2001-023RESOLUTION NO. 2001-23
A RESOLUTION OF THE CITY COMMISSION OF THE
CITY OF AVENTURA, FLORIDA APPROVING AND
AUTHORIZING THE CITY MANAGER TO EXECUTE AND
OTHERWISE ENTER INTO THE ATFACHED CHANGE
ORDER FOR THE AVENTURA GOVERNMENT CENTER,
BY AND BETWEEN THE CITY AND JAMES A.
CUMMINGS, INC; AUTHORIZING THE CITY MANAGER
TO DO ALL THINGS NECESSARY TO CARRY OUT THE
AIMS OF THIS RESOLUTION; AND PROVIDING AN
EFFECTIVE DATE.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF AVENTURA, FLORIDA, THAT:
Section 1. The City Manager is hereby authorized to execute and otherwise
enter into Change Order dated April 3, 2001 for the Aventura Government Center, by
and between the City and James A. Cummings, Inc., attached hereto and incorporated
herein as specifically as if set forth at length herein. Said Change Order amount is
$634,743.00
Section 2. The City Manager is hereby authorized to do all things necessary to
carry out the aims of this Resolution.
Section 3. This Resolution shall become effective immediately upon its
adoption.
The foregoing Resolution was offered by Commissioner Rogers-Libert, who
moved its adoption. The motion was seconded by Vice Mayor Cohen, and upon being
put to a vote, the vote was as follows:
Commissioner Arthur Berger
Commissioner Jay R. Beskin
Commissioner Ken Cohen
Commissioner Manny Grossman
Commissioner Harry Holzberg
Commissioner Patricia Rogers-Libert
Mayor Jeffrey M. Periow
yes
yes
yes
yes
yes
yes
yes
Resolution No. 2001- 23
Page 2
PASSED AND ADOPTED this 3rd day of April, 2001.
,d'~FISREy M. P~'RLOW, ~
ATTE,~,T: /~
'~SA M. ~SORqKA, C}('IC
C._.,R'Y CUE R K',,..~J /
APPROVED AS TO LEGAL SUFFICIENCY:
CITY ATTORNEY
Government Center Project Change Order
April 3, 2001
Drainage System Revisions
Off-site drainage system outfall to lake $ 288,663
Revise site lighting due to drainage conflicts 8,726
On-site drainage system revisions 47~713
Subtotal
Test and Balance HVAC System
20,031
Subtotal
Landscape Enhancements
Upgrade 27 Royal Palm Trees to Florida
Fancy Royal Palms as recommended by
City's Landscape Architect.
Subtotal
70,687
Fire Department Perrnit Requirarnents Revise Fire Alarm system
Permit fees Plans review
Revise circuit lighting in stairwells
Provide battery backup detector in fire pump
room
Relocate smoke detector and provide
additional detector in in storage room 121
Replace smoke detector in satlyport room
159 with a heat detector
Add fire alarm and generator annunciator
panel and Generator remote emergency
stop pull station in room 321
Add fire alarm adaptor for interface with
elect]'ic locks in police station
Relocate audio visual alarm devise at
exterior plaza and provide additional audio
visual fire alarm devise at breezeway
Provide 120 voit power to new flowbeli and
provide 6" flow bell
Aaa waterproot Ilgt~t t~xtures at generator
building and bike storage room
86,011
1,186
15,335
1,367
1,672
952
25,320
1,476
1,445
3,178
2,602
Subtotal
Electric Design Upgrade
Revise power to elevators and power for fire
pump controller
58,379
Subtotal
Total change to GMP
345,102
20,031
70,687
140,544
58,379
$ 634,743