Loading...
97-081 RESOLUTION NO. 97-81 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF AVENTURA, FLORIDA, AUTHORIZING THE CITY MANAGER TO EXECUTE THE ATTACHED WORK AUTHORIZATION NO. 15414.39 TO PREPARE CONSTRUCTION DOCUMENTS FOR NE 183RD STREET FOR PROFESSIONAL SERVICES BY AND BETWEEN THE CITY OF AVENTURA AND KEITH AND SCHNARS, P.A.; AND PROVIDING AN EFFECTIVE DATE. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF AVENTURA, FLORIDA, THAT: Section 1. The City Manager is hereby authorized to execute the attached Work Authorization No. 15414.39 ($134,640) for the preparation of construction documents for NE 183fd Street in accordance with the Capital Improvements Program for professional services by and between the City and Keith and Schnars, P.A. Section 2. The City Manager is authorized to do all things necessary to carry out the aims of this Resolution. Section 3. This Resolution shall become effective immediately upon its adoption. The foregoing Resolution was offered by Councilmember Rogers-Libert, who moved its adoption. The motion was seconded by Councilmember Berger, and upon being put to a vote, the vote was as follows: Councilmember Arthur Berger yes Councilmember Ken Cohen yes Resolution No. 97-81 Page 2 Councilmember Harry Holzberg yes Councilmember Jeffrey M. Perlow yes Councilmember Patricia Rogers-Libert :yes Vice Mayor Jay R. Beskin ~,es Mayor Arthur I. Snyder ,,es PASSED AND ADOPTED this 18th day of N~ooverr~er~199f. ATTEST: TERESA M. SMITH, CMC CITY CLERK APPROVED AS TO LEGAL SUFFICIENCY: EMS/tms 7 02: ~-P P. 02 .,.~-----"'~ WORK AUTHORIZATION NO. 15414.39 The City of Aventura has requested Work Authorization No. 15414,39, as provided for in the agreement between the City of Aventura and Keith and Schnars, P.A. and approved by the City Commission on August 20, 1996. This Work Authorization No. 15414.39 provides for technical services in accordance with Articles 3 and 4 of the agreement as further detailed in the scope of services Exhibit A, Payment for such services shall be in accordance with Article 5 of the agreement. Total sstimated labor expenses are $129,640.00 Total estimated reimbursables are $5,000.00 The time period for this work authorization will be: Preliminary Design 30 Days Final Construction Plans 30 Days Permitting 90 Days Construction Phase 120 Days CITY: ATTEST CITY OF AVEN. I.T. tdR. A, FLORIDA/ City Clerk Teres~ M- Smith Eric M. Soroka day of ,19 APPROVED AS TO, FOR~I BY ~/~'~ ~ Notice to Proceed Yes No City Attorney Weiss Serota & Helfman, p.A. Project Initiation Date ///:2a/~ ~Pc~=,O.M~E~DED through its I~i~::tor of Community Service Robe~ M. Sherman Exhibit A Work Authorization No. 15414.39 Prepare Construction Documents for N.E. 183rd Street (Williams Island Boulevard) Scope of Consulting Services between The City of Aventura, Florida and Keith and Schnars, P.A. November 14, 1997 Exhibit A WORK AUTHORIZATION NO. 15414.39 Prepare Construction Documents for N.£. 183rd Street (Williams Island Boulevard) SCOPE OF CONSULTING SERVICES PREAMBLE CONSULTANT proposes to provide engineering services associated with preparing construction documents for roadway conversion of the N.E. 183rd Street (Williams Island Boulevard) in the City of Aventura from Admiral's Pod Condominum to N.E. 31st Avenue. The proposed design will incorporate elements delineated in the Capital Improvement Program report prepared by Keith and Schnars, P.A. under Work Authorization No. 15414.00.05008. Specific elements of the design shall include, but not be limited to, the geometric design, horizontal alignment, sight distance, roadway drainage, clear zones, sidewalks, driveway modifications and signage. 1.0 Engineering Design Services The CONSULTANT shall prepare a preliminary roadway design for review by the City of Aventura and regulato~ agencies. Prepare an opinion of probable cost for the proposed improvements. 1,02 Final Engineering Design The CONSULTANT shall prepare final construction documents for the following roadway improvements: 1. Adjust pavement width ss required to schieve acceptable sight and clear zone distances. 2. Curb and gutter along the edge of pavement as required. 3. Drainage collection system. 4. Relocation of western entrance of Admiral's Port Condominium to the west to meet acceptable sight distance requirements. 5. Pedestrian sidewalks and crosswalks. _ 1 6. Pavement markings and signage. 1.03 Permitting Phase The CONSULTANT witl provide technical criteria, wdtten description and design data for use in filing the application for permits with agencies having jurisdiction to review the design of the project. Permit fees are the responsibility of the CLIENT and are not included within this agreement. Permit applications will be submitted to the following regulatory agencies: 1. Metropolitan Dade County Environmental Resources Management (DERM). 2. Metropolitan Dade County Public Works Department. 3. City of Aventura 1.04 Construction Phase The CONSULTANT shall provide construction observation services necessary to certify to the regulatory agencies that the construction work has been completed in substantial compliance with the approved documents and permits. Services included in this item are described as follows: a. Shop drawings: The CONSULTANT will review shop drawings, samples, other data and reports which the selected contractor is required to submit for review, but only for the conformance with design concept of the project and compliance with the information given on the design drawings. Such review shall not extend to means, methods, techniques, sc~uence or procedures of construction or to safety precautions and programs incident thereto. b. Site Visits: CONSULTANT shall make visits to the site at intervals appropriate to the va~ous stages of construction as CONSULTANT deems necessary in order to observe as an experienced and qualified design professional the progress and quality of the various aspects of the contractor(s)'s work. c. Inspections and Tests: The CONSULTANT shall observe the utility testing required in final certification to certify to the responsible utility entity (the actual testing will be by others). 2 d. Construction Observation: Service shall include coordination with ~ontractor(s) and responsible utility entity to facilitate construction of the improvements contained in the design plans including any preconstruction meetings. Inspections will be performed as required for permits, record drawings, information, and final utility certification. e. Final Certification: The CONSULTANT will prepare the final certification and process record drawings for the design from the survey information to be supplied by the contractor or by other means agreed to by both CONSULTANT and CLIENT and certified to the appropriate agencies. We anticipate the following items requiring as-built certification: · Roadway and appurtenances · Storm drainage system 1.05 Landscaping Drainage Services (See attached proposal.) 1.06 Electrical Design Service.~ (See attached proposal.) 3