Loading...
98-107 RESOLUTION NO. 98-107 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF AVENTURA, FLORIDA, AUTHORIZING THE CITY MANAGER TO EXECUTE THE ATTACHED WORK AUTHORIZATION NO. 15414.51 FOR THE PREPARATION OF CONSTRUCTION PLANS AND DOCUMENTS FOR NE 185TM STREET AND NE 28TM COURT IMPROVEMENTS BY AND BETWEEN THE CITY OF AVENTURA AND KEITH AND SCHNARS, P.A.; AUTHORIZING THE CITY MANAGER TO DO ALL THINGS NECESSARY TO CARRY OUT THE AIMS OF THIS RESOLUTION; AND PROVIDING AN EFFECTIVE DATE. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF AVENTURA, FLORIDA, THAT: Section 1. The City Manager is hereby authorized to execute the attached Work Authorization No. 15414.51 ($122,730) for the preparation of constructions plans and documents for NE 185th Street and NE 28th Court Improvements by and between the City and Keith and Schnars, P.A. Section 2. The City Manager is authorized to do all things necessary to carry out the aims of this Resolution. Section 3. This Resolution shall become effective immediately upon its adoption. The foregoing Resolution was offered by Commissioner Rogers-Libert, who moved its adoption. The motion was seconded by Commissioner Cohen, and upon being put to a vote, the vote was as follows: Resolution No. 98- Page 2 Commissioner Arthur Berger yes Commissioner Jay R. Beskin yes Commissioner Ken Cohen yes Commissioner Jeffrey M. Perlow yes Commissioner Patricia Rogers-Libert yes Vice Mayor Harry Holzberg yes Mayor Arthur I. Snyder yes A~THUR I~"S'NY/D'ER, ~AYOR ATTEST: TERESA M. SMITH, CMC CITY CLERK APPROVED AS TO LEGAL SUFFICIENCY: CITY ATTORNEY KEITH and SCHNARS, P.A. E N G I N E E R S., P L A N N E R S ,* S O RV E Y O R S WORK AUTHORIZATION NO. 15414.51 The City of Aventura has requested Work Authorization No. t5414.51, as provided for in the agreement between the City of Aventura and Keith and Schnars, P.A. and approved by the City Commission on August 20, 1996. This Work Authorization No. 15414.51 provides for technical sen,ices in accordance with Articles 3 and 4 of the agreement as further detailed in the scope of services in Exhibit A. Payment for such services shall be in accordance with A~icle 5 of the agreement. Estimated Labor Expenses Reimbursables Engineering Design Services $30,400.00 $1,000.00 Permitting Services $4,320.00 $500.00 Engineering Design Survey Update $2,060.00 Horizontal Control Plans $1,500.00 Bidding Services $4,160.00 Construction Sen,ices $18,070.00 $1,000.00 Subconsultant Services Landscaping Design Services $2I ,000.00 $1,200.00 Landscaping Bid Services $1,500.00 Landscaping Construction Services $7,500.00 Electrical Design Services $12,000.00 Electrical Construction Services $7,600.00 Subsurface Utility Location Services$3,600.00 10% Project Management (K&S) $5,320.00 Total Estimated Labor Expenses are $I 19,030.00 Total Estimated Reimbursables $3,700.00 The time period for this work authorization wi!! be: Preliminary Design 30 Days Final Construction Plans 30 Days Permitting Phase 90 Days Construction Phase 1~;) Days 6500 North Andrews Avenue · Ft. Lauderdale, Florida 33309-2132 (954) 776-1616 ° (800) 488-1255 · Fax (954) 771-7690 CITY: ATTEST CITY OF A~.F.~TURA, FLOR)DA ~ throug~t,t,~City Manager / ~~ BY/'_ ~ BY Ci'ty Clerk ' - ~-City Manage~ / Teresa M. Smith Eric M. Soroka ',,4 __ day of _,1998 APPROVED AS T,O FOF~M , ~-, BY¢~ ///' ' - ~/-~-'~t'~~~' NoticetoProceed Yes No City Attorney Weiss Serota & Helfman, P.A. Project Initiation Date RECOMMENDED through its ClP Project Manager BY Capital Project Manager Antonio F. Tomei day of __ _, 1998 Exhibit A Work Authorization No. 15414.51 Preparation of Final Construction Documents for Roadway Improvements N.E. 185th Street and NE. 28th Court Scope of Consulting Services between The City of Aventura, Florida and Keith and Schnars, P.A. November 10, 1998 Exhibit A WORK AUTHORIZATION NO. 15414.51 Preparation of Final Construction Documents for Roadway Improvements N.E. 185th Street and N.E. 28th Court SCOPE OF CONSULTING SERVICES PREAMBLE CONSULTANT proposes to provide professional services associated with the preparation of construction documents for roadway reconstruction of N.E. 185th Street and N.E. 28th Court in the City of Aventura. The proposed design will incorporate elements delineated in the Capi;.al Improvement Program report prepared by Keith and Schnars, P.A. under Work Authorization No. 15414.00.05008. Specific elements of the design shall include, but not be limited to, the geometric design, horizontal alignment, sight distance, roadway drainage, clear zones, sidewalks, driveway modifications and signage. 1.0 Engineering Design Services 1.01 Preliminary Desiqn The CONSULTANT shall prepare a preliminary roadway design for review by the City of Aventura and regulatory agencies. Prepare an opinion of probable cost for the proposed improvements. 1.02 Final Engineerinq Desiqn The CONSULTANT shall prepare final construction documents for the following roadway improvements: 1. Adjust pavement width as required to achieve acceptable sight and clear zone distances. 2. Curb and gutter along the edge of pavement as required. 3. Drainage collection system. 4. Pedestrian sidewalks and crosswalks. 5. Pavement marking and signage. The final construction documents shall include the following: · Project manual including the contract documents and specifications. · Construction plans at 1" = 20' scale as follows: Title Sheet & Location Map 1 Sheet Engineering Design Survey 5 Sheets Demolition Plans 5 Sheets Paving, Grading and Drainage Plans 5 Sheets Including Profiles Paving, Marking and Signing Plans 5 Sheets Construction Details Including 2 Sheets Typical Cross-Sections Geometric Control Plans (Optional) 5 Sheets 1.03 Permittinq Phase The CONSULTANT shall provide technical criteria, written description and design data for use in filing the application for permits with agencies having jurisdiction to review the design of the project. Permit fees are the responsi- bility of the CLIENT and are not included within this agreement. Permit applications will be submitted to the following regulatory agencies: 1. Metropolitan Bade County Environmental Resources Management (BERM). 2. Metropolitan Dade County Public Works Department (Traffic Engineering only). 3. City of Aventura 1.04 Meetinqs The CONSULTANT shall attend three (3) hour meetings for a period of twelve (12) weeks required to review the work tasks associated with this proposal. At the request of the CLIENT, the CONSULTANT will attend any additional meetings that will be billed on an hourly basis in accordance with our hourly rate schedule attached for CLIENT's review. 2.0 Surveying Services 2.01 En.qineerinq Desiqn Survey Update CONSULTANT shall update the engineering design survey prepared December 2, 1996. The survey shall extend along the identified roads and intersections. The surveys shall include the locations and elevations of all roadway centerlines, edge of pavement, medians, swales, drainage structures, drainage high points/Iow point elevations and identification of possible drainage obstructions. The services entail field locations of the following: · Centerline and edge of pavement of the identified road; · Driveway openings; · Signage and permanent structures within the survey area; · Swale locations and elevations; · Drainage structure locations and inverts. Driveway openings will have additional elevations determined for tie-in considerations. Office services include updating the base sheets depicting the field locations and existing right-of-way lines and platted property lines. All surveying services shall be performed in accordance with Rule 61 F17-6 of the Florida Administrative Code. 1.02 Horizontal Control Plans CONSULTANT shall prepare horizontal control plans depicting the location of the proposed roadway features to be used by the contractor for field layout. 3.0 Bidding or Negotiating Services The CONSULTANT, following the City's approval of the Construction documents ("Construction documents" shall mean the entire contract for construction, including all addendums or alterations thereto, drawings and technical specifications) and of the latest Statement of Probable Construction Cost, shall assist the City in obtaining, evaluating, awarding and preparing construction contracts. The CONSULTANT will prepare bid packages and release them to contractors and assist in the selection of a contractor. Services include but are not limited to, a review of contract proposals, review of contractor's submitted credentials, subcontractor's submitted credentials, to assist the City in their selection of a contractor. 4.0 Construction Services The CONSULTANT shall provide construction observation services necessary to certify to the regulatory agencies that the construction work has been completed in substantial compliance with the approved documents and permits. Services included in this item are described as follows: a. Shop drawinqs: The CONSULTANT will review shop drawings, samples, other data and reports which the selected contractor is required to submit for review, but only for the conformance with design concept of the project and compliance with the information given on the design drawings. Such review shall not extend to means, methods, techniques, sequence or procedures of construction or to safety precautions and programs incident thereto. b. Site Visits: CONSULTANT shall make visits to the site at intervals appropriate to the various stages of construction as CONSULTANT deems necessary in order to observe as an experienced and qualified design professional the progress and quality of the various aspects of the contrac- tor(s)'s work. c. Inspections and Tests: The CONSULTANT shall observe the utility testing required in final certification to certify to the responsible utility entity (the actual testing will be by others). d. Construction Observation: Service shall include coordination with contrac- tor(s) and responsible utility entity to facilitate construction of the improve- ments contained in the design plans including any preconstruction meetings. Inspections will be performed as required for permits, record drawings, information, and final utility certification. e. Final Certification: The CONSULTANT will prepare the final certification and process record drawings for the design from the survey information to be supplied by the contractor or by other means agreed to by both CONSUL- TANT and CLIENT and certified to the appropriate agencies. We anticipate the following items requiring as-built certification: · Roadway and appurtenances; · Storm drainage system. 5.0 Landscaping Design Services (See attached proposal.) 6.0 Electrical Design Services (See attached proposal.) 7.0 Subsurface Utility Location Services (See attached proposal.) PROJECT WORK AUTHORIZATION PROJECT NUMBER 15414 NUMBER 15414.51 MANAGER: Wilson TASK NAME: N.E. 185TH STREET & N.E. 28TH COURT FINAL ENG. DSIGN DEPT. CODE: 05 PAGE 1 OF 6 PROPOSAL [ ] CLASSIFICATION DOLLARS RELATED Proposal Preparation REIMBURSABLE EXPENSES: EST. COST PRINT NO. 02 Admin. Asst. $420.00 SUBCONSULTANT A $ 04 Community Liaison SUBCONSULTANT B 06 CADD Operator SUBCONSULTANT C 37 Scientist II SUBCONSULTANT D 38 Economic/Financial Analyst PERMIT FEES 39 Scientist I TRAVEL 11 Gr hic Deal her EQUIPMENT/SUPPLIES 12 Landscape Architect (RLA) PRINTS & GRAPHICS $1,000.00 13 Fiald Representative 14 Landscape Designer 15 Planner (AICP) A. TOTAL REIMBURSABLE EXP $1,000.00 16 Associate Planner 17 Project Engineer/Designer $15,600.00 DIRECT EXPENSES; 18 Project Manager I $8,500.00 SUBCONSULTANT A 19 Professional Engineer(P.E.) SUBCONSULTANT B 20 Prof. Land Surveyor (P.L.S. & M pap~) SUBCONSULTANT C 21 Senior Project Manager $2,880.00 SUBCONSULTANT D 22 Senior Member BLUEPRINT/REPROS 23 Senior Project Engineer $3,000.00 PERMIT FEES 24 Project Manager II MEALS 25 Technician II EQUIPMENT/SUPPLIES 26 Project Manager III 29 Technician I 30 Transportation Planner 32 Senior Field Representative B. TOTAL DIRECT EXPENSES 43 S .Surve Pa C. TOTAL DIRECT LABOR $30,400.00 T&M TOTAL BUDGET $31,400.00 -- (A+B+C)  PREPARED BY: WS DATE: 11/10/98 TOTAL HOURS~$30,400.0£ APPROVED BY: PRG DATE: 11/10/98 [TOTAL DOLLARS (Dept. Director) 04/01/96 PROJECT WORK AUTHORIZATION PROJECT ~ NUMBER 15414 NUMBER 15414.51 MANAGER: Wilsc,1 Sanchez ~~ TASK NAME: N.E. 185TH STREET & N.E. 28TH COURT PERMITTING DEPT. CODE: 05 PAGE 2 OF 6 PROPOSAL [ ] DOLLARS RELATED ~ -- -- REIMBURSABLE EXPENSES: EST, COST PRINT NO, $280.00 SUBCONSULTANT A $ SUBCONSULTANT B SUBCONSULTANT C SUBCONSULTANT D PERMIT FEES TRAVEL EQUIPMENT/SUPPLIES PRINTS & GRAPHICS $500.00 A. TOTAL REIMBURSABLE EXP $500.00 $3,120.00 DIRECT EXPENSES: $680.0(3 SUBCONSULTANT A SUBCONSULTANT B SUBCONSULTANT C $240.0~_ SUBCONSULTANT D BLUEPRINT/REPROS PERMIT FEES MEALS EQUIPMENT/SUPPLIES B. TOTAL DIRECT EXPENSES 43 S ec. Surve Pa~y ~ Quote C~ TOTAL DIRECT LABOR $4,320.00 T&M TOTAL BUDGET $4,820.00 (A+B+C) PREPARED BY: WS DATE: 11/10/98 ~ ~J ~ APPROVED BY: PRG DATE: 11/10/98 ~~ (Dept. Director) 04/01/96 IPROJECT WORK AUTHORIZATION PROJECT ~ ~ LNUMBER 15414 NUMBER 15414.51 MANAGER: Wilson Sanchez I~ TASK NAME: N.E. 185TH STREET & N.E. 28TH COURT ENG. DESIGN SURVEY- FIELD DEPT. CODE: 37 PAGE 3 OF 6 TASK / HOURLY PROPOSAL L j CLASSIFICATION HOURS ~ RATE DOLLARS RELATED preposai Preparation~ REIMBURSABLE EXPENSES: EST. COST PRINT NO. 02 Admin. Asst. __ ~ $35.00 SUBCONSULTANT A $ 04 Community Liaison __ ~. ~ SUBCONSULTANT B 06 CADD Operator __ ~ ~ SUBCONSULTANT C 07 Scientist [I __ ~ $75.00 SUBCONSULTANT D 08 Economic/Financial AnaJyst __ ~ ~ PERMIT FEES 09 Scientist I __ ~ ~ TRAVEL ~Deslgner -- ~ ~ EQUIPMENT/SUPPLIES 12 Landscape Architect (RLA) ~ ~ PRINTS & GRAPHICS 13 Field Representative __ ~ ~ 14 Landscape Designer __ ~ ~ 15 Planner (AICP) __ ~ ~ A. TOTAL REIMBURSABLE EXP 16 Associate Planner __ ~ ~ 17 Project Engineer/Designer __ ~ ~ DIRECT EXPENSES: ~ect Manager I __ ~ ~ SUBCONSULTANT A 197ofessionaJ Engineer (P.E.) __ ~ ~ SUBCONSULTANT B 120 Prof. Land Surveyor (P.LS. & Mapper) 4~1~ --~ $300.00 SUBCONSULTANT C 21 San or Project Manager -- [iJ[,aamm,m $120.00 SUBCONSULTANT D 22 Senior M~mber ~ $175.00 BLUEPRINT/REPROS 23 Senior project Eng. ineer _ ~ ~75.00 PERMIT FEES 24 Pro~e~t Manager [I _ ~ ~ MEALS 2.5 Technician Il *-- ~ ~ $480.00 EQUIPMENT/SUPPLIES 26 project Manager I~I _ ~ ~ 29 Tanhnician, _ ~ ~ 30 Transpodation Planner _ ~ 32 Senior Field Representative ~ $75.00 $600.00 B. TOTAL D!RECT EXPENSES 43 S~_rt~ -- I Quote C. TOTAL DIRECT LABOR $2,060.00 T&M 1' t I- TOTAL BUDGET $2,060.00 (A+B+C) _ _~ PREPARED BY: WS DATE: 11/10/98 TOTALHOUR~- ..... 25! i~~ APPROVED BY: PRG DATE: 11/10/98 ~- .~~ $2.060.~3 (Dept. Director) 04/01/96 fPROJECT WORK AUTHORIZATION PROJECT [ ~i'i~,~ ~ LNUMBER 15414 NUMBER 15414,51 MANAGER: Wilson Sanchez [~l~ ~/:~~~ TASK NAME: N.E. 185TH STREET & N,E. 28TH COURT ENG. DESIGN SURVEY- OFFICE DEPT. CODE: 22 PAGE 4 OF TASK HOURLY PROPOSAL I CLASSIFICATION HOURS RATE DOLLARS RELATED Proposa~ Preparation REIMBURSABLE EXPENSES: EST. COST PRINT NO. 02 Admin. Asst. $35.00 SUBCONSULTANT A $ 04 Community Liaison $60,00 SUSCONSULTANT B 06 CADD Operator $65,00 SUBCONSULTANT C 07 Scientist il $75.00 SUBCONSULTANT D 08 Economic,/FinanciaJ Analyst $75.00 PERMIT FEES 09 Scientist I $60.00 TRAVEL ~hic Designer $60.00 EQUIPMENT/SUPPLIES 12 Landscape Architect (RLA) $85.00 PRINTS & GRAPHICS 13 Field Representative $55.00 14 Landscape Designer $65.00 15 Planner (AICP) $75.00 A. TOTAL :3EIMBURSABLE EXP ~16 Associate Planner $60.00 17 Project Engineer/D_esigner DIRECT EXPENSES: 18 Pro~ect Manager I SURCONSULTANT A 19 Professio~aJ Engineer (P.E.) SUBCONSULTANT B 20 Prof. Land Surveyor (P.L.S. & Mapper) $300.00 SUBCONSULTANT C 21 Senior Project Manager SUBCONSULTANT D 22 Senior Member BLUEPRiNT/REPROS 23 Senior Project Engineer PERMIT FEES 24 Project Manager II MEALS 25 Technician II $1,200.00 EQUIPMENT/SUPPLIES 26 Project Manager III 29 Technician I ..... 30 Transportation Planner 32 Senior Field Representative __ B. TOTAL DIRECT EXPENSES 42 Surve Part 43 S ec. Surve Pa __ C. TOTAL DIRECT LABCR $1,500.00 T&M TOTAL BUDGET $1,500.00 (A+B+C) PREPARED BY: WS DATE: 11/10/98 TOTAL HOURS ~ APPROVED BY: PRG DATE: 11/10/98 TOTAL DOLLARS$1,500.00 (Dept. Director) PROJECT WORK AUTHORIZATION PROJECT NUMBER 15414 NUMBER 15414.51 MANAGER: Wilson Sanch6z TASK NAME: N.E. 185TH STREET & N,E, 28TH COURT - CONSTRUCTION PHASE DEPT. CODE: 05 PAGE 5 OF 6 TASK / HOURLY PROPOSAL [ CLASSIFICATION HOURSB RATE DOLLARS RELATED Prep<~al Preparation REIMBURSABLE EXPENSES: EST. COST PRINT NO. 02 Admin. Asst. $35.0~ SUBCONSULTANT A $ 04 Community Liaison $60.0(2 SUBCONSULTANT B 06 CADD Operator ~ $65.0~ SUBCONSULTANT C 07 Scientist II/ $75.0( SUBCONSULTANT D 08 Economic/Financial Analyst $75.06 PERMIT FEES 09 Scientist I $60.06 TRAVEL It Gr hic Desi ner $60.0( EQUIPMENT/SUPPLIES 12 Landscape Architect (RLA) $85.0( PRINTS & GRAPHICS $~ ,000.00 13 Field Representative $55.0{; 14 Landscape Designer $65.0( 15 Planner (AICP)~ $75.0( A. TOTAL REIMBURSABLE EXP $1,000.00 16 Associate Planner ~. $60.0( 17 Project Engineer/Designer/ $65.0( DIRECT EXPENSES: 18 Project Manager I $85.0( SUBCONSULTANT A 19 Professional Engineer (P.E.) 52 $85.0(: $4,420.0( SUBCONSULTANT B 20 Prof. Land Surveyor (P.L.S. & Mapper) $75.0( SUBCONSULTANT C Iii Senior Project Manage, __ ^ --$120'0( SUBCONSULTANT D Secior Member ~75.0( BLUEPRINT/REPROS Senior Project Engineer~ ~$75.0( $1,950.0~ PERMIT FEES 24 Project Manager II ~ ~ MEALS 25 Technician II~ ~ ~ EQUIPMENT/SUPPLIES 26 Project Manager lll ~ ~ 29 Technicianl ~. ~ 30 Transportation Planner ~ ~ ............. 32 Senior Field Rapresentati',.~ 156~L $75.0(: $11,700.0~ B. TOTAL DIRECT EXPENSES 42 Sun/e, P -- ~. $85.0( 43 S ec. Surve Pa J~ Quote C. TOTAL DIRECT LABOR $18,070.00 T&M __~ TOTAL BUDG ET $19,070.00 {A+B+C) ___ PREPARED BY: WS DATE: 11/10/98 'TOTALHOURS 234 I ~I APPROVEDBY: PRG DATE: 11/10/98 ~RS __l~ .......... {Dept. Director) 04/01/90 PROJECT WORK AUTHORIZATION PROJECT NUMBER 15414 NUMBER 15414.51 MANAGER: Wilsan Sanchez TASK NAME: N.E. 185TH STREET & NE. 28TH COURT - BIDDING SERVICES DEPT. CODE: 05 PAGE 6 OF TASK HOURLY PROPOSAL CLASSIFICATION HOURS RATE DOLLARS RELATED Proposal Preparatien REIMBURSABLE EXPENSES: EST. COST PRINT NO. 02 Admin. Asst. $35.00 SUBCONSULTANT A $ 04 Community Liaison $60.00 SUBCONSULTANT B 06 CADD Operator $65.00 SUBCONSULTANT C 07 Scientist ii $75.00 SUBCONSULTANT D 08 Ecanomic/Financiel AnaJyst $75.00 PERMIT FEES 09 Scientist I $60.00 TRAVEL ~eslgner $~1~ EQUIPMENT/SUPPLIES 12 Landscape Architect (RLA) $85.00 PRINTS & GRAPHICS 13 Field Representative $55.00 14 Landscape Designer $65.00 15 Planner (AICP) $75.00 A. TOTAL REIMBURSABLE EXP 16 Associate Planner $60.00 1~7. Project Engineer/Designer $65.00 DIRECT EXPENSES: ~enager I $85.00 SUBCONSULTANT A 19 Professional Engineer (P.E.) $85.00 $680.00 SUSCONSULYANT B 20 Prof. Land Surveyor (P.L.S. & Mapper) $75.00 SUBCONSULTANT C 21 Senior Project Manager $120.00 $480.00 SUBCONSULTANT D 22 Senior Member $175.00 BLUEPRINT/REPROS 23 Senior p~neer $75.00 $3,000.00 PERMIT FEES 24 Project Manager II $95.00 MEALS 25 Technician II $60.00 EQUIPMENT/SUPPLIES 26 Project Manager Ill $105.00 29 Technician I $55.00 30 Transportation Planner $65.00 32 Senior Field Representative $75.00 B. TOTAL DIRECT EXPENSES 42 Surve P 43 Sec, Surge part Quote C. TOTAL DIRECT LABOR $4,160.00 T&M TOTAL BUDG ET $4,160.00 (A+B+C) PREPARED BY: WS DATE: 11/10/98 TOTAL HOURS APPROVED BY: PRG DATE: 11/10/98 TOTAL DOLLARS $4,160.00 (Dept. Director) 04/01/96