Loading...
96-042 RESOLUTION NO. 96-42 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF AVENTURA, FLORIDA, AUTHORIZING THE CITY MANAGER TO EXECUTE THE ATTACHED WORK AUTHORIZATION NO. 154t4.06 TRAFFIC BARRIER FOR PROFESSIONAL ENGINEERING SERVICES BY AND BETWEEN THE CITY OF AVENTURA AND KEITH AND SCHNARS, P.A.; AND PROVIDING AN EFFECTIVE DATE. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF AVENTURA, FLORIDA, THAT: Section 1. The City Manager is hereby authorized to execute the attached Work Authorization No. 15414.06 ($25,140) for the traffic barrier project for professional engineering services by and between the City and Keith and Schnars, P.A. Section 2. The City Manager is authorized to do all things necessary to carry out the aims of this Resolution. Section 3. This Resolution shall become effective immediately upon its adoption. The foregoing Resolution was offered by Councilmember Beskin, who moved its adoption. The motion was seconded by Vice Mayor Rogers-Libert, and upon being put to a vote, the vote was as follows: Councilmember Arthur Berger yes Councilmember Jay R. Beskin yes Councilmember Ken Cohen yes Resolution No. 96-42 Page 2 Councilmember Harry Holzberg yes Councilmember Jeffrey Perlow yes Vice Mayor Patricia Rogers-Libert yes Mayor Arthur I. Snyder yes PASSED AND ADOPTED this 2"d day of A~THLIR I. SNNDEE, MAYOR ATTEST: TERESA M. SMITH, CMC CITY CLERK APPROVED AS TO LEGAL SUFFICIENCY: CITY ATTORNEY EMS/tms KEITH and $CHNAR$, P.A. RECEIVED September24, 1996 S~P ,' ~ 1~}.~{~ COMMUNITY SERVICE Mr. Robert Sherman Director of Community Services City of Aventura 2999 N.E. 191st Street Aventura, Florida 33180 RE: City of Aventura Lehman Causeway Traffic Safety Barriers Keith & St'briars Pro_iect No. 15414 Dear Bob: At the direction of the City Commission, our office has investigated the use of guardrails with the Florida Department of Transportation along the Lehman Causeway. The semi-rigid steel back wood rail was developed for an aesthetic alternative to the conventional guardrail systems. Enclosed is a copy of the AASHTO Roadside Design Guide for the steel back wood rail for your review and a copy of thc detail for the steel back guardrail. We presented this alternative to the Florida Department of Transportation (FDOT) in Tallahassee and based on our discussions with Mr. John Grant of the FDOT, it does not appear that the FDOT would accept this alternative at this location. The FDOT has recommended that we utilize steel guardrail or a concrete barrier at this location. Once again, the FDOT has not committed to approval of such guardrall in this area, but has indicated that these alternatives would be appropriate at this location. A final decision will not be made until an application is submitted for the project. I trust this letter will serve to update you as to the status of this particular work item and we are awaiting direction from the City of Aventura before proceeding with the preliminary design phase of this project. Sincerely yours, KEITH and SCHNARS, P.A. Engineers-Planners-Su,rveyors Peter R. Gallo, P.E. Director of Land Development/Civil Eng. PRG:ryp cc: Eric M. Soroka - City of Aventura Olivia J~c(~Ol~o-r/~gASndrews Avenue. Ft. Lauderdale, Florida $3309-2`132 (954) 776-1616 · (800) 488-'1255 · Fax (954) 771-7690 Exhibit A Work Authorization No. 15414.06 Traffic Study Barrier - Country Club Drive Scope of Consulting Services between The City of Aventura, F~orlda and Keith and Schnars, P.A. August 28, 1996 Exhibit A WORK AUTHORIZATION NO. lS414.05 TRAFFIC STUDY BARRIER - COUNTRY CLUB DRIVE SCOPE OF CONSULTING SERVICES The CONSULTANT proposes to provide professional services associated with the construction of a traffic safety barrier along Country Club Drive in the v~cinity of the Lehman Causeway. The CONSULTANT shall prepare alternate designs for the proposed traffic safety barrier and based on approval by the City of Aventura, proceed with the design of final construction plans and specifications for the traffic safety bakers. In addition, .the CONSULTANT shall proceed at the C~',/of Aventura's request with the bidding of this Work and recommend to the City of Aventura the lowest competent bidder for the work. In addition, CONSULTANT shall provide construction services relating to the construction of the proposed safety barriers, 1.0 Sun/eying Sen/ieee: 1.01 EnglneeHn_o Design Surve_v CONSULTANT shall conduct an engineering design survey along the westbound slip ramp off of the William Lehman Causeway. The survey limit~ will be approximately 1,200 feet and will extend along the length of the southerly limits of the Tumberry Isle Country Club. The services e,ntail field locations of the following: · North edge of pavement of the slip ramp; · The existing sidewalk along the no~th side of the slip ramp; · Utility features within the survey area. Additionally, elevations will be determined at 100-foot cross-section intervals throughout the survey llmlts. Office services include preparation of base sheets depicting the field locations and existing right-of-way lines. The base sheets will be prepared at a 1" = 40' sCale or as directed by the design engineer. Ail surveying services will be perform6d in accordance with Rule 61G17-6 of the Florida Administrative Code. 2.0 En~neeHn~ Servlc,~ Conca.otua! Desl_an Phase 2.01 The CONSULTANT shall meet with the City of Aventura to clarify and define the City's requJrernents for the project. 2.02 Advise the City of Aventura as to the necessity of the City providing or obtaining frorn others data or services for the completion of this project and assist the City in obtaining such data and services. 2.03 Prepare schematic layouts and sketches with .appropriate exhibits to indicate clearly the a.ltemates for this project. 2.04 Evaluate each design for conformance wlth existing engineering design standards. 2.05 Prepare a construction cost estimate of the vadous alternatives. Prel~minarv Design Pha,~e After written authorization to proceed with the preliminary design phase, the CON SU LTANT shall: 2.06 Ident[~ and analyze the requirements of governmental agencies having jurisdiction to approve the design of the proj~ect. 2.07 Prepare preliminary design documents consisting of final design criteria and preliminary drawings. 2.08 Proceed with the design of the recornmended alternative. 2.09 Prepare construction cost estimate for the selected alternative. After written authorization to prcceed with the final design phase, the CON- SULTANT shall: 2.10 Based on the accepted ~,reliminary design documents, prepare for incor- poration in the contract dccurnents, final drawings to indicate the general scope extent and charac'.er of the work to be fumishecl. 2.11 Provide technical criteria, written description and design data for the City of Aventura for use in filing s~.01ications for I;ermits with or obtaining approval of such governmental age~.cies having jurisdiction to approve the design of the project. 2.12 Prepare an adjusted construction cost estimate for the general scope extent and character of the design requirements for the project. 2.13 Prepare for review and approval by the City of Aventura, its legal counsel and other advisors contract agreement forms, general conditions and supplemental conditions, bid forms, invitation to bid and instruction to bidders to assist in the preparation of other related documents. Blddingend Negotiating Phase - After written authorization to proceed with the bidding and negotiating phase, the CONSULTANT shall: 2.14 Assist the City of Agentura in advertising for and obtaining bids, assist the City with negotiating proposals for the proposed project. CONSULTANT.will advise the City of Aventura as to the acceptability of contractors and pro,,ida a recommendation for award. 2.15 Prepare bid tabulation sheet and assist the City of Aventura in evaluating the bids and proposals submitted for the project. The CONSULTANT shall provide construction observation services necessary to certify to the regulatory agencies that the construction work has been completed in substanticil compliance with the approved documents and permits. Services included in this item are described as follows: 2.16 ~: The CONSULTANT will review shop drawings, samples, other data and reports w~. ich the selected contractor is required to submit for review, but only for the conformance with design concept of the project and compliance with the information given on the design drawings. Such review shall not extend to means, methods, techniques, sequence or procedures of construction or to safety precautions and programs incident thereto. 2.17 ~: CONSULTANT shall mare visits to the site at intervals propriate to the various stages of construction as CONSULTANT deems necessary in order to observe as an experienced and qualified design professional to review the progress and quality of the various aspects of the contractor(s)'S work. 2.16 I i n : The CONSULTANT sl3all observe the utility testing required in final certification to certif,/to the responsible utility entity (the ~tctual testing will be by others). 2.19 Censtruction Observation: Service slle{I include coordination with con- tractor(s) and responsible utility entity to facilitate construction of the improvements contained in the design plans including any preconstruction meetings. Inspections will be performed as required for permits, record drawings and final utility certification. 2.20 ~]J~aJ..[~tt[~: The CONSULTANT will prepare the finaJ certification and process record drawings for the design from the survey information to be supplied by the contractor.