Loading...
Resolution No. 2019-02 Kaufman Lynn Construction Change Order "A" for Aventura Charter High School - January 8, 2019 RESOLUTION NO. 2019-02 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF AVENTURA, FLORIDA APPROVING AND AUTHORIZING THE CITY MANAGER TO EXECUTE AND OTHERWISE ENTER INTO THE ATTACHED CHANGE ORDER "A" FOR THE AGREEMENT FOR CONSTRUCTION MANAGEMENT SERVICES WITH A GUARANTEED MAXIMUM PRICE WITH KAUFMAN LYNN CONSTRUCTION FOR THE AVENTURA CHARTER HIGH SCHOOL; AUTHORIZING THE CITY MANAGER TO TAKE NECESSARY AND EXPEDIENT ACTION TO CARRY OUT THE AIMS OF THIS RESOLUTION; PROVIDING FOR THE APPROPRIATION AND ALLOCATION OF FUNDS FOR SAID CHANGE ORDER; AND PROVIDING FOR AN EFFECTIVE DATE. NOW, THERFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF AVENTURA, FL: Section 1. The City Manager is hereby authorized to execute and otherwise enter into the attached Change Order "A" between the City and Kaufman Lynn Construction, for the Aventura Charter High School project and incorporated herein as specifically as if set forth at length herein. Said Change Order amount is $207,593. Section 2. The City Manager is hereby authorized and requested to do all things necessary to carry out the aims of this Resolution. Section 3. The funds to be allocated and appropriated pursuant hereto and for the purpose of carrying out the tenets of this Resolution shall be from Budget Line item Number 393-6010-561-6208. Section 4. This Resolution shall become effective immediately upon its adoption. The foregoing resolution was offered by Commissioner Weinberg, who moved its adoption. The motion was seconded by Commissioner Narotsky, and upon being put to a vote, the vote was as follows: Commissioner Denise Landman Yes Commissioner Gladys Mezrahi Yes Commissioner Marc Narotsky Yes Commissioner Robert Shelly Yes Commissioner Howard Weinberg Yes Vice Mayor Dr. Linda Marks Yes Mayor Enid Weisman Yes City of Aventura Resolution No. 2019-02 PASSED AND ADOPTED this 8th day of January, 2019. ENID WEISMAN, MAYOR ' F' orn ai ATTEST: ELLISA L. HORVATH, M1.1 , CITY CLERK APPROVED AS TO LEGAL SUFFICIENCY: CITY ATTORNEY Page 2 of 2 PCCO #004 KAUFMAN LYNN CONSTRUCTION Kaufman Lynn Construction,Inc. Project: 1072 - Aventura Charter School 3185 S.Congress Avenue • 3151 NE 213th St. Delray Beach,Florida 33445 Aventura,Florida 33180 Phone: 561-361-6700 Fax: 561-361-6979 Prime Contract Change Order #004: Misc. Drawing Revisions - FPL/MEP/Partitions TO: City of Aventura FROM: Kaufman Lynn Construction,Inc. 19200 West Country Club Drive 3185 S.Congress Avenue Aventura,Florida 33180 Delray Beach Florida 33445 DATE CREATED: 12/17/2018 CREATED BY: Alissa Warfield(Kaufman Lynn Construction, Inc.) CONTRACT STATUS: Pending-In Review REVISION: 0 DESIGNATED REVIEWER: Ben Baffer(Kaufman Lynn Construction, REVIEWED BY: Inc.) DUE DATE: 12/17/2018 REVIEW DATE: INVOICED DATE: PAID DATE: SCHEDULE IMPACT: 0 days EXECUTED: No CONTRACT FOR: 1072:KL Standard Project Template Prime TOTAL AMOUNT: $207,593.00 Contract DESCRIPTION: This change order includes the following items: • Changes shown on MEP drawings revised per comments received during permit review. • Re-routing of the FPL conduits and new location of the FPL transformer,induding communications conduits,as per revised electrical drawings dated 10/30/18. This stems from the coordination meeting between JLRD and FPL. This change also indudes changing the primary feeders from copper to aluminum. • Install operable partitions at the second and third floors. This indudes the folding partition with the larger panels,the support steel,and the drywall and insulation wrapping the support steel for sound. This also indudes the reworking of the framing and drywall at Classroom 206 and Classroom 305 as per the revised architectural drawings. ATTACHMENTS: PCPCO12Backup.pdf PCPCO21 Backup.pdf PCPCO13Backup.pdf POTENTIAL CHANGE ORDERS IN THIS CHANGE ORDER: PCO# Title Schedule Impact Amount 012 Revised MEP Drawings 0 days 40,314.00 013 Electrical Service Re-design 0 days 103,485.00 021 Operable Partitions 0 days 63,794.00 TOTAL: $207,593.00 CHANGE ORDER LINE ITEMS: Kaufman Lynn Construction,Inc. page 1 of 3 Printed On:1/3/2019 01 :51 PM PCCO #004 KAUFMAN LYNN CONSTRUCTION PCO#012:Revised MEP Drawings it Cost Code Description Funding Source Type Amount 1 15-500-H.V.A.C, HVAC changes per revised drawings dated Owner Change Order Subcontractor $79,526.00 8/13/18 2 16 050-Basic Electrical Electrical changes per revised drawings dated 8/13/18 Owner Change Order Subcontractor $39,294.00 3 17-001-Job Reserves Cost to Job Reserves Owner Change Order General ($70,000.00) 4 17-010-Fee Contingency Cost to Contingency Owner Change Order General ($13,000.00) Subtotal: $35,820.00 Fee:10.00%Applies to all line item types. $3,582.00 GL:=1.25%Applies to all line item types. $493.00 Bond:s 1.05%Applies to all line Mem types. $419.00 Grand Total: $40,314.00 PCO#013:Electrical Service Re-design fl Cost Code Description Funding Source Type Amount Labor,material,and equipment for re-routing of the FPL conduits and new location of the FPL 1 16-050-Basic Electrical transformer,including communications conduits, Subcontractor as per revised electrical drawings dated 10/30/18. $91,951.00 This change also indudes changing the primary feeders from copper to aluminum. Subtotal: $91,951.00 Fee:10.00%Applies to al line Mem types. $9,195.00 GL:a 1.25%Applies to all line item types. $1,264.00 Bond:=1.05%Applies to aY line item types. $1,075.00 Grand Total: $103,465.00 PCO#021 :Operable Partitions S Cost Code Description Funding Source Type Amount 1 5-100-Steel Additonalpartitions a steel required for operable t two locations Owner Change Order Subcontractor $7,831.00 At two locations:Added soffit face,soffit bottom 2 9-050- all Packagewith one layer of drywall and insulation on each Drywside of the folding partition,and doset walls; Owner Change Order Subcontractor $13,408.00 replaced a single layer wall with two chase walls 3 11-480- Supply and instal Modemfold partitions and At letic/Reaea./rherap.Equip pocket doors at two locations Owner Change Order Subcontractor $35,445.00 Subtotal: $56,684.00 Fee:10.00%Applies to all line Mem types. $5,668.00 GL:=1.25%Applies to all line Mem types. $779.00 Bond:=1.05%Applies to all line item types. $663.00 Grand Total: $63,794.00 The original(Contract Sum) $13,859,841.00 Net change by previously authorized Change Orders ($2,293,178.18) The contract sum prior to this Change Order was $ 11,566,662.82 The contract sum would be changed by this Change Order in the amount of $207,593.00 The new contract sum including this Change Order will be $ 11,774,255.82 The contract time will not be changed by this Change Order by 0 days Kaufman Lynn Construction,Inc. page 2 of 3 Printed On: 1/3/2019 01 :51 PM KL PCCO #004 KAUFMA\LYNN CONSTRICTION Rodney Crockett(PGAL,Inc.) City of Aventura Kaufman Lynn Construction,Inc. 791 Park of Commerce Blvd.,Suite 400 19200 West Country Club Drive 3185 S.Congress Avenue Boca Raton 33487 Aventura Florida 33180 Delray Beach Florida 33445 C ;� 6 >/1/g SIGNATURE DATE SIGNATURE DATE SIGNATURE DATE Kaufman Lynn Construction, Inc. page 3 of 3 Printed On:1/3/2019 01 :51 PM