Loading...
Resolution No. 2017-28 Awarding Bid No. 17-04-25-2 Maintenance and Repair for City Streets and Facilities to Stone Concept Miami Inc., Metro Express, Inc. The Paving Lady, and Weekley Asphalt Paving Inc. - June 14, 2017 RESOLUTION NO. 2017-28 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF AVENTURA, FLORIDA AWARDING AND LETTING A BID/CONTRACT FOR BID NO. 17-04-25-2, CITY OF AVENTURA MAINTENANCE AND REPAIR FOR CITY STREETS AND FACILITIES TO STONE CONCEPT MIAMI INC., METRO EXPRESS INC., THE PAVING LADY, AND WEEKLEY ASPHALT PAVING INC. AT THE INDIVIDUAL BID PRICES AS CONTAINED IN EXHIBIT "A" ATTACHED; AUTHORIZING THE CITY MANAGER TO EXECUTE ASSOCIATED CONTRACTS; AUTHORIZING THE CITY MANAGER TO TAKE NECESSARY AND EXPEDIENT ACTION TO CARRY OUT THE AIMS OF THIS RESOLUTION; PROVIDING FOR THE APPROPRIATION AND ALLOCATION OF FUNDS FOR SAID BID AWARD; AND PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the City Manager of the City of Aventura, Florida has, pursuant to the various laws of the State of Florida and the Code of the City of Aventura, properly solicited and accordingly accepted bids for BID NO. 17-04-25-2 CITY OF AVENTURA MAINTENANCE AND REPAIR FOR CITY STREETS AND FACILITIES; and WHEREAS, sealed bids have been submitted to and received by the City pursuant to the City's invitation to bid/notice to bidders, specifications, proposals and requirements for the project/work as cited above; and WHEREAS, staff has determined that Stone Concept Miami Inc., Metro Express Inc., The Paving Lady, and Weekley Asphalt Paving Inc., have submitted the lowest responsible and responsive bids for said project/work; and WHEREAS, the City Commission, upon the recommendation of the City Manager, is therefore desirous of awarding said bid/contract to said lowest responsible and responsive bidders. NOW THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF AVENTURA, FLORIDA: Section 1. That bid/contract for BID NO. 17-04-25-2, CITY OF AVENTURA MAINTENANCE AND REPAIR FOR CITY STREETS AND FACILITIES is hereby City of Aventura Resolution No. 2017-28 awarded to Stone Concept Miami Inc., Metro Express Inc., The Paving Lady, and Weekley Asphalt Paving Inc., at the bid prices as contained in the attached bid documents. Section 2. That the City Manager is hereby authorized to execute, on behalf of the City, a contract by and between the parties embodying the terms, conditions, and specifications as set forth in the subject Invitation to Bid/Notice to Bidders, bid specifications, bid proposal and bid requirements, or if a City prepared contract was part of said bid proposal, said parties shall execute said prepared contract on behalf of the City. Section 3. That the City Manager is hereby authorized and requested to take all necessary and expedient action to carry out the aims of this Resolution in awarding this bid/contract. Section 4. That the funds to be allocated and appropriated pursuant hereto and for the purpose of carrying out the tenets of this Resolution shall be from Budget Line Item Numbers 001-5401-541-4691 and 410-5401-538-3460. Section 5. This Resolution shall become effective immediately upon its adoption. The foregoing Resolution was offered by Commissioner Shelley, who moved its adoption. The motion was seconded by Vice Mayor Weinberg, and upon being put to a vote, the vote was as follows: Commissioner Denise Landman Absent Commissioner Dr. Linda Marks Yes Commissioner Gladys Mezrahi Yes Commissioner Marc Narotsky Yes Commissioner Robert Shelley Yes Vice Mayor Howard Weinberg Yes Mayor Enid Weisman Yes Page 2 of 3 City of Aventura Resolution No. 2017-28 PASSED AND ADOPTED this 14th day of June, 2017. ENI-15 WEISMAN, MAYOR FLOC ' 46 � 0 ATTEST: ELLISA L. HORVA ' , CITY CLERK APPROVED AS TO LEGAL SUFFICIENCY: 61\ h21 l(4 CITY ATTORNEY Page 3 of 3 MEMORANDUM CRAVEN THOMPSON AND ASSOCIATES, INC. Date: May 12, 2017 To: Joseph S Kroll Public Works & Transportation Director From: Peter W. Aquart, PE, Consulting Engineer /" Reference: Maintenance and Repair for City Roads, Streets an' acilities Bid Number 17-04-25-2 At your request, we have reviewed the results for the above referenced request for bids. The following contractors submitted a bid: • Weekley Asphalt Paving, Inc. • The Paving Lady • Metro Express, Inc. • Stone Concept Miami, Inc. The four (4) named contractors are considered responsible and responsive bidders. Enclosed is a bid tabulation spreadsheet showing all of the individual unit and extended prices. We recommend awarding contracts to all four contractors. If you have any questions or require any additional information, please call. Enclosure: Bid Tabulation City of Aventura Maintenance and Repair for City Roads,Streets,and Facilities Bid No.17.00-252 Bid Tabulation Weekley Asphalt Paving,Inc The Paving Lady Metro Ex ress,Inc Stone Concept Miami,Inc. PERCENTAGE PERCENTAGE PERCENTAGE PERCENTAGE PAY ESTIMATED DESCRIPTION UNIT OF TOTAL OF TOTAL OF TOTAL OF TOTAL ITEM QUANTITY PROJECT PROJECT PROJECT PROJECT GENERAL CONDITIONS AND MOBIUZATION 1 1 GENERAL CONDITIONS AND MOBILIZATION LS 80% 60% 16% 30% COSTS FOR JOBS TOTALING$2,499 OR LESS 2 1 GENERAL CONDITIONS AND MOBILIZATION LS 50% 40% 14% 25% COSTS FOR JOBS RANGING FROM$2,500- $4,999 3 1 GENERAL CONDITIONS AND MOBIUZATION LS 32% 10% 12% 20% COSTS FOR JOBS RANGING FROM$5,000- $24,999 4 1 GENERAL CONDITIONS AND MOBILIZATION LS 15% 5% 5% 15% COSTS FOR JOBS TOTAUNG$25,000 OR MORE PAY ESTIMATED DESCRIPTION UNIT UNIT PRICE EXTENDED UNIT PRICE EXTENDED, UNIT PRICE EXTENDED UNIT PRICE EXTENDED ITEM QUANTITY COST COST COSY COST MAINTENANCE OF TRAFFIC $9,855.00 $21,446.40 $22,255.00 $39.574.00 5 1 FURNISH AND INSTALL STEEL TRAFFIC PLATES EA $1,500.00 $1,500.00 $750.00 $750.00 $300.00 $300.00 $84.00 $84.00 FOR 12-FOOT WIDE TRAFFIC LANE-DAILY RATE 6 1 FURNISH AND INSTALL STEEL TRAFFIC PLATES EA $3,800.00 $3,800.00 $3,000.00 $3,000.00 $450.00 $450.00 $540.00 $540.00 FOR 12-FOOT WIDE TRAFFIC LANE-WEEKLY RATE 7 10 TYPE I BARRICADE PER FDOT STANDARD INDEX EA $7.00 $70.00 $18.15 $181.50 $7.00 $70.00 $75.00 $750.00 NO.600-PROVIDE FOR PROJECT DURATION UP TO 14 DAYS 8 10 TYPE I BARRICADE PER FOOT STANDARD INDEX EA $16.00 $160.00 $32.20 $322.00 $14.00 $140.00 $120.00 $1,200.00 NO.600-PROVIDE FOR PROJECT DURATION UP TO 30 DAYS 9 10 TYPE II BARRICADE PER FDOT STANDARD INDEX EA $7.00 $70.00 $18.15 $181.50 $7.00 $70.00 $120.00 $1,200.00 NO.600-PROVIDE FOR PROJECT DURATION UP TO 14 DAYS 10 10 TYPE II BARRICADE PER FDOT STANDARD INDEX EA $16.00 $160.00 $32.20 $322.00 $14.00 $140.00 $180.00 $1,800.00 NO.600-PROVIDE FOR PROJECT DURATION UP TO 30 DAYS 11 10 TYPE III BARRICADE PER FDOT STANDARD EA $14.00 $140.00 $30.24 $302.40 $14.00 $140.00 $120.00 $1,200.00 INDEX NO.600-PROVIDE FOR PROJECT DURATION UP TO 14 DAYS 12 10 TYPE III BARRICADE PER FOOT STANDARD EA $30.00 $300.03 $39.05 $390.50 $30.00 $300.00 $180.00 $1,800.00 INDEX NO.600-PROVIDE FOR PROJECT DURATION UP TO 30 DAYS 13 25 FURNISH AND INSTALL TEMPORARY CONCRETE LF $29.00 $725.00 $125.00 $3,125.00 $140.00 $3,500.00 $210.00 $5,250.00 BARRIER WALL-PROVIDE FOR PROJECT DURATION UP TO 14 DAYS 14 25 FURNISH AND INSTALL TEMPORARY CONCRETE LI $29.00 $725.00 $300.00 $7,500.00 $200.00 $5,000.00 $250.00 $6,250.00 BARRIER WALL-PROVIDE FOR PROJECT DURATION UP TO 30 DAYS 15 25 FURNISH AND INSTALL TEMPORARY PLASTIC LF $29.00 $725.00 $52.00 $1,300.011 $140.00 $3,500.00 $130.00 $3,250.00 (WATER FILLED)BARRIER WALL,42"HIGH- PROVIDE FOR PROJECT DURATION UP TO 14 DAYS 16 25 FURNISH AND INSTALL TEMPORARY PLASTIC LF $29.00 $725.00 $76.82 $1,920.50 $280.00 $7,000.00 $210.00 $5,250.00 (WATER FILLED)BARRIER WALL,42'HIGH- PROVIDE FOR PROJECT DURATION UP TO 30 DAYS 17 1 PORTABLE 6 KW TOWER UGHT(INCLUDING EA $30.00 $30.00 $485.00 $485.00 $45.00 $45.00 $550.00 $550.00 POWER SOURCE AS REQUIRED)-DAILY RATE 18 1 PORTABLE 6 KW TOWER UGHT(INCLUDING EA $175.00 $175.00 $714.00 $714.00 $400.00 $400.00 $2,750.00 $2,750.00 POWER SOURCE AS REQUIRED)-WEEKLY RATE 19 1 PORTABLE 6 KW TOWER UGHT(INCLUDING EA $550.00 $550.00 $952.00 $952.00 $1,200.00 $1,200.00 $7,700.00 $7,700.00 POWER SOURCE AS REQUIRED)-MONTHLY RATE 1 STORMWATER POLLUTION PREVENTION $1,710.00 $8,500.00 $1,750.00 $9,160.00 20 100 FURNISH AND INSTALL SILT FENCE LF $2.00 $200.00 $10.00 $1,000.00 $3.00 $300.00 $8.50 $850.00 21 5 FURNISH AND INSTALL INLET SEDIMENT EA $120.00 $600.00 $500.00 $2,500.00 $50.00 $250.00 $850.00 $4,250.00 CONTROL DEVICE 22 1 FURNISH AND INSTALL TRUCK GRAVEL EA $910.00 $910.00 $5,000.00 $5,000.00 $1,200.00 $1,200.00 $4,060.00 $4,060.00 CONSTRUCTION ENTRANCE(MIN.LENGTH= 30') litinneliAralarsEUMBEISIN $8,200.00 $18,750.00 $8,350.00 $4,825.00 23 0.1 CLEARING AND GRUBBING AC $20,000.00 $2,000.00 $7,500.00 $750.00 $8,000.00 $800.00 $5,250.00 $525.00 24 SO REMOVE AND DISPOSE OF UNSUITABLE CY $28.00 $1,400.00 $30.00 $1,500.00 $85.00 $4,250.00 $17.00 $850.00 MATERIAL 25 SO IMPORT SUITABLE FILL MATERIAL-IN-PLACE CY $26.00 $1,300.00 $30.00 $1,500.00 $18.00 $900.00 $23.00 $1,150.00 Weekley Asphalt Paving,Inc The Paving Lady Metro Evros,Inc Stone Concept Miami,Inc. 26 100 FURNISH AND INSTALL ST.AUGUSTINE OR LIKE SY $5.00 $500.00 $12.00 $1,200.00 $7.00 $700.00 $5.00 $500.00 KIND SOD 27 100 FURNISH AND INSTALL BAHIA SOD SY 54.00 $400.00 $13.00 $1,300.00 $7.00 $700.00 $6.00 $600.00 28 100 SWALE RESTORATION(UP TO 12'OEEP WITH SY $26.00 $2,600.00 $125.00 $12,500.00 $10.00 $1,000.00 $12.00 $1,200.00 1V:4H SLOPES OR FLATTER) PAVING AND CONCRETE $123,043.90 $78,524.42 $52,231.04 $108,778.25 29 100 12'STABIUZED SUBGRADE(MIN.LBR OF 40) SY $4.75 $475.00 $12.00 $1,200.00 $7.00 $700.00 $7.50 $750.00 30 100 6"LIMEROCK BASE(MIN.LBR OF 100), SY $25.00 $2,500.00 $13.00 $1,300.00 $9.00 $900.00 $18.00 $1,800.00 INCLUDING PRIME COAT 31 100 EACH ADDITIONAL 2'UMEROCK BASE(MIN. SY $4.25 $425.00 $7.00 $700.00 $6.00 $600.00 $8.50 $850.00 LBR OF 100),INCLUDING PRIME COAT 32 100 1"ASPHALT TYPE SP-9.5,INCLUDING TACK SY $8.00 $800.00 $14.75 $1,475.00 $18.00 $1,800.00 $11.00 $1,100.00 COAT 33 100 EACH ADDITIONAL 1/2"ASPHALT TYPE SP-9.5, SY $4.00 $400.00 $3.00 $300.00 $9.00 $900.00 $6.50 $650.00 INCLUDING TACK COAT 34 100 11/2'ASPHALT TYPE SP-12.5,INCLUDING SY $10.50 $1,050.00 $14.00 $1,400.00 $26.00 $2,600.00 $19.00 $1,900.00 TACK COAT 35 100 EACH ADDITIONAL 1/2'ASPHALT TYPE SP-9.5, 5Y $5.25 $525.00 $3.00 $300.00 $9.00 $900.00 $6.50 $650.00 INCLUDING TACK COAT 36 100 MILL EXISTING PAVEMENT(1'AVERAGE SY $5.50 $550.00 $7.00 $700.00 $4.50 $450.00 $8.00 $800.00 DEPTH) 37 1 PREMIUM SEALCOAT(UP TO 5,000 SF) SF $0.90 $0.90 $0.25 $0.25 $0.25 $0.25 $0.42 $0.42 POLYTAR HEAVY DUTY PAVEMENT SEALER(OR APPROVED EQUAL)APPLIED PER MANUFACTURER'S(GEMSEAL) SPECIFICATIONS. 38 1 PREMIUM SEALCOAT(5,000 SF-10,000 SF) SF $0.80 $0.80 $0.22 $0.22 $0.23 $0.23 $0.37 $0.37 POLYTAR HEAVY DUTY PAVEMENT SEALER(OR APPROVED EQUAL)APPLIED PER MANUFACTURER'S(GEMSEAL) SPECIFICATIONS. 39 1 PREMIUM SEALCOAT(10,000 SF-20,000 SF) SF $0.75 $0.75 $0.19 $0.19 $0.20 $0.20 $0.33 $0.33 POLYTAR HEAVY DUTY PAVEMENT SEALER(OR APPROVED EQUAL)APPLIED PER MANUFACTURER'S(GEMSEAL) SPECIFICATIONS. 40 1 PREMIUM SEALCOAT(20,000 SF-50,000 SF) SF $0.65 $0.65 $0.14 $0.14 $0.18 $0.18 $0.32 $0.32 POLYTAR HEAVY DUTY PAVEMENT SEALER(OR APPROVED EQUAL)APPLIED PER MANUFACTURER'S(GEMSEAL) SPECIFICATIONS. 41 1 PREMIUM SEALCOAT(50,000 SF OR GREATER) SF $0.55 $0.5S $0.12 $0.12 $0.18 $0.18 $0.31 $0.31 POLYTAR HEAVY DUTY PAVEMENT SEALER(OR APPROVED EQUAL)APPLIED PER MANUFACTURER'S(GEMSEAL) SPECIFICATIONS. 42 100 REMOVE AND DISPOSE OF EXISTING ASPHALT SY $5.50 $550.00 $7.00 $700.0Q $9.00 $900.00 $28.25 $2,825.00 PAVEMENT(UP TO 4') 43 100 REMOVE AND DISPOSE OF EXISTING CONCRETE SY $29.00 $2,900.00 $42.00 $4,200.00 $9.00 $900.00 $21.50 $2,150.00 (UP TO 6") 44 100 REMOVE AND DISPOSE OF EXISTING TYPE"D' LF $8.00 $800.00 $8.10 $810.00 $1.00 $100.00 $6.00 $600.00 CONCRETE CURB 45 100 REMOVE AND DISPOSE Of EXISTING TYPE'F" LF $8.00 $800.00 $11.50 $1,150.00 $1.00 $100.00 $7.20 $720.00 CONCRETE CURB AND GUTTER OR CONCRETE VALLEY GLITTER 46 2S PAVEMENT RESTORATION(UP TO ir SY $67.25 $1,681.25 $70.00 $1,750.04 $19.00 $475.00 $97.00 $2,425.00 UMEROCK,r ASPHALT) 47 25 TYPE'''F'CURB&GUTTER,INCLUDING 4' LF $69.00 $1,725.00 $41.00 $1,025.00 $20.00 $500.00 $127.00 $3,175.00 UMEROCK PAD 48 25 TYPE'0"CURB LF $52.00 51,300.00 $18.00 $450.00 $18.00 $450.00 $110.00 $2,750.00 49 25 8'WIDE ASPHALT EXERCISE PATH W/6' LF $87.00 $2,175.00 $52.00 $1,300.00 $16.00 $400.00 $320.00 $8,000.00 UMEROCK BASE(MIN.1.13R OF 100) 50 100 4'CONCRETE SIDEWALK (MIN.3,000 PSI) SY $68.00 $6,800.00 $52.00 $5,200.00 $38.00 $3,800.00 $58.25 $5,825.00 W/COMPACTED SUBGRADE 51 100 6'CONCRETE SIDEWALK (MIN.3,000 PSI) SY $49.00 $4,900.00 $63.00 $6,300.00 $45.00 $4,500.00 $80.40 $8,040.00 W/COMPACTED SUBGRADE 52 100 REMOVE AND REPLACE EXISTING 6'STAMPED 5Y $125.00 $12,500.00 $94.00 $9,400.00 $54.00 $5,400.00 $97.50 $9,750.00 CONCRETE(MIN.3,000 PSI)W/COMPACTED SUBGRADE 53 1 POTHOLE REPAIR-UP TO 300 SQUARE FEET LS $1,500.00 $1,500.00 $900.00 $900.00 $600.00 $600.00 $2,200.00 $2,200.00 (SAWCUT AND REMOVE EXISTING ASPHALT, COMPACT BASE AND APPLY TACK COAT TO PERIMETER OF PATCHES,INSTALL Y ASPHALT, COMPACT W/VIBRATORY ROLLER 54 1 POTHOLE REPAIR-EACH ADDITIONAL 10 IS $300.00 $300.00 $26.00 $26.00 $30.00 $30.00 $100.00 $100.00 SQUARE FEET 55 25 BRICK PAVERS(MIN.3 1/8"THICK)ON 74" SY $8.00 $200.00 $62.10 $1,552.50/ $60.00 $1,500.00 $86.50 $2,162.50 SAND BED 56 100 REMOVE AND REPLACE EXISTING BRICK SY $11.00 $1,100.00 $41.40 $4,140.00 $60.00 $6,000.00 $86.50 $8,650.00 PAVERS 57 100 REMOVE AND REPLACE EXISTING HEADER LF $288.00 $28,800.00 $29.00 $2,900.00 $30.00 $3,000.00 $55.00 $5,500.00 CURB(UP TO 12"X 12") _ Weeldey Asphalt Paving,Inc The Paving Lady Metro Express,Inc Stone Concept Miami,Inc. 58 100 INSTALL NEW 8'X 12'HEADER CURB(MIN. LF $288.00 $28,800.00 $21.00 $2,100.00 $30.00 $3,000.00 $60.00 $6,000.00 4,000 PSI) 59 8 FURNISH AND INSTALL DETECTABLE WARNING SF $49.00 $392.00 $40.00 $320.00 $30.00 $240.00 $550.00 $4,400.00 (CAST-IN-PLACE MAT) 60 8 FURNISH AND INSTALL DETECTABLE WARNING SF $49.00 $392.00 $40.00 $320.00 $30.00 $240.00 $750.00 $6,000.00 (SURFACE APPLIED MAT) 61 25 FURNISH AND INSTALL GUARDRAIL PER FOOT LF $29.00 $725.00 $150.00 $3,750.00 $35.00 $875.00 $65.00 $1,625.00 STANDARD INDEX NO.400 62 2 FURNISH AND INSTALL GUARDRAIL END EA $3,000.00 $6,000.00 $1,250.00 $2,500.00 $350.00 $700.00 $32.00 $64.00 ANCHORAGE ASSEMBLY PER FDOT STANDARD INDEX NO.400 63 25 FURNISH AND INSTALL PEDESTRIAN HANDRAIL LF $85.00 $2,125.00 $150.00 $3,750.00 $95.00 $2,375.00 $80.00 $2,000.00 PER FOOT STANDARD INDEX NO.870 64 SO FURNISH AND INSTALL 6'HIGH TEMPORARY LF $9.00 $450.00 $50.00 $2,500.00 $20.00 $1,000.00 $14.00 $700.00 CHAIN UNK FENCING 65 50 FURNISH AND INSTALL 4'HIGH ORANGE LF $7.00 $350.00 $6.00 $300.00 $5.00 $250.00' $11.00 $550.00 CONSTRUCTION FENCE 66 50 FLOWABLE FILL CY 5180.00 $9,000.00 $275.00 $13,750.00 $120.00 $6,000.00 $280.00 $14,000.00 67 1 CONCRETE WHEEL STOPS-INSTALLED EA $50.00 $50.00 $55.00 $55.00 $45.00 $45.00 $65.00 $65.00 STo $559,765.00 5666,550.00 $523,560.00 68 25 PIPE CULVERT-12"DIAMETER HDPE LF $80.00 $2,000.00 $200.00 $5,000.00 $90.00 $2,250.00 (INSTALLATION INCLUDES ALL BEDDING, SHORING,ETC.AS NECESSARY TO PROVIDE WORK) 69 25 PIPE CULVERT-15"DIAMETER HDPE IS $90.00 $2,250.00 $250.00 $6,250.00 $100.00 $2,500.00 (INSTALLATION INCLUDES ALL BEDDING, SHORING,ETC.AS NErESCARY TO PROVIDE WORK) 70 2S PIPE CULVERT-15"DIAMETER RCP LF $100.00 $2,500.00 $300.00 $7,500.00 $120.00 $3,000.00 (INSTALLATION INCLUDES ALL BEDDING, SHORING,ETC.AS NECESSARY TO PROVIDE WORK) 71 25 PIPE CULVERT-18"DIAMETER HDPE LF $110.00 $2,750.00 $350.00 $8,750.00 $100.00 $2,500.00 (INSTALLATION INCLUDES ALL BEDDING, SHORING,ETC.AS NECESSARY TO PROVIDE WORK) 72 25 PIPE CULVERT-18"DIAMETER RCP IF $120.00 $3,000.00 $250.00 $6,250.00 $120.00 $3,000.00 (INSTALLATION INCLUDES ALL BEDDING, SHORING,ETC.AS NECESSARY TO PROVIDE WORK) 73 25 PIPE CULVERT-24"DIAMETER HDPE LF $140.00 $3,500.00 $300.00 $7,500.00 $120.00 $3,000.00 (INSTALLATION INCLUDES ALL BEDDING, SHORING,ETC.AS NECESSARY TO PROVIDE WORK) 74 25 PIPE CULVERT-24"DIAMETER RCP LF $160.00 $4,000.00 $400.00 $10,000.00 $160.00 $4,000.00 (INSTALLATION INCLUDES ALL BEDDING, SHORING,ETC.AS NECESSARY TO PROVIDE WORK) 75 25 PIPE CULVERT-30"DIAMETER HOPE LF $260.00 $6,500.00 $550.00 $13,750.00 $180.00 $4,500.00 (INSTALLATION INCLUDES ALL BEDDING, SHORING,ETC.AS NECESSARY TO PROVIDE WORK) 76 25 PIPE CULVERT-30"DIAMETER RCP IF $300.00 $7,500.00 $550.00 $13,750.00 $220.00 $5,500.00 (INSTALLATION INCLUDES ALL BEDDING, SHORING,ETC.AS NECESSARY TO PROVIDE WORK) 77 25 PIPE CULVERT-36'DIAMETER HDPE LF $475.00 $11,875.00 $400.00 $10,000.00 $350.00 $8.750.00 (INSTALLATION INCLUDES ALL BEDDING, SHORING,ETC.AS NECESSARY TO PROVIDE WORK) 78 25 PIPE CULVERT-36"DIAMETER RCP LF $600.00 $15,000.00 $485.00 $12,125.00 $390.00 $9,750.00 (INSTALLATION INCLUDES ALL BEDDING, SHORING,ETC.AS NECESSARY TO PROVIDE WORK) 79 25 PIPE CULVERT-42"DIAMETER RCP IS $650.00 $16,250.00 $650.00 $16,250.00 $600.00 $15,000.00 (INSTALLATION INCLUDES ALL BEDDING, SHORING,ETC.AS NECESSARY TO PROVIDE WORK) 80 25 PIPE CULVERT-48"DIAMETER RCP IF $700.00 $17,500.00 $750.00 $18,750.00 $650.00 $16,250.00 (INSTALLATION INCLUDES ALL BEDDING, SHORING,ETC.AS NECESSARY TO PROVIDE WORK) 81 25 PIPE CULVERT-54"DIAMETER RCP LF $725.00 $18,125.00 $850.00 $21,250.00 $900.00 $22,500.00 (INSTALLATION INCLUDES ALL BEDDING, SHORING,ETC.AS NECESSARY TO PROVIDE WORK) 82 25 PIPE CULVERT-60"DIAMETER RCP IS $800.00 $20,000.00 $1,150.00 $28,750.00 $1,200.00 $30,000.00/ (INSTALLATION INCLUDES ALL BEDDING, SHORING,ETC.AS NECESSARY TO PROVIDE WORK) 83 25 PIPE CULVERT-72"DIAMETER RCP LF $950.00 $23,750.00 $1,200.00 $30,000.00 $1,500.00 $37,500.00 (INSTALLATION INCLUDES ALL BEDDING, SHORING,ETC.AS NECESSARY TO PROVIDE WORK) Weekley Asphalt Paving,Inc The Paving lady Metro Express,Inc Stone Concept Miami,Inc. 84 1 CONSTRUCT NEW DRAINAGE WEU.(6'X12' EA $12,000.00 $12,000.00 $45,000.00 $45,000.00 $4,800.00 $4,800.00 STRUCTURE)(BOX ONLY) 85 1 DRILL DRAINAGE WELL(UP TO 150'DEPTH)W/ EA $92,000.00 $92,000.00 $55,000.00 $55,000.00 $42,000.00 $42,000.00 24"STEEL CASING(WELL ONLY) 86 1 RE-DRILL EXISTING DRAINAGE WELL(UP TO EA $48,000.00 $48,000.00 $30,000.00 $30,000.00 $32,000.00 $32,000.00 150'DEPTH) 87 25 4'X 4'EXFILTRATION TRENCH WITH 15" IF $195.00 $4,875.00 $225.00 $5,625.00 $120.00 $3,000.00 SLOTTED RCP 88 25 4'X 6'EXFILTRATION TRENCH WITH 15' LF $700.00 $17,500.00 $225.00 $5,625.00 $130.00 $3,250.00 SLOTTED RCP 89 1 12"ADS DRAIN BASIN EA $675.00 $675.00 $900.00 $900.00 $950.00 $950.00 90 1 15"ADS DRAIN BASIN EA $750.00 $750.00 $1,500.00 $1,500.00 $1,200.00 $1,200.00 91 1 18"ADS DRAIN BASIN EA $800.00 $800.00 $1,900.00 $1,900.00 $1,300.00 $1,300.00 92 1 24"ADS DRAIN BASIN EA $950.00 $950.00 $3,000.00 $3,000.00 $160.00 $160.00 93 1 DRAINAGE INLET(TYPE C-24'X 36') EA $4,000.00 $4,000.00 $5,000.00 $5,000.00 $4,000.00 $4,000.00 94 1 DRAINAGE INLET(TYPE C-4-48"ROUND) EA $6,800.00 $6,800.00 $6,500.00 $6,500.00 $4,200.00 $4,200.00 95 1 DRAINAGE INLET(TYPE C-5-60"ROUND) EA $7,700.00 $7,700.00 $7,200.00 $7,200.00 $5,200.00 $5,200.00 96 1DRAINAGE INLET(TYPE C-6-72'ROUND) EA $10,000.00 $10,000.00 $8,100.00 $8,100.00 $6,400.00 $6,400.00 97 1 STORM MANHOLE(TYPE M-4-48'ROUND) EA $6,800.00 $6,800.00 $6,100.00 $6,100.00 $5,200.00 $5,200.00 98 1 STORM MANHOLE(TYPE M-5-60"ROUND) EA $7,200.00 $7,200.00 $8,000.00 $8,000.00 $6,200.00 $6,200.00 99 1 STORM MANHOLE(TYPE M-6-72'ROUND) EA $10,000.00 $10,000.00 $8,200.00 $8,200.00 $7,500.00 $7,500.00 100 1 STORM MANHOLE(TYPE M-8-96'ROUND) EA $11,000.00 $11,000.00 $42,000.00 $42,000.00 $12,000.00 $12,000.00 101 1 STORM MANHOLE(TYPE M-10-120'ROUND) EA $19,000.00 $19,000.00 $51,000.00 $51,000.00 $16,000.00 $16,000.00 102 25 15"CAST-IN-PLACE PIPE UNER IF $260.00 $6,500.00 $400.00 $10,000.00 $500.00 $12,500.00 103 25 18'CAST-IN-PLACE PIPE LINER LF $280.00 $7,000.00 $400.00 $10,000.00 $800.00 $20,000.00 104 25 24'CAST-IN-PLACE PIPE LINER LF $300.00 $7,500.00 $425.00 $10,625.00 $900.00 $22,500.00 105 25 30'CAST-IN-PLACE PIPE UNER LF $370.00 $9,250.00 $500.00 $12,500.00 $1,000.00 $25,000.00 106 25 36'CAST-IN-PLACE PIPE UNER LF $560.00 $14,000.00 $550.00 $13,750.00 $1,500.00 $37,500.00 107 25 42'CAST-IN-PLACE PIPE UNER LF $600.00 $15,000.00 $600.00 $15,000.00 $1,800.00 $45,000.00 108 25 48"CAST-IN-PLACE PIPE UNER IF $900.00 $22,500.00 $650.00 $16,250.00 $120.00 $3,000.00 109 1 CORE-DRILL&CONNECT TO EXISTING EA $650.00 $650.00 $800.00 $800.00 $600.00 $600.00 DRAINAGE STRUCTURE 110 100 WELL CLEANING-24'WELL CASING UP TO LF $300.00 $30,000.00 $225.00 $22500.00 $50.00 $5,000.00 100 FEET,INCLUDING PROPER DISPOSAL OF ALL MATERIAL 111 1 BASIN CLEANING,INCLUDING PROPER EA $850.00 $850.00 $500.00 $500.00 $600.00 $600.00 DISPOSAL OF ALL MATERIAL(INCLUDES INSTALLATION OF PLUGS,PUMPS,ETC.AS NECESSARY TO PROVIDE WORK) 112 1 MANHOLE CLEANING,INCLUDING PROPER EA $950.00 $950.00 $550.00 $550.00 $600.00 $600.00 DISPOSAL OF ALL MATERIAL(INCLUDES INSTALLATION OF PLUGS,PUMPS,ETC.AS NECESSARY TO PROVIDE WORK) 113 50 CCTV VIDEO INSPECTION OF EXISTING LF $7.50 $375.00 $12.00 $600.00 $10.00 $500.00 PIPE/CULVERT,INCLUDING WRITTEN REPORT (INCLUDES INSTALLATION OF PLUGS,PUMPS, ETC.AS NECESSARY TO PROVIDE WORK) 114 1 INSTALL 15'PLUG-24 HOUR RATE,INCLUDES EA $500.00 $500.011 $1,000.00 $1,000.00 $300.00 $300.00 REMOVAL 115 1 INSTALL 18'PLUG-24 HOUR RATE,INCLUDES EA $650.00 $650.00 $1,500.00 $1,500.00 $400.00 $400.00 __ __ _ _ REMOVAL 116 1 INSTALL 24"PLUG-24 HOUR RATE,INCLUDES EA $750.00 $750.00 $1,700.00 $1,700.00 $500.00 $500.00 REMOVAL 117 1 INSTALL PLUG GREATER THAN 24'-24 HOUR EA $900.00 $900.00 $2,000.00 $2,000.00 $600.00 $600.00 RATE,INCLUDES REMOVAL 118 SO CLEAN EXISTING IS"CULVERT(INCLUDES EA $5.00 $250.00 $30.00 $1,500.00 $10.00 $500.00 PROPER DISPOSAL OF ALL MATERIAL PLUGS, PUMPS,ETC.AS NECESSARY TO PROVIDE WORK) 119 50 CLEAN EXISTING 18'CULVERT(INCLUDES LF $6.00 $300.00 $35.00 $1,750.00 $12.00 $600.00 PROPER DISPOSAL OF ALL MATERIAL PLUGS, PUMPS,ETC.AS NECESSARY TO PROVIDE WORK) 120 SO CLEAN EXISTING 24"CULVERT(INCLUDES IF $7.00 $350.00 $50.00 $2,500.00 $16.00 $800.00 PROPER DISPOSAL OF ALL MATERIAL PLUGS, PUMPS,ETC.AS NECESSARY TO PROVIDE WORK) 121 50 CLEAN EXISTING 30"CULVERT(INCLUDES LF $9.00 $450.00 $60.00 $3,000.00 $20.00 $1,000.00 PROPER DISPOSAL OF ALL MATERIAL PLUGS, PUMPS,ETC.AS NECESSARY TO PROVIDE WORK) 122 50 CLEAN EXISTING 36'CULVERT(INCLUDES LF $10.00 $500.00 $70.00 $3,500.00 $25.00 $1,250.00 PROPER DISPOSAL OF ALL MATERIAL,PLUGS, PUMPS,ETC.AS NECESSARY TO PROVIDE WORK) 123 50 CLEAN EXISTING 42'CULVERT(INCLUDES LF $12.00 $600.00 $80.00 $4,000.00 $60.00 $3,000.00 PROPER DISPOSAL OF ALL MATERIAL PLUGS, PUMPS,ETC.AS NECESSARY TO PROVIDE WORK) 124 50 CLEAN EXISTING 48"CULVERT(INCLUDES LF $15.00 $750.00 $85.00 $4,250.00 $60.00 $3,000.00 PROPER DISPOSAL OF ALL MATERIAL PLUGS, PUMPS,ETC.AS NECESSARY TO PROVIDE WORK) Weekley Asphalt Paving,Inc The Paving Lady Metro Express,Inc Stone Concept Miami,Inc 125 SO CLEAN EXISTING 54"CULVERT(INCLUDES LF $18.00 $900.00 $90.00 $4,500.00 $65.00 $3,250.00 PROPER DISPOSAL OF AU.MATERIAL,PLUGS, PUMPS,ETC.AS NECESSARY TO PROVIDE WORK) 126 50 CLEAN EXISTING 60"CULVERT(INCLUDES LI $29.00 $1,450.00 $100.00 $5,000.00 $65.00 $3,250.00 PROPER DISPOSAL OF ALL MATERIAL,PLUGS, PUMPS,ETC.AS NECESSARY TO PROVIDE WORK) 127 50 CLEAN EXISTING 72'CULVERT(INCLUDES LF $31.00 $1,550.00 $110.00 $5,500.00 $70.00 $3,500.00 PROPER DISPOSAL OF ALL MATERIAL,PLUGS, PUMPS,ETC.AS NECESSARY TO PROVIDE WORK) 128 1 PROVIDE 2'PUMP WITH DISCHARGE UNE-24-EA $200.00 $200.00 $600.00 $600.00 $100.00 $100.00 HOUR RATE 129 1 PROVIDE 2"PUMP WITH DISCHARGE UNE- EA $1,000.00 $1,000.00 $1,350.00 $1,350.00 $350.00 $350.00 WEEKLY RATE 130 1 PROVIDE 2'PUMP WITH DISCHARGE UNE- EA $3,500.00 $3,500.00/ $1,800.00 $1,800.00 $600.00 $600.00 MONTHLY RATE 131 1 PROVIDE 4'PUMP WITH DISCHARGE UNE-24-EA $270.00 $270.00 $1,500.00 $1,500.00 $150.00 $150.00 HOUR RATE 132 1 PROVIDE 4"PUMP WITH DISCHARGE UNE- EA $1,350.00 $1,350.00 $3,200.00 $3,200.00 $350.00 $350.00 WEEKLY RATE 133 1 PROVIDE 4'PUMP WITH DISCHARGE UNE- EA $4,900.00 $4,900.00 $4,000.00 $4,000.00 $700.00 5700.004 MONTHLY RATE 134 1 PROVIDE 6'PUMP WITH DISCHARGE UNE-24-EA $320.00 $320.00 $1,800.00 $1,800.00 $200.00 $200.00 HOUR RATE 135 1 PROVIDE 6"PUMP WITH DISCHARGE LINE- EA $1,600.00 $1,600.00 $4,000.00 $4,000.00 $400.00 $400.00 WEEKLY RATE 136 1 PROVIDE 6'PUMP WITH DISCHARGE LINE- EA $5,600.00 $5,600.00 $9,000.00 $9,000.00 $600.00 $600.00 MONTHLY RATE PyEMENT MARKINGS AND SIGNAGE $6,096.25 $3,131.25 $1,575.00, $2,632.50 137 1 SINGLE POST SIGN(UP TO 30'X30") EA $400.00 $400.00 $201.00 $201.00 $400.00 $400.00 $410.00 $410.00 138 25 4'SOLID STRIPING(THERMOPLASTIC) LF $3.00 $75.00 $058 $1450 $0.90 $22.50 $0.90 $22.50 139 25 6"SOLID STRIPING(THERMOPLASTIC) LI $4.00 $100.00 $0.69 $17.25 $1.00 $25.00 $1.40 $35.00 140 25 8'SOUD STRIPING(THERMOPLASTIC) LF $4.50 $112.50 $1.38 $34.50 $1.50 $37.50 $1.70 $42.50 141 2S 12"SOLID STRIPING(THERMOPLASTIC) LF $4.75 $118.75 $2.30 $57.50 $2.00 $50.00 $3.00 $75.00 142 25 18'SOLID STRIPING(THERMOPLASTIC) LF $5.50 $137.50 $3.74 $93.50 $2.25 $56.25 $4.00 $100.00 143 25 24"SOUD STRIPING(THERMOPLASTIC) LF $7.00 $175.00 $5.17 $129.25 $2.85 $71.25 $5.00 $125.00 144 25 6'SKIP STRIPING(THERMOPLASTIC) LF $4.00 $100.00 $0.75 $18.75 $1.00 $25.00 $1.20 $30.00 145 25 4'SOUD STRIPING(PAINT) LI $2.50 $62.50 $0.18 $4.50 $0.50 $12.50 $0.35 $8.75 146 25 6'SOUD STRIPING(PAINT) LI $2.90 $72.50 $0.23 $5.75 $0.60 $15.00 $0.50 $12.50 147 25 8"SOUD STRIPING(PAINT) LF $3.50 $87.50 $0.35 $8.75 $0.70 $17.50 $0.55 $13.75 148 2S 12"SOUD STRIPING(PAINT) LF $4.00 $100.00 $0.46 $11.50 $0.80 $20.00 $1.20 $30.00 149 25 18"SOUD STRIPING(PAINT) LF $5.00 $125.00 $0.58 $14.50 $0.90 $22.50 $1.35 $33.75 150 25 24'SOUD STRIPING(PAINT) LF $6.00 $150.00 $0.92 $23.00 $1.00 $25.00 $1.45 $36.25 151 25 6'SKIP STRIPING(PAINT) LF $3.00 $75.00 $0.29 $7.25 $0.60 $15.00 $1.10 $27.50 152 1 ARROW(THERMOPLASTIC) EA $140.00 $140.00 $63.25 $63.25 $200.00 $100.00 $110.00 $110.00 153 1 ARROW(PAINT) EA $90.00 $90.00 $17.25 $17.25 $90.00 $90.00 $65.00 $65.00 154 5 LETTERING PER LETTER(THERMOPLASTIC) EA $500.00 $2,500.00 $51.75 $258.75 $25.00 $125.00 $145.00 $725.00 155 1 HANDICAP SYMBOL(THERMOPLASTIC) EA $375.00 $375.00 $172.50 $172.50 $150.00 $150.00 $210.00 $210.00 156 1 HANDICAP SYMBOL(PAINT) EA $90.00 $90.00 $23.00 $23.00 $75.00 $75.00 $75.00 $75.00 157 10 REFLECTIVE PAVEMENT MARKER(RPM) EA $70.00 $700.00 $5.75 $57.50 $4.00 $40.00 $5.50 $55.00 158 10 REMOVE EXISTING THERMOPLASTIC LF $16.00 $160.00 $172.50 $1,725.00 $3.00 $30.00 $4.00 $40.00 PAVEMENT MARKINGS(HYDROBLAST) 159 1 PORTABLE STOP SIGN(30'X 30') EA $150.00 $150.00 $172.50 $172.50 $150.00 $150.00 $350.00 $350.00 NOUIU� CATEGORY JIEGULAR RATE OVERTIME REGULAR RATE OVERTIME REGULAR RATE OVERTIME OVERTIME JKEGULAR RATEAUL MN MI NO 1 LABORER $24.00 $38.50 $28.00 $42.00 $20.00 $30.00 $18.75 $28.00 2 EQUIPMENT OPERATOR $29.00 $46.40 $44.00 $66.00 $50.00 $75.00 $24.00 $36.00 3 FOREMAN $38.00 $61.00 $50.00 $75.00 $50.00 $75.00 $27.00 $41.00 4 SUPERINTENDENT $67.00 $107.00 $100.00 $150.00 $50.00 $75.00 $30.00 $45.00 S PROVIDE 2'PUMP WITH DISCHARGE UNE- $30.00 $30.00 $200.00$ $125.00 $125.00 HOURLY RATE 6 PROVIDE 4'PUMP WITH DISCHARGE UNE- $35.00 $35.00 $400.00$ $150.00 $150.00 _ _ _ HOURLY RATE 7 PROVIDE 6"PUMP WITH DISCHARGE UNE- $40.00 $40.00 $600.00$ $160.00 $160.00 HOURLY RATE