Loading...
2005-059 RESOLUTION NO. 2005-59 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF AVENTURA, FLORIDA, AUTHORIZING THE CITY MANAGER TO EXECUTE THE ATTACHED WORK AUTHORIZATION NO. 01-01030-061 FOR PROFESSIONAL ENGINEERING SERVICES TO DESIGN AND PREPARE CONSTRUCTION DRAWINGS FOR IMPROVEMENTS TO THE EXISTING SEAWALL ALONG YACHT CLUB DRIVE BY AND BETWEEN THE CITY OF AVENTURA AND CRAVEN THOMPSON & ASSOCIATES FOR THE AMOUNT OF $22,000.00; AUTHORIZING THE CITY MANAGER TO DO ALL THINGS NECESSARY TO CARRY OUT THE AIMS OF THIS RESOLUTION; AND PROVIDING FOR AN EFFECTIVE DATE. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF AVENTURA, FLORIDA, THAT: Section 1. The City Manager is hereby authorized to execute the attached Work Authorization No. 01-0103-061 from Craven Thompson & Associates to design and prepare construction drawings for improvements to the existing seawall along Yacht Club Drive in the amount of $22,000. Section 2. The City Manager is authorized to do all things necessary to carry out the aims of this Resolution. Section 3. This Resolution shall become effective immediately upon its adoption. The foregoing Resolution was offered by Vice Mayor Joel, who moved its adoption. The motion was seconded by Commissioner Auerbach, and upon being put to a vote, the vote was as follows: Commissioner Zev Auerbach yes Commissioner Bob Diamond yes Commissioner Harry Holzberg yes Commissioner Michael Stern yes Commissioner Luz Urbaez-Weinberg yes Vice Mayor Billy Joel yes Mayor Susan Gottlieb yes Resolution No. 2005-22 Page 2 PASSED AND ADOPTED this 11th day. of October, 2005. APP~An~ LEGAL SUFFICIENCY: CITY ATTORNEY ~ SUSAN GOTTLIEB, MAYOR WORK AUTHORIZATION NO. 01-0103-061 The City of Aventura has requested Work Authorization No. 01-0103-061 as provided for in the Agreement between the City of Aventura and Craven Thompson and Associates, Inc. and approved by the City Commission on July 3, 2001. This Work Authorization No 01-0103-061 provides fur technical services in accordance with Articles 3, 4, 6, 7 and 8 of the Agreement as further detailed in the scope of services in Exhibit A. Payment for such services shall be in accordance with Article 5 of the Agreement. Desil!R Phase Update Site Survey... ..... .......... ............................ .... ..... ............................. ......... .$2,000.00 Prepare Design Drawings and Specifications .......................................................$7,500.00 Project Management................... ................................ ............ ....... ......................$1.000.00 Total Design Phase ...........................................................................................10,500.00 Biddinl! Phase Prepare Bid Documents.................. ..... ......................... .......... ............................ .$1,500.00 Attend Pre-bid Meeting/Address RFl's.................................................................. $500.00 Total Design Phase ............................................................................................ 2,000.00 Construction Phase Site VisitslFinallnspection................................................................................. .$6,500.00 Total Construction Phase..................................................................................56,500.00 Reimbursable EXDenses Printing, Graphics, Communications, Courriers, Etc.............................................. $500.00 Soil Borings. ................ .... ........................................................................... ........$2.500.00 Total Reimbursable Expenses...........................................................................$3,ooo.oo Total Estimated Labor Expenses are ..................................................................$19,000.00 Total Estimated Reimbursable Expenses are........................................................$3,000.00 The time period for this Work Authorization will be: Design Phase............................................................ 60 Days Construction Services Phase (estimate)..................... 60 Days ATTEST BY CITY: City Clerk Teresa M. Soroka. MMC APPROVED AS TO FORM BY City Attornev CITY OF A VENTURA, FLORIDA through its City Manager BY City Manager Eric M. Soroka. ICMA-CM day of ,2005 Notice to Proceed_ Yes No Project Initiation Date RECOMMENDED through its Director of Community Services BY Director of Community Services Robert M. Sherman.. CPRP day of ,2005 EXHWIT "A" Consultant shall prepare construction drawings and specifications for drainage and grading improvements along the existing bulkhead along Yacht Club Drive as recommended on our preliminary report to the City, dated May 2004. The plans will also include minor improvements to the existing seawall to improve drainage and to reduce the build-up of water behind the seawall. The project area will extend from the existing the existing brick paver patio area, approximately 150 feet west along Yacht Club Drive. Consultant will more specifically perform the following: . Update site survey as required. . Prepare construction plans and specifications for drainage and grading improvements. . Provide signed and sealed drawings for Building Department permit submittal. . Assist City in securing bids and awarding a contract for the corrective work. . Construction services include shop drawing review & approvals, RFI- Responses, periodic site visits during construction and final inspection.