Loading...
12-10-1998 CC Workshop Agenda City of Aventura City Commission Workshop Meeting December 10, 1998 9:00 A. M. Executive Conference Room 2. 3. 4. 5. Agenda Government Center Project Tri-City Library Update Lighted Fountain Project (Mayor Snyder) Founders Recognition Dinner Update Aventura Blvd Lighting & Entrance Features (Commissioner Perlow) Other Business Next Workshop - January 19, 1999 -9:00 A.M. Miami Gardens Drive Communit~ Redevelopment District Point East Shopping Center In accordance with the Americans with Disabilities Act of 1990, all persons who are disabled and who need special accommodations to participate in this meeting because of that disability should contact the Office of the City Clerk, 466-8901, not later than two days pdor to such proceeding. CITY OF AVENTURA OFFICE OF THE CITY MANAGER MEMORANDUM TO: FROM: DATE: SUBJECT: City Commission Eric M. Soroka, City ~a~l~, December 1, 1998 Recommendation to Establish Guaranteed Maximum Price Construction Management Services With James A. Cummings, Inc.- Government Center Project December 15, 1998 City Commission Meeting Item RECOMMENDATION It is recommended that the City Commission adopt the attached Resolution, which establishes Construction Management Services (CMS) with a Guaranteed Maximum Price (GMP) relative to the Government Center project with James A. Cummings, Inc. The GMP has been established at $12,528,155 including a $250,000 contingency. BACKGROUND As previously authorized, the City Administration has been negotiating the CMS fee and GMP with James A. Cummings, Inc. for the Government Center project. Our goal has been to obtain the lowest possible cost while at the same time protect the integrity of the building design approved by the City Commission. We have spent a great deal of time reviewing the project in detail with the contractor and architect to accomplish this goal and I feel we are at a point where we can recommend the CMS fee and GMP to the City Commission. Process In order to develop the GMP, the contractor obtained 3 quotes from bidders for each of the major construction components (ie. electrical, mechanical, earthwork etc.). After meeting several times and reviewing the project in detail we were able to reduce the cost of the building from $14,474,665 to $12,528,155. Project Cost The agreed to project cost is as follows: Construction Cost Contingency Performance Bond Subtotal Construction Management Fee Subtotal Tax savings @ 1.5% Total 'Cost $12,158,155 250,000 120,000 12,528,155 527,000 13,055,155 (195,827) $12,859,328 S/sq. ft. $158 3 2 $163 · The GMP is $12,528,155. The Construction Management Fee is $527,000 or 4.25% of the construction cost plus contingency amount. · The first $200,000 in cost savings reverts back to the city. Any amount above the $200,000 is split 75%/25%, with the larger amount reverting back to the City. · The City shall review all bids and payments made by the contractor to subcontractors. The City has the right to reject bids submitted by the subcontractor. · The integrity of the building design approved by the City Commission has been protected. Revisions have been made to non-critical areas or those areas not visible to the public. The original project cost developed in May 1998 was $10,500,000. The cost increase can be attributed to the following factors: · Original project estimate developed by the Architect was Iow · Building conditions and Iow interest rates have increased construction costs by increasing the amount of work available to the construction community. · Building components were added after the estimate was developed (ie. Commission Chambers redesign, fiber optic cables, generator redesign for emergency conditions) · The original air conditioned building area increased from 60,000 square feet to 73,686 square feet. The total including the mechanical enclosed area on the sixth floor is 77,012. The contract with the Architect requires additional fees once the 60,000 square feet threshold is exceeded. The additional fees are $145,000. Page 2 The revised budget for the Government Center Project is as follows: Construction Cost Additional Architect Fees Security System, Phone System Furniture Contingency Total $12,859,328 140,000 400,000 400,0O0 200,000 $13,999,328 Of the total amount, $13,000,000 will be funded from the Revenue Bond Issue and $1,000,000 from the 1999/00 fiscal year General Fund Budget. Should you have any questions, please feel free to contact me. EMS CCO683-98 Page 3 1999 Revenue Bond SeHes Park Site Purchase Government Center Site Purchase Government Center ArchitectJLegalllssuance costs Proceeds Required Bond Issue Costs & Insurance Prer Debt Service Reserve Total Amount $ 3,037,072 3,400,000 12,859,328 600,000 $ 19,896,400 270,000 1,870,000 * $ 22,036,400 Estimated Annual Debt Service Requirements * 20 Year bond Issue $1,870,000 25 Year Bond Issue $1,650,000 30 Year Bond Issue $1,440,000 CIP Projection $1,450,000 CITY OF AVENTURA OFFICE OF THE CITY MANAGER MEMORANDUM TO: FROM: DATE: SUBJECT: City Commission Eric M. Soroka, Ci~. nag~ December 9, 199~ Resolution Authorizing Execution of Agreement for Construction Management Services and the Establishing Guaranteed Maximum Price With James A. Cummings, Inc. - Government Center Project December 15, 1998 City Commission Meeting Item RECOMMENDATION It is recommended that the City Commission adopt the attached Resolution, which authorizes the execution of the Agreement for Construction Management Services (CMS) with a Guaranteed Maximum Price (GMP) relative to the Government Center project with James A. Cummings, Inc. The Construction GMP has been established at $12,501,946 including a $250,000 contingency. The Construction Management Fee is $527,000. The total cost not including the potential tax savings is $13,028,946 BACKGROUND As previously authorized, the City Administration has been negotiating the CMS fee and GMP with James A. Cummings, Inc. for the Government Center project. Our goal has been to obtain the lowest possible cost while at the same time protect the integrity of the building design approved by the City Commission. We have spent a groat deal of time reviewing the project in detail with the contractor and architect to accomplish this goal and I feel we are at a point where we can recommend the CMS fee and GMP to the City Commission. Process In order to develop the GMP, the contractor obtained 3 quotes from bidders for each of the major construction components (ie. electrical, mechanical, earthwork etc.). After meeting several times and reviewing the project in detail we were able to reduce the cost of the building from $14,474,665 to $12,501,946. Project Cost The agreed to project cost is as follows: Construction Cost Contingency Performance Bond Subtotal Construction Management Fee Subtotal Tax savings @ 1.5% Total Cost $12,158,155 250,000 93,791 12,501,946 527,000 13,028,946 (195,434) $12,833,511 S/sq. ft. $ t 58 3 1 $162 · The Construction GMP is $12,501,946. · The Construction Management Fee is $527,000 or 4.25% of the construction cost plus contingency amount. · The first $200,000 in cost savings reverts back to the city. Any amount above the $200,000 is split 75%/25%, with the larger amount reverting back to the City. · The City shall review all bids and payments made by the contractor to subcontractors. The City has the right to reject bids submitted by the subcontractor. · The integrity of the building design approved by the City Commission has been protected. Revisions have been made to non-critical areas or those areas not visible to the public. · The completion date is scheduled for March 15, 2000. The original project cost developed in May 1998 was $10,500,000. The cost increase can be attributed to the following factors: · Original project estimate developed by the Architect was Iow · Building conditions and Iow interest rates have increased construction costs by increasing the amount of work available to the construction community. · Building components were added after the estimate was developed (ie. Commission Chambers redesign, fiber optic cables, generator redesign for emergency conditions) · The original air conditioned building area increased from 60,000 square feet to 73,686 square feet. The total including the mechanical enclosed area on the sixth floor is 77,012. Page 2 The contract with the Architect requires additional fees once the 60,000 square feet threshold is exceeded. The additional fees are $145,000. The revised budget for the Government Center Project is as follows: Construction Cost Additional Architect Fees Security System, Phone System Furniture Contingency Total $12,833,511 145,000 400,000 400,000 200,000 $13,978,511 Of the total amount, $13,000,000 will be funded from the Revenue Bond Issue and $978,511 from the 1999/00 fiscal year General Fund Budget. The City Attorney, Architect and staff have reviewed the Agreement. Should you have any questions, please feel free to contact me. EMS CCO683-98 Page 3 1999 Revenue Bond Series Park Site Purchase Government Center Site Purchase Government Center Architect/Legal/Issuance costs Proceeds Required Bond Issue Costs & Insurance Premiums Debt Service Reserve Total Amount $ 3,037,072 3,400,000 12,859,328 600,000 $ 19,896,400 270,000 1,870,000 $ 22,036,400 Estimated Annual Debt Service Requirements * 20 Year bond Issue $1,870,000 25 Year Bond Issue $1,650,000 30 Year Bond Issue $1,440,000 CIP Projection $1,450,000 CITY OF AVENTURA TO: FROM: DATE: SUBJECT: COMMUNITY SERVICES DEPARTMENT MEMORA~ Eric M. Soroka, City//~a~'~ r Robert M. Sherma ,r~Dir~r~ Community Services~~ November 17, 1998 Founders Recognition Dinner Staff Report Pursuant to your request, I have prepared the following analysis of staff hours dedicated to staging this event: Community Services Director Recreation Superintendent Executive Assistant Maintenance Worker TOTAL RMS/gf 96 @ $35.13 = $3,372.48 80 @ $19.81 = $1,584.80 40@$15.76 =$ 630.40 12@$ 8.49 =$ 101.88 228 $5,689.56 RMS98117 0 URB,a,N DESIGN LAND PLANNING GRAPHIC DESIGN April 6, 1998 Mr~ Albert Catullo Capital Projects Manager Cit~ of Aventura 29.'79 N. E. 191st Street Av~ntora, Florida 33180 Mn Catullo: Pu[$uanl to tho directive of the City Council, I have respected potential entry feature locations on BNcayne BOuleYard and have the following comments: I) Biscayne Boulevard Median at Snake Creek A) This is the southern terminus of the City and in this area a sil!~ similar to the one being placed in the median at the northam terminus of the Cily, may be able to be accommodated. B) This a~ea is within the FDOT right-of-way and FDOT safety and design criteria will have to be mot. I0 East Side of N.E. 187th Street (Anne Ackerman Boulevard) A) This is the Point East entrance as well as the approximate southern terminus of the City. This area is of sufficient size to allow for a major entrance feature similar to what was designed for Aventura Boulevard. B) Within this entrance feature the Point East sign must be accommodated. C) This area presently has larg~ rock faceA walls which should bo heavily screened with landscaping so the new illuminated entry featare,st~uidi out. Il!) East Side of N.E. 180th Street - This area ~s very limited but may be able to accommodate a small entry feature/sign. Iv) East side ofN.E. ! 83rd Street (Williams Island Boulevard) A) The available area includes very limited area on the south side, a median, and a larger area on the north side. B) The Williams Island Landscape Architect has developed a conceptual design for this area. V) VI) East Side of N.E. 187th Street - There is no available area dueto commercial development on the north and south sides. East Side of N. E. 191st Street - There ~s no available area due to commercial development on the north and south sides. OAK PLAZA PROFESSIONAL CENTER 8525 S.W. 92ND STREET, SUITE C11 MIAMI, FLORIDA 33156 (305) 596-6096 Mr. Albert Catullo April 6, 1998 Page two VII) William Lehman Causeway - This asea is not conducive for an entry feature since a {;anseway identification sign ex,sts m the median and the causeway primarily leads to Sunny Isles Beach. VllO East Side of Ives Dairy Road A) This area is not suitable since it will be enveloped with a high 'flyover' that would block from view any entry feature. B) On the south side of lhe intersection a retention pond is to be located while a large billboard exists on the north side. Ix) East side ofN. E. 2071h S~re~t OVaterways Boulevard) - There appears to be sufficienl area to accommodate an entry feature, however, extsung monument sq~s which occu on the north and south sides ~'ould have to bo relocated or incorporated:in the design. x) West Side ofN. E. 2071h Street - A small entry feature may be able to be accommodatad into what appears to be hospital property. East side ofN. E. 213th $lreet - The north and south sides of this intersection appear 1o have Sufficient area for an entry feature. Xl0 West Side ofN. E 2131h Street - A more modest entry fealure may b~ able to be a~commodated in this area. In :virtually all cases encroachment will have to occur on private property. Once we receive a directive as to which sit~s to address, the follovdng should occur: A) B) 0 The individual property owners in question should be contacted to determine their willingness to cooperate. A feasibility and design study should be completed to dete, nnine what size and design can be accommodated. Survey and legal input will be required for purposes of establishing easements~ Please let me know how you wish to proceed on this matter. Vet7 truly yours, O%EARY DESIGN ASSOCIATES, PA WiLLIAM A. O%EARY, FASLA '~ WAO/c. as