIGN ASSOCIATES, PA. By: William A. O'Leary, FASLA CITY: ATTEST: CITY OF AVENTURA, FLORIDA By: ~0, (Tq(~ By: (_ ~ ~ __/ City Clerk City Manager ~,~/ TERESA M. SMITH ERIC M. SOROKA '"' /q day of /{JOM.4~ ,199~ APPROVED AS TO FORM By: '0~"7~ '~v~ ~'"~"/~"-'- ~ Notice to Proceed Yes No City Attorney WEISS-SEROTA-HELFMAN Project Initiation Date RECOMMENDED through its COMMUNITY SERVICES DIRECTOR By: Community Services Director ROBERT M SHERMAN day of _, 19__ OcTober 15, 1998 Mr. Will/am O'Leary O'Leary Design Associates, P.A. Oak Plaza Center 8525 S.W. 92~ Street, Suite Miami, FL 33156 Re: Roadway Lighting on N~E 190°~ SIa'eet Aventm'a, Florida Dear Mr, O'Lea~: We are pleased to submit our proposal for electrical engineeriag ser¥Sces for the above p,-oject. Our services shall include the following: I. Completed tracings of" drawings for the work, covering all phases of our design, in accordance with a forma~ determined by you, including final project specifications. 2. Coordination with FP&L for eIec~c service requirements. 3. Final cost estimate for the work performed under this agreement. Attend meetings to answer questions relevant to our design. 4. Serv'ice~ dm'lng bidding. 5. Shop ch-awing review. 6. Site v/sits during construction, Our scope of services shall include NE 190~ street from NE 29~ Avenue and extending east approximately 0.5 miles, The length of the project w/fl revolve strictly roadway lighting fixtm'es. Our fee for this work shall be $t8,000.00, payable as follows: When Plans are 50% Complete $ 6,000.00 When Plans are 80% Complete $ 3,600.00 When Plans are 100% Complete $ 2,400.00 Item 4 Complete (Construction Pro.ess) $ 2,300.00 Item 5 Complete (Construction Progress) $ 1,800.00 Rem 6 Complete (Conslruction Progress) $ ~,900.00 Very truly yours,~-- Stophm~ E. Bailey~ P.E. ACCEPTED_ DATE F19898DO wpd