Loading...
2005-065 RESOLUTION NO. 2005-65 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF AVENTURA, FLORIDA, AUTHORIZING THE CITY MANAGER TO EXECUTE THE ATTACHED WORK AUTHORIZATION NO. 01-0103-065 FOR PROFESSIONAL DESIGN SERVICES FOR THE HOSPITAL DISTRICT NORTH COLLECTOR CONNECTION AND NE 213TH STREET OUTFALL UPDATE IMPROVEMENTS PROJECT BY AND BETWEEN THE CITY OF AVENTURA AND CRAVEN THOMPSON AND ASSOCIATES, INC.; AND PROVIDING AN EFFECTIVE DATE. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF AVENTURA, FLORIDA: Section 1. That the City Manager is hereby authorized to execute the attached Work Authorization No. 01-0103-065 ($89,500.00) for professional design services by and between the City and Craven Thompson and Associates, Inc. Section 2. That the City Manager is authorized to do all things necessary to carry out the aims of this Resolution. Section 3. This Resolution shall become effective immediately upon its adoption. The foregoing Resolution was offered by Commissioner Auerbach, who moved its adoption. The motion was seconded by Commissioner Holzberg, and upon being put to a vote, the vote was as follows: Commissioner Zev Auerbach yes Commissioner Bob Diamond yes Commissioner Harry Holzberg yes Commissioner Michael Stern yes Commissioner Luz Urbaez Weinberg yes Vice Mayor Billy Joel yes Mayor Susan Gottlieb yes Resolution No. 2005-..&2... Page 2 PASSED AND ADOPTED this 1st day of November, 2005 ATTEST: APPROVED AS TO LEGAL SUFFICIENCY: C,JTT~ WORK AUTHORIZATION NO. 01-0103-065 The City of Aventura has requested Work Authorization No. 01-0103-065 as provided for in the Agreement between the City of Aventura and Craven Thompson and Associates, Inc. and approved by the City Commission on July 3, 200 I. This Work Authorization No 01-0103-065 provides for technical services in accordance with Articles 3, 4, 6, 7 and 8 of the Agreement as further detailed in the scope of services in Exhibit A. Payment for such services shall be in accordance with Article 5 of the Agreement. Scbematic Desil!D Pbase Prepare Site Specific Survey .................................................................................. $8,500.00 Schematic Engineering Plans ................................................................................ $6,500.00 Coordination with City .......................................................................................... $1.500.00 Total Schematic Pbase ....................................................................................... $16,500.00 Desil!n Pbase Prepare Design Drawings ..................................................................................... $24,500.00 Prepare Drainage Calculations ............................................................................... $2,800.00 Project Management .................. ........ ........... .............. ......... .... ....... ... ........... .......... $3.500.00 Total Design Pbase ..............................................................................................30,800.00 Permittinl! Pbase Prepare and Process Permits................................................................................... $4,500.00 Coordination with DERM ...................................................................................... $1.500.00 Total Permitting Pbase......................................................................................... 56,000.00 Biddinl! Pbase Prepare Bid DocumentslTecbnical Specifications ................................................. 52,500.00 Attend Pre-bid Conference ....... ........... .................. ......... ..... .............. ........... ............. $400.00 Total Bidding Pbase ............................................................................................. $2,900.00 Construction Pbase Shop Drawing Review ............................................................................................ $1,200.00 Site Visits (Based on 150 day Construction Period) ............................................ $14,500.00 Project Closeout Documentation ............................................................................ $2.500.00 Total Construction Pbase..................................................................................... 18,200.00 Reimbursable Exnenses Printing, Graphics, Communications ..................................................................... $2,500.00 The time period for this Work Authorization will be: Schematic Design Phase.............................................60 Days Design Phase ..............................................................90 Days Pennitting Phase....................................................... 150 Days Construction Services Phase (estimate )....................150 Days BY BY City Clerk City Manager Teresa M. Soroka. MMC Eric M. Soroka. ICMA-CM day of .2005 APPROVED AS TO FORM BY Notice to Proceed Yes No City Attorney Weiss Serota Helfman Pastoriza Cole & Boniske, P.A. Project Initiation Date RECOMMENDED through its Capital Projects Manager By~tJ~' Capital Projects Manager Antonio F. Tomei I 'is day of 0 <:A- . , 2005 EXIllBIT "A" Consultant shall prepare design drawings and specifications for the next phase of the North Collector Drainage Improvements on NE 28'" Avenue and NE 213'" Street to serve the Hospital District. The plans shall include the extension of the 54" drainage culvert west of Biscayne Blvd. and the connection to the 48" drainage culvert on NE 28'" Avenue. The plans will also include the drainage improvements to the existing outfall at the intersection of NE 213'" Street and NE 34th Avenue as required by Miami-Dade County Department of Environmental Resources (DERM). This Work Authorization is based on portions of the general layout as proposed in the Drainoge & Sanitary System Study of Biscayne Lake Gardens Neighborhood and Hospital District, prepared by Craven Thompson & Associates. Consultant will more specifically perform the following: . Perform field survey and prepare survey drawings sufficient for the proposed design. · Prepare engineering plans for the extension of the 54" drainage culvert west of Biscayne Blvd. and the connection to the 48" drainage culvert on NE 28'" A venue and the drainage improvements to the existing outfall at the intersection of NE 213'" Street and NE 34'" Avenue. . Prepare Engineers Cost Estimate for the proposed improvements. · Prepare and submit drainage calculations and permit applications for a Miami-Dade County DERM Environmental Resource Permit. . Process the permit applications through thee respective agencies and obtain drawing approval by the City. . Prepare technical specifications for the inclusion into the City's Bid package. · Miscellaneous coordination with agencies, franchise utilities, and/or City. . Prepare bid documents and assist City in bidding the work. · Provide construction services, including general observation of the work to assure conformance with specifications and drawings. · Attend final inspections and coordinate with City and Contractor on fmal acceptance of the work. · Provide Statements of Completion as required by the permitting agencies and/or the City. The following services are not included: . Environmental services related to the existing North Collector drainage outfall.