Loading...
2001-072RESOLUTION NO. 2001-72 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF AVENTURA, FLORIDA, AUTHORIZING THE CITY MANAGER TO EXECUTE THE A3-FACHED WORK AUTHORIZATION NO. 01-0103-009 FOR PROFESSIONAL DESIGN SERVICES FOR THE BISCAYNE LAKE GARDENS AREA DRAINAGE IMPROVEMENTS PROJECT BY AND BETWEEN THE CITY OF AVENTURA AND CRAVEN THOMPSON AND ASSOCIATES, INC.; AUTHORIZING THE CITY MANAGER TO DO ALL THINGS NECESSARY TO CARRY OUT THE AIMS OF THIS RESOLUTION; AND PROVIDING AN EFFECTIVE DATE. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF AVENTURA, FLORIDA, THAT: Section 1. The City Manager is hereby authorized to execute the attached Work Authorization No. 01-0103-009 ($65,000.00) for professional design services by and between the City and Craven Thompson and Associates, Inc. Section 2. The City Manager is authorized to do all things necessary to carry out the aims of this Resolution. Section3. This Resolution shall become effective immediately upon its adoption. The foregoing Resolution was offered by Vice Mayor Rogers-Libert, who moved its adoption. The motion was seconded by Commissioner Holzberg and upon being put to a vote, the vote was as follows: Commissioner Arthur Berger Commissioner Jay R. Beskin Commissioner Ken Cohen Commissioner Manny Grossman Commissioner Harry Holzberg Vice Mayor Patricia Rogers-Libert Mayor Jeffrey M. Perlow yes yes yes yes yes yes yes Resolution No. 2001.72 Page 2 PASSED AND ADOPTED this 6th day of November, 2001. J3LV'I~I~7 M~ PE-RLOW, MAYOR ATTEST: APPROVED AS TO LEGAL SUFFICIENCY: CITY ATTORNEY WORK AUTHORIZATION NO. 01-0103-009 The City of Aventura has requested Work Authorization No. 01-0103-009 as provided for in the Agreement between the City of Aventura and Craven Thompson and Associates, Inc. and approved by the City Commission on July 3, 2001. This Work Authorization No 01-0103-009 provides for technical services in accordance with Articles 3, 4, 6, 7 and 8 of the Agreement as further detailed in the scope of services in Exhibit A. Payment for such services shall be in accordance with Article 5 of the Agreement. Design Phase Survey .............................................................................................................. $16,500.00 Prepare Design Drawings .................................................................................. $17,000.00 Miscellaneous Coordination / Utility Locations .................................................. $4,500.00 Project Management ........................................................................................... $5,000.00 Total Design Phase 1 ....................................................................................... $43,000.00 Permitting Phase Prepare and Process Permits ............................................................................... $7,500.00 Miscellaneous Coordination ............................................................................... $2,000.00 Total Permitting Phase ..................................................................................... $9,500.00 Construction Phase Site Visits ............................................................................................................ $5,000.00 Shop Drawing Review .......................................................................................... $1,500.00 Project Closeout Documentation .......................................................................... $1,500.00 Total Construction Phase ................................................................................... $8,000.00 Reimbursable Expenses Printing, Graphics, Corranunications ...................... : ............................................. $2,000.00 Geotechnical ........................................................................................................ $1,500.00 Couriers, Express Mail, Etc .................................................................................. $1,000.00 Total Reimbursable Expenses ............................................................................ $4,500.00 Total Estimated Labor Expenses are ................................................................... $60,500.00 Total Estimated Reimbursable Expenses are ......................................................... $4,500.00 The time period for this work authorization will be: Design Phase ............................................................ 90 Days Permitting Phase .................................................... 120 Days Construction Services Phase (estimate) ..................... 80 Days EXHIBIT "A' Consultant shall prepare civil drawings for the City for the construction of improvements to the drainage facilities in the Biscayne Lake Gardens residential neighborhood. This estimate is based on the improvements as suggested by the City's previous engineering consultant to the NE 203"~ street, NE 27th Court, NE 201" Terrace, and NE 29th Court drainage systems surrounding the Biscayne Lake Gardens neighborhood. Consultant will more specifically perform the following: · Prepare a topographic survey of the roadways, as listed above, where drainage improvements are proposed. · Prepare design drawings for the installation of proposed drainage improvements as determined by Craven Thompson & Associates under Work Authorization No. 0 l-103-004. · Prepare and submit construction permit applications to the South Florida Water Management District and Miami-Dade Department of Environmental Resource Management, including all maps and associated drawings. · Process permit applications through agencies, including preparation of water quality design. · Miscellaneous coordination with agencies, franchise utilities, and/or City. · Construction inspection to assure conformance with specificatinns and drawings. ATTEST /~, APPKOVED AS TO FORM . BY City Attorney Weiss Serota& Helfman, P.A. CITY: Eric M. Soroka X] __ day of ,2001 Notice to Proceed Yes Project Initiation Date No RECOMMENDED through its Capital Projects Manager Capital Projects Manager Antonio F. Tomei 2g dayof t~, ,2001