Loading...
Resolution No. 2020-14 Work Authorization (2020-043508109-001)for Yacht Club Drive Drainage Improvements Project with Kimley Horn - February 4, 2020 RESOLUTION NO. 2020-14 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF AVENTURA, FLORIDA, AUTHORIZING THE CITY MANAGER TO EXECUTE ATTACHED WORK AUTHORIZATION NO. 2020-043508109- 001 FOR PROFESSIONAL DESIGN SERVICES FOR THE YACHT CLUB DRIVE DRAINAGE IMPROVEMENTS PROJECT BY AND BETWEEN THE CITY OF AVENTURA AND KIMLEY HORN; AND PROVIDING FOR AN EFFECTIVE DATE. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF AVENTURA, FLORIDA, THAT: Section 1. The City Manager is hereby authorized to execute the attached Work Authorization No. 2020-043508109-001 ($63,028) for professional design services for the Yacht Club Drive Drainage Improvements project by and between the City and Kimley Horn. Section 2. The City Manager is authorized to do all things necessary to carry out the aims of this Resolution. Section 3. The funds to be allocated and appropriated pursuant hereto and for the purposes of carrying out the tenets of this Resolution shall be from Budget Line Item Number 410-5401-538-6306. Section 4. This Resolution shall become effective immediately upon its adoption. The foregoing Resolution was offered by Commissioner Dr. Marks, who moved its adoption. The motion was seconded by Commissioner Landman, and upon being put to a vote, the vote was as follows: Commissioner Denise Landman Yes Commissioner Dr. Linda Marks Yes Commissioner Gladys Mezrahi Yes Commissioner Robert Shelley Yes Commissioner Howard Weinberg Yes Vice Mayor Marc Narotsky Yes Mayor Enid Weisman Yes City of Aventura Resolution No. 2020-14 PASSED AND ADOPTED this 4th day of February, 2020 4/(17(7()AID ENID WEISMAN, MAYOR s. i wry a�( 51 c�� ATTEST: ELLISA HORVAT , C CITY CLERK APPROVED AS TO LEGAL SUFFICIENCY: tr\._7( CITY ATTORNEY Page 2 of 2 WORK AUTHORIZATION NO. 2020-043508109-001 YACHT CLUB DRIVE DRAINAGE IMPROVEMENTS The City of Aventura has requested Work Authorization No. 2020-043508109-001 as provided for in the Agreement between the City of Aventura and Kimley-Horn and Associates, Inc. and approved by the City Commission on July 9, 2019. This Work Authorization No. 2020-043508109-001 provides for technical services in accordance with Articles 3, 4, 6, 7 and 8 of the Agreement as further detailed in the scope of services Exhibit A. Payment for such services shall be in accordance with Article 5 of the Agreement. Design Phase Construction Documents $31,140.00 Total Design Phase—Lump Sum $31,140.00 Permitting Phase Miami-Dade County Permitting $5,158.00 Total Permitting—Lump Sum $5,158.00 Bidding Phase Bidding $3,342.00 Total Bidding Phase—Lump Sum $3,342.00 Construction Phase Site Visits $23,388.00 Total Construction Phase—Lump Sum $23,388.00 Total Lump Sum Labor Fee $63,028.00 The time period for this work authorization will be: Design Phase 90 Days Permitting Phase 60 Days Bidding Phase 45 Days Construction Phase (estimate) 180 Days CITY: CITY OF AVENTURA, FLORIDA through its • Manager BY Vea,44,1". City Mana Ronald J. asson day of F g- Q. ,2020 Notice to Proceed ✓ Yes No Project Initiation Date 2 - 5 - G a o RECOMMENDED through its Director of Public Works Transportation P • W- s Direct•r Joseph S. Kroll IC. day of f.►a ,2020 Exhibit A Project Description This proposal is to prepare construction documents for the removal and replacement of the existing drainage infrastructure along Yacht Club Road from NE 34th Avenue east to the entrance of the Golden Pointe neighborhood within the City of Aventura, approximately 3,100 LF. The project also includes improvements to the landscaped medians which will include removal of the invasive species and installation of less intrusive root system landscaping.The plans will be prepared using high resolution aerials and any available survey information the City has on file. No additional surveying will be completed as part of this project.The professional services associated with the project include design, permitting, bidding assistance and limited construction phase services. Scope of Services The professional services for this project will include the following: Task 1—Construction Documents As part of this Task,the Consultant will prepare engineering plans depicting the proposed drainage and landscape improvements along Yacht Club Drive.The Consultant will utilize high resolution aerials and any available survey information the City has on file. The Consultant will perform engineering and design services for the preparation of construction plans and design requirements as notes on the plans.These construction plans shall consist of engineering plans that will depict the removal of existing drainage infrastructure and landscaping and the installation of new drainage infrastructure and landscaping along Yacht Club Road from NE 34th Avenue east to the entrance of the Golden Pointe neighborhood.The project will also include improvements to the existing medians as needed throughout the project limits.The existing drainage wells will not be modified or replaced as part of this project. Construction plans will be prepared to a level suitable to submit to Miami-Dade County for review and comment and to be utilized in a competitive bidding process. During this task, Kimley-Horn will perform the following: • Attend coordination meetings with the City to discuss project requirements. • Prepare construction plans for the proposed improvement areas which will delineate the drainage infrastructure removal and replacement, removal and replacement of existing landscaping, median improvements,along with site restoration. The plans will also include notes, details and erosion and sediment control measures. • Prepare Project Manual to include technical specifications for inclusion into the City's Bid package. Task 2—Permitting Kimley-Horn will prepare permit applications with supporting documentation to the following jurisdictional regulatory agencies. Kimley-Horn will address up to two(2) rounds of comments for the regulatory agency submittals identified below. 1. Miami-Dade County a. Tree removal b. Plan review No other agency approvals are included in this scope of services other than those identified above. Kimley-Horn does not guarantee the issuance of permits or approvals. If permits are issued for this project,the conditions and expiration dates are the sole responsibility of the City. Kimley-Horn is not responsible for extending time limited entitlements or permits.The City shall provide all permit fees. Task 3—limited Bidding Assistance It is our understanding that the City will use a competitive bidding process to award the contact to a qualified contractor to construct the improvements. Kimley-Horn shall consult with and advise the City for the proposed improvements during the bidding process.This task is limited to attendance of one (1) pre-bid meeting and issuance of addenda in response to interested contractor questions or requests for information during the bid process. All responses by Kimley-Horn will be approved by the City prior to issuance. Once bids are received, Kimley-Horn shall review the bids and provide a recommendation to the City of the apparent low bidder's price proposal.The City will be responsible in making the award. Task 4—Construction Phase Services As the Engineer of Record,the Consultant will provide limited construction phase services to assist the City in providing plan clarifications as well as responding to requests for information (RFI's) during the construction of the project. Additionally,the Consultant will review the provided shop drawings for general compliance with the intent of the design. The services provided in this Task are sufficient for the Consultant to certify the project upon completion of construction to the City of Aventura. STAFF HOUR ESTIMATE PROJECT: Yacht Club Drive Drainage Improvements CLIENT: City of Aventura ESTIMATOR: Stefano Viola DESCRIPTION: DIRECT LABOR (MAN-HOURS) Senior Principal Supervising Senior Project Engineer Field Administrative/ Expenses Line Engineer Engineer Engineer Representative Clerk Total Task 1:Construction Documents Site visit 4 4- $1,428.00 Plan preparation 2 10 60 80 1 $22,045.00 Drainage calculations 2 12 20 1 $4,889.00 Project Manual preparation 4 12 2 $2,778.00 Task 2: Permitting Miami Dade County-Tree Removal 2 6 - 4 - 1 $1,909.00 Miami Dade County-Plan Review 2 8 12 1 $3,249.00 Task 3:Limited Bidding Assistance Pre-bid meeting 3 3 1 $1,146.00 Review bids 3 10 1 $2,196.00 Task 4:Construction Phase Services _ Site Visits 24 24 156 $23,388.00 TOTAL HOURS 2 54 0 139 116 156 8 S0.00 LABOR(S/HOUR) 250.00 207.00 207.00 150.00 130.00 95.00 75.00 1.00 SUBTOTAL $500.00 $11,178.00 $0.00 $20,850.00 $15,080.00 $14,820.00 $600.00 $0.00 PAGE TOTAL $63,028.00 $63,028.00 1 1/15/2020 Kimley>>>Horn ESTIMATED QUANTITIES Project: City of Aventura-Yacht Club Drive Drainage Improvements Date: 1/15/2020 KHA No: 43508109 Location: City of Aventura, Florida Estimated Item No. Description Unit Unit Price Value Quantity Drainage 1 Mobilization 1 LS $ 50,000.00 $ 50,000.00 2 Maintenance of Traffic 1 LS $ 25,000.00 $ 25,000.00 3 Demolition/Pipe Removal 1 LS $ 50,000.00 $ 50,000.00 4 Exfiltration Trench 2,035 LF $ 150.00 $ 305,250.00 5 18"Pipe 340 LF $ 80.00 $ 27,200.00 6 Manhole 12 EA $ 5,000.00 $ 60,000.00 7 Inlet 4 EA $ 5,000.00 $ 20,000.00 8 Adjust Existing Utility Covers 1 LS $ 10,000.00 $ 10,000.00 9 Signing and Marking 1 LS $ 15,000.00 $ 15,000.00 10 Site Restoration 1 LS $ 10,000.00 $ 10,000.00 Subtotal: $ 572,450.00 Subtotal: $ 572,450.00 25%Contingency: $ 143,112.50 Total Construction Cost: $ 715,562.50 Notes: 1.The Engineer has no control over the cost of labor,materials,equipment,or over the Contractor's methods of determining prices or over competitive bidding or market conditions.Opinions of probable costs provided herein are based on the information known to Engineer at this time and represent only the Engineer's judgment as a design professional familiar with the construction industry.The Engineer cannot and does not guarantee that proposals,bids,or actual construction costs will not vary from its opinions of probable costs. 2.Due to current conditions in the construction industry,this Opinion of Probably Construction Cost is based on our most current data.We have added a 25%contingency onto the OPC it may still be below the actual bid. pg. 1 of 1