01-21-2016 Special MeetingCity Commission
Enid Weisman, Mayor
Robert Shelley, Vice Mayor
Lnlbar Cohen, Commissioner
Teri Holzberg, Commissioner
Denise Landman, Commissioner
Marc Narotsky, Commissioner
Howard Weinberg, Commissioner
City Manager
]Eric M. Soroka, ICA/1A-CM
City Clerk
]Ellisa L. Horvath, MMC
City Attorney
Weiss Scrota HelFinan
Cole & Bierman
CITY COMMISSION
SPECIAL MEETING AGENDA
JANUARY 21, 2016
9:00 A.M.
Aventura Government Center
19200 West Country Club Drive
Aventura, Florida 33180
1. CALL TO ORDER\ROLL CALL
2. RESOLUTION:
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF AVENTURA,
FLORIDA AWARDING AND LETTING A BID/CONTRACT FOR BID NO. 16-12-
16-2,188m STREET PARK IMPROVEMENTS TO FHP TECTONICS CORP. AT
THE BID PRICE OF $1,658,700.75; AUTHORIZING THE CITY MANAGER TO
EXECUTE ASSOCIATED CONTRACTS; AUTHORIZING THE CITY
MANAGER TO TAKE NECESSARY AND EXPEDIENT ACTION TO CARRY
OUT THE AIMS OF THIS RESOLUTION; PROVIDING FOR THE
APPROPRIATION AND ALLOCATION OF FUNDS FOR SAID BID AWARD;
AND PROVIDING FOR AN EFFECTIVE DATE.
3. ADJOURNMENT
This meeting is open to the public. In accordance with the Americans with Disabilities Act of 1990, all persons who are
disabled and who need special accommodations to participate in this meeting because of that disability should contact
the Office of the City Clerk, 305-466-8901, not later than two days prior to such proceeding. One or more members of
the City of Aventura Advisory Boards may be in attendance and may participate at the meeting. Anyone wishing to
appeal any decision made by the Aventura City Commission with respect to any matter considered at such meeting or
hearing will need a record of the proceedings and, for such purpose, may need to ensure that a verbatim record of the
proceedings is made, which record includes the testimony and evidence upon which the appeal is to be based. Agenda
items may be viewed at the Office of the City Clerk, City of Aventura Government Center, 19200 W. Country Club
Drive, Aventura, Florida, 33180. Anyone wishing to obtain a copy of any agenda item should contact the City Clerk at
305-466-8901.
CITY OF AVENTURA
OFFICE OF THE CITY MANAGER
MEMORANDUM
TO: City Commission
FROM: Eric M. Soroka, ICMA-
BY: Antonio F. Tomei, Cap
DATE: January 4, 2015
CM4C'Man er
itanager�,0�
SUBJECT: Recommendation: Bid No: 16-12-16-2 — 188th Street Park
Improvements
January 21, 2016 City Commission Meeting Agenda Item '�-
Recommendation
It is recommended that the City Commission adopt the attached Resolution awarding
Bid No. 16-12-16-2, 188th Street Park Improvements to the lowest responsible and
responsive bidder, FHP Tectonics Corp. for the price of $1,658,700.75.
Background
In accordance with the City's Purchasing Ordinance, bids for this project were solicited,
advertised, and opened on December 22, 2015. The City received the following seven
(7) bids for this project.-
FHP
roject:
FHP Tectonics Corp.
$1,658,700.75
JRT Construction Co.
$1,674,578.05
West Construction, Inc.
$1,699,704.45
Bejar Construction, Inc.
$1,784,222.84
Lynx Construction Management, Inc.
$1,924,491.86
ELCI Construction Group, Inc.
$1,933,191.48
AAYRA Construction & Design
$2,313,394.65
The original budgeted amount for this project was $1,400,000. The bid exceeds this
amount by $258,700.75. The cost increase can be attributed to increased construction
costs since the original estimate was developed in February of 2015. The difference will
be funded by Capital Projects Reserve Account.
This project will be funded as follows:
Budget Line Item Number: 392-5001-572-6325 - $1,158,700.75
Budget Line Item Number: 001-850-572-6325 - $500,000
This bid price allows for the furnishing of all labor, materials, tools, equipment,
machinery, superintendence, mobilization and services necessary for the construction
of the 188th Street Park. The construction time frame for substantial completion is five
months.
If you have any questions or need any additional information, please feel free to contact
me.
AFT/EMS
RESOLUTION NO. 2016-
A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF
AVENTURA, FLORIDA AWARDING AND LETTING A BID/CONTRACT
FOR BID NO. 16-12-16-2, 188TH STREET PARK IMPROVEMENTS TO
FHP TECTONICS CORP. AT THE BID PRICE OF $1,658,700.75;
AUTHORIZING THE CITY MANAGER TO EXECUTE ASSOCIATED
CONTRACTS; AUTHORIZING THE CITY MANAGER TO TAKE
NECESSARY AND EXPEDIENT ACTION TO CARRY OUT THE AIMS
OF THIS RESOLUTION; PROVIDING FOR THE APPROPRIATION AND
ALLOCATION OF FUNDS FOR SAID BID AWARD; AND PROVIDING
FOR AN EFFECTIVE DATE.
WHEREAS, the City Manager has, pursuant to the various laws of the State of
Florida and the Code of the City of Aventura, properly solicited and accordingly
accepted bids for BID NO. 16-12-16-2, 188th Street Park Improvements; and
WHEREAS, sealed bids have been submitted to and received by the City
pursuant to the City's Invitation to Bid/Notice to Bidders, specifications, proposals, and
requirements for the project/work as cited above; and
WHEREAS, staff has determined that FHP Tectonics Corp. has submitted the
lowest responsible and responsive bid for said project/work; and
WHEREAS, the City Commission, upon the recommendation of the City
Manager, is therefore desirous of awarding said bid/contract to said lowest responsible
and responsive bidder;
NOW THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE
CITY OF AVENTURA, FLORIDA:
Section 1: That the bid/contract for BID NO. 16-12-16-2, 188th Street Park
Improvements, is hereby awarded to FHP Tectonics Corp. in the amount of
$1,658,700.75.
Section 2: That the City Manager is hereby authorized to execute, on behalf of
Page I of 3
City of Aventura Resolution No. 2016 -
the City, a contract by and between the parties embodying the terms, conditions, and
specifications as set forth in the subject Invitation to Bid/Notice to Bidders, bid
specifications, bid proposal and bid requirements, or if a City prepared contract was
part of said bid proposal, said parties shall execute said prepared contract on behalf of
the City.
Section 3: That the City Manager is hereby authorized and requested to take
all necessary and expedient action to carry out the aims of this Resolution in awarding
this bid/contract.
Section 4: That the funds to be allocated and appropriated pursuant hereto
and for the purpose of carrying out the tenets of this Resolution shall be from Budget
Line Item Numbers 392-5001-572-6325 and 001-850-572-6325.
Section 5: That this Resolution shall be effective immediately upon its
adoption.
The foregoing resolution was offered by Commissioner who
moved its adoption. The motion was seconded by Commissioner , and
upon being put to a vote, the vote was as follows:
Commissioner Enbar Cohen
Commissioner Teri Holzberg
Commissioner Denise Landman
Commissioner Marc Narotsky
Commissioner Howard Weinberg
Vice Mayor Robert Shelley
Mayor Enid Weisman
Page 2 of 3
City of Aventura Resolution No. 2016 -
PASSED AND ADOPTED this 21St day of January, 2016.
ATTEST:
ELLISA L. HORVATH, MMC
CITY CLERK
APPROVED AS TO LEGAL SUFFICIENCY:
CITY ATTORNEY
ENID WEISMAN, MAYOR
Page 3 of 3
Concept Plan
A�l0
.''7®_��
� 4
Section 00410
Schedule of Values - Bidders Company Name: FHP Tectonics Coro
Time to Substantial Completion: 150 calendar days upon issuance of the Notice to Proceed.
Mme to Final Completion: 30 calendar days.
TOTAL CONTRACT TIME= 18O CALENDAR DAYS
PayFQuanfity
ItemP
Description
Unit
Unit price
Extended Price
100Construction
Liability
LS
$25,000.00
$25,000.00
101
1
Mobilization
LS
$50,000.00
$50,000.00
102
1
Project Supervision
LS
$73,722.00
$73,722.00
103
1
Testing and Survey
LS
$30,000.00
$30,000.00
104
1
Materials & Equipment
LS
$10,000.00
$10,000.00
105
1
Temporary Utilities
LS
$5,000.00
$5,000.00
106
1
Temporary Laborer
LS
$15,000.00
$15,000.00
107
1
Construction Fence
LS
$10,000.00
$10,000.00
108
1
MOT Safety Requirements
LS
$2,000.00
$2,000.00
109
1
MOT
LS
$2,000.00
$2,000.00
110
1
Construction Signage
LS
$2,500.00
$2,500.00
111
1
On Site Construction Office
LS
$0.91
$0.91
112
1
Job Supplies
LS
$5,000.00
$5,000.00
113
1
Construction Cleaning
LS
$10,000.00
$10,000.00
114
1
'As -Built' Drawing Preparation
LS
$1,000.00
$1,000.00
115
8
Palm Protection
EA
$200.00
$1,600.00
116
1024
Install Silt Fence
LF
$3.00 7
$3,072.00
188M Street Park
City of Aienera Bid No. 16-12-16-2 00410 - 1 of 11
Section 00410
Schedule of Values - Bidders Company Name: FHP Tectonics Coro
Time to Substantial Completion: 150 calendar days upon issuance of the Notice to Proceed
Time to Final Completion: 30 calendar days.
TOTAL CONTRACT TIME = 180 CALENDAR DAYS
Pay
Item
Quantity
Description
Unit
Unit price
Extended Price
117
10
Catch Basin Protection
EA
$400.00
$4,000.00
118
600
Construction Entrance (Install and Remove)
SF
$6.00
$3,600.00
119
1
Saw Cutting
LS
$2,000.00
$2,000.00
1120
50
Demo Drop Curb
LF
$10.00
$500.00
121
33
Demo F Curb / Gutter
LF
$10.00
$330.00
122
498
Demo Sidewalk
SF
$8.00
$3,984.00
123
2173
Remove Limerock Base
BY
$6.00
$13,038.00
124
2173
Remove or Amend Compacted Subgrade
SY
$6.00
$13,038.00
125
482
Haul/Dispose
CY
$50.00
$24,1 D0.00
126
1
Remove Existing Back Flow Preventer
LS
$1,000.00
.00
127
1
Park Dedication Pedestal (Including Installation of Omer Supplied Plaque)
EA
$3,000.00
E$3,,000'00()
000,00
128
1
Park Sign 6' x 3'
EA
$2,000.00
$2,000.00
129
1
SS Minnow with Label by Game Time
EA
$11,238.00
$11,238.00
130
1
Nature Discovery Play House by Game Time
EA
$8,827.00
$8,827.00
137
1
Pnmetime Swing with Stainless Steel Chairs by Game Time
EA
$4,401.00
$4,401.00
132
1
Primetime Swing Add -A -Baby with Stainless Steel Chains by Game Time
EA
$2,436.00
$2,436.00
133
1
Red Spinning Mushroom by Game Time
EA
$3,503.00
$3,503.00
198th Street Park
COY of Aventue Bid No. 16-12-16-2 00410 - 2 of 11
Section 00410
Schedule of Values - Bidders Company Name: FHP Tectonics Corn
Time to Substantial Completion: 150 calendar days upon issuance of the Notice to Proceed.
Time to Final Completion: 30 calendar days.
TOTAL CONTRACT TIME= 180 CALENDAR DAYS
Pay
Quantity H
Description
Unit
Unit price
Extended Price
134
1
Arch Swing by Game Time
EA
$6,186.00
$6,186.00
135
1
Cattail Spinner try Game Time
EA
$1,775.00
$1,775.00
136
1
Gator with label by Game Time
EA
$6,400.00
$6,400.00
137
1
Composite Playground Equipment 2 to 5; RDU Option 'B' by Game Time
EA
$17,945.00
$17,945,00
138
1
Composite Playground Equipment 5 to 12; ROU Option "B' by Game Time
EA
$88,858.00
$88,858.00
139
1
Chest Press Exercise Equipment, Mounted In -Ground, Advanced Series
Model 132711 by Game Time
FA
$7,245,00
$7,245.00
140
1
Lat-Pull Down Exercise Equipment, Mounted In -Ground, Advanced Series
Model 132721 by Game Time
EA
$8,223.00
$8,223.00
1411
Upright Cycle Exercise Equipment, Mounted Irl -Ground, Advanced Series
Model 13250i by Game Time
EA
$417900
$4,179.00
142
1
Shoulder Rotator Exercise Equipment, Mounted In -Ground, Advanced
Series Model 132991 by Game Time
EA
E7,421.00
$1,421.00
143
1
Sit -Up / Back Extension Exercise Equipment, Mounted In -Ground,
Advanced Series Model 132491 by Game Time
EA
E3,508.00
$3,508.00
144
1
I'Plyometric Box Station Exercise Equipment, Mounted In -Ground,
Advanced Series Model 132761 by Game Time
EA
$321.00
$321.00
145
1
1.5' Plyometric Box Station Exercise Equipment, Mounted In -Ground,
EA
$321'00
$321'00
Advanced Series Model 132771 by Game Time
146
1
2' Plyometric Box Station Exercise Equipment, Mounted In -Ground,
EA
$321.00
$321.00
Advanced Series Model 13278i by Game Time
147
1
Assisted Step Trainer Exercise Equipment, Mounted In -Ground, Advanced
EA
Series Model 149011 by Game Time
$1,118.00
$1,118.00
148
1
Cardio Walker Exercise Equipment, Mounted In -Ground, Advanced Series
EA
$4,178.00
$4,178.00
Model 13245i by Game Time
149
1
Balance Board Station Exercise Equipment, Mounted In -Ground, Advanced
EA
$1,386.00
$1,386.00
Series Model 13280i by Game Time
150
1
Captain's Chair Exercise Equipment, Mounted In -Ground, Advanced Series
EA
92.596.00
$2,596.00
Model 132511 by Game Time
188th Street Park
Qfy of Al Mu BidNo 16-12.16-2 00610 - 3 of 11
Section 00410
Schedule of Values - Bidders Company Name: FHP Tectonics Corp
Time to Substantial Completion. 150 calendar days upon issuance of the Notice to Proceed.
Time to Final Completion: 30 calendar days.
TOTAL CONTRACT TIME = 180 CALENDAR DAYS
Pay
I tem
Quantity
Description
Unit
unit price
Extended Price
151
1
Push -Up Station -Low Exercise Equipment, Mounted In -Ground, Advanced
Series Model 132951 by Game Time
EA
$878.00
$878.00
0
152
1
Push -Up Station -High Exercise Equipment, Mounted In -Ground, Advanced
Sens Madel 132951 by Game Time
E4
$878.00
$87800
153
1
Chin -Up Station -Low Exercise Equipment, Mounted In -Ground, Advanced
Series Madel 132851 by Game Time
EA
$924.00
$924.00
154
1
Chin -Up Station -High Exercise Equipment, Mounted In -Ground. Advanced
Series Madel 13285i by Game Time
EA
$924.00
$924.00
155
6006
Shan Structure / Canopy over Playground
SF
$14.00
$84,084.00
156
1
Shade Structure / Canopy over Playground - deleted by Addendum 1
LS
Deleted by Addendum 1
157
3604
Shade Structure / Canopy over Exercise Area
SF
$moo
$36,040.00
158
1
Shade Structure? Canopy over Exercise Area - deleted by Addendum 1
LS
Deleted by Addendum 1
159
2
Covered Bench Canopies
EA
$10,000.00
$20,000.00
160
2
Covered Bench Canopies - deleted by Addendum 1
EA
Deleted by Addendum 1
161
16
Scarborough 72" Aluminum Bench by Landscape Forms with custom color
FA
$2,000.00
$32,000.00
162
11
Kensington 35 gallon Litter Receptacle by Ultra Site; Model No. 41-Sd with
Two Openings. City of Aventura Logo on both sides of 090 Surface Silk
Screen with Epoxy Inks (Four Color Logo with Fade)
EA
$11000.00
$11,000.00
163
2
Bicycle Rack by Game Time; Model No, 7700 2 3/8' O.D. Galvanized;
custom color
EA
$30000
$600.00
164
1
Site Electrical General Conditions
LS
$10,000.00
$10,000.00
165
2
Hand Holes, P/C Conc. 2 x 2 x 3
EA
$686.00
$1,372.00
166
2520
Conduit / Cable / Ground for Site Electric
LF
$8.00
$20,160.00
167
2
WP Duplex Receptacle
EA
$696.00
$1,392.00
166th Street Park
Ciry of AvenWra Bkf No. 16-12 16 2 60410 4 of 11
Section 00410
Schedule of Values - Bidders Company Name: FHP Tectonics Corp
Time to Substantial Completion: 150 calendar days upon issuance of the Notice to Proceed.
Time to Final Completion: 30 calendar days.
TOTAL CONTRACT TIME= 180 CALENDAR DAYS
Pay
Item
Guantlty
Description
Unit
Unit price
Extended Price
168
4
J Box
EA
$324.00
$1,296.00
169
1
Panel A 200x, 120/240v 3p/4w, MCB, N3r
LS
$1,542.00
$1,542.00
170
8
Post Light. Pole Mounted including WP Duplex Receptacle
EA
$4,616.00
$36,928.00
171
6
Post Mounted Fixture (at Exercise)
EA
$1,410.00
$8,460.00
172
1
Unistrut Frame
LS
$3,636.00
$3,636.00
173
1
Electric METER
LS
$1,896.00
$1,896.00
174
1
Six Pole 60a Contractor
LS
$1,110.00
$1,110.00
175
2
Light Clods
EA
$742.00
$1,484.00
176
1
Time Clock
EA
$646.00
$646.00
177
453
Fill / Compact / Grade at Area of Removed Road Base
CY
$75.00
$33,975.00
178
341
2.5'Berm / Grading
CY
$30.00
$10,230.00
179
149
1.5' Ben / Grading
CY
$30.00
$4,470.00
180
19970
Fine Grade ( Landscape Area)
SF
$0.20
$3,994.00
181
14517
Fine Grade at Oval Open Lawn
SF
$0.20
$2,903.40
182
2
Chilled Drinking Fountain w/ Bottle Filler including Drywall by Most
Dependable Fountains Model No. 10135smss
EA
$3,750.00
$7,500.00
183
6250
1/2" Finish Layer Poured -in -Place
SF
$15.00
$93,750.00
184
6520
Playground 3' Impact layer Poured -in -Place
SF
$1.00
$6,520.00
1e91h $beer Park
Coy of Avenlva W No. 16-12-16-2 00410 - 5 of 11
Section 00410
Schedule of Values - Bidders Company Name: FHP Tectonics, Corp.
Time to Substantial Completion: 150 calendar days upon issuance of the Notice to Proceed.
Time to Final Completion: 30 calendar days.
TOTAL CONTRACT TIME = 180 CALENDAR DAYS
Pay
Item
Quantity
Desodption
Unit
Unit pdce
Extended Price
185
6872
8" Compacted #57 Stone Base
SF
$1.55
$10,651.60
186
777
8' Compacted Subgrade
SY
$1.50
$1,165.50
187
295
4' Perforated PVC Pipe
LF
$12.00
$3,540.00
188
43
4' Non -Perforated PVC Pipe
LF
$12.00
$516.00
189
2900
1/2' Finish Layer Poured -in -Place
SF
$12.50
$36,250.00
190
2900
Playground 1 1/2" Impact layer Poured -in -Place
SF
$1.00
$2,900.00
191
3188
S' Compacted d57 Stone Base
SF
$1.55
$4,941.40
192
361
8' Compacted Subgrade
BY
$1.50
$541.50
193
190
4' Perforated PVC Pipe
LF
$12.00
$2,280.00
194
40
4' Non -Perforated PVC Pipe
LF
$12.00
$480.00
195
44
Bituminous Prime Coat
GL
$5.00
$220.00
196
22
Tack Coat
GL
$5.00
$110.00
197
41
1 1/2' Asphalt/ Ton
TN
$400.00
$16,400.00
198
483
6' Limerock Base 0 Asphalt
BY
$6.00
$2,898.00
199
483
8' Stabilized Subgrade 0 Asphalt
SY$7.50
$724.50
200
3065
4' thick Concrete Sidewalk/Paving
SF
$6.00
$1839000
201
409
4' Limerock Base 0 Conc. Sidewalk
BY
$6.00
$2,454.00
leash $tree! `a
City of Avenlura Bid No. 18.12-16-2 00410 .6 of 11
Section 00410
Schedule of Values - Bidders Company Name: FHP Tectonics Corp
Time to Substantial Completion: 150 calendar days upon issuance of the Notice to Proceed.
Time to Final Completion: 30 calendar days.
TOTAL CONTRACT TIME= 180 CALENDAR DAYS
Pay
Item
Quantity
Description
Unit
Unit price
Extended Pace
202
409
12" Stabilized Base ® Conc. Sidewalk
SY
$1.50
$613.50
203
337
6' thick Concrete Sidewalk/ Paving
SF
$7.00
$2,359.00
204
18
4' Limerock Base ® Conc. Sidewalk
SY
$6.00
$108.00
205
18
12" Stabilized Base ® Conc. Sidewalk
SY
$1.50
527.00
206
276
1/2" thick Pre -molded Expansion Joint w/Recessed (1/2') Epoxy Sealant on
top
LF
$1.00
$278.00
207
3202
4" wide Smooth Trowel Finish w/Continuous Picture Frame Effect
SF
$1.00
$3202.00
208
528
12' x 12' Reinforced Ribbon Curb
LF
$20.00
$10,560.00
209
141
24' wide x 12' thick Cont Limemck Base 0 Conc. Curb
SY
$6.00
$846.00
210
141
24" wide x 12' thick Stabilized Subgmde Base ® Conc. Curb
SY
$1.50
$211.50
211
50
New F Curb / Gutter
LF
$20.00
$1,000.00
212
33
New Valley Gutter
LF
$20.00
$660.00
213
916
6 Ft High Aluminum Perimeter Security Fencing (Powder Coated)
LF
$55.00
$50,380.00
214
172
4 Ft High Aluminum Security Fencing at Playground (Powder Coated)
LF
$42.00
$7,224.00
215
1
Aluminum Gate 4 Ft High (Powder Coated)
EA
$550.00
$550.00
216
3
Aluminum Gate 6 Ft High (Powder Coated)
EA
$630.00
$1,890.00
217
1
Vehicular Sliding Gate 12 Ft Wide x 6 FT High (Including Track); Aluminum
EA
$3,900.00
$3.900.00
218
2
2' Potable Water Meter Service Tap. and Service Line - see addendum 1
for revised quantity
EA
$11,000.00
$22,000.00
loam meek Pan
City d Awrnt ei0 No. 16-12-16.2 00410 - ] of 11
Section 00410
Schedule of Values - Bidders Comoanv Name: FHP Tectonics. Corp.
rime to Substantial Completion: 150 calendar days upon issuance of the Notice to Proceed.
Time to Final Completion: 30 calendar days.
TOTAL CONTRACT TIME= 180 CALENDAR DAYS
Pay
Item
Quantity
Description
Unit
Unit price
Extended Price
219
2
2' Backflow Preventer and Pipe Assembly per local Code - see addendum
1 for revised quantity
EA
$80000
$1,600,00
220
1
Copper Grounding Plate at Controller
EA
$500.00
$500.00
221
1
Rain Bird Espl21 xme Controller with Fsplxmsm4 4 -Station Module and
LXMM Metal Cabinet, LIMTKIT Radio Kit, Grounding Package and Rain
Bird RSD-Bix Rain Sensor, Provide Connection 8 Materials Necessary for
Controller Installation and Operation
$2,100.00
92,100.00
222
132
Rain Bird 1804 -PRS Sprinkler with Spx-Flex ® 3' long
EA
$8.50
$1,122.00
223
254
Rain Bird 1806 -PRS Sprinkler with Spx-Flex ® T long
EA
$10.00
$2,540.00
224
80
Rain Bird 1812 -PRS Sprinkler with Spx-Flex 0 3' long
EA
$13.00
$1,040.00
225
214
Rain Bird 1401 PC Rood Bubbler w/ 1/2' K -Flex ® 3' Long
EA
$10.00
$2,140.00
226
44
Rain Bird 5006 -Pc -PI with MPR Nozzle and 3/4' K -Flex 0 T Long
EA
$20.00
$880.00
227
9
Rain Bird 5006 -Fc -PI with MPR Nozzle and 3/4' K -Flex 0 3' Long
EA
$20.00
5180.00
228
3
1' Rain Bird 100-Peb Electric Control Valve with Valve Box
EA
$225.00
$675.00
229
10
1 1/2' Rain Bird 150-Peb Electric Control Valve with Valve Box
EA
$250.00
$2,500.00
230
1
2' Rain Bird 200-Peb Electric Control Valve with Valve Box
EA
$325.00
$325.00
231
15
2 1/2' PVC CL 200 Mainline, Solvent Weld
LF
$5.00
$75.00
232
640
2' PVC CL 200 Mainline, Solvent Weld
LF
$4.00
$2,560.00
233
20
2 1/2' PVC CL 200 Lateral Line, Solvent Weld
LF
$3.75
$75.00
234
155
2' PVC CL 200 Lateral Line, Solvent Weld
LF
$3.00
5465.00
235
255
1 1/2' PVC CL 200 Lateral Line, Solvent Weld
LF
$2.50
5637.50
188th S"M Park
Qty of Averdura Bid No. 19-12-16-2 00410 - 8 of 11
Section 00410
Schedule of Values - Bidders Company Name: FHP Tectonics Corp
Time to Substantial Completion: 150 calendar days upon issuance of the Notice to Proceed.
Time to Final Completion: 30 calendar days.
TOTAL CONTRACT TIME = 180 CALENDAR DAYS
Pay
Item
Ouanti H
Description
Unit
Unit price
Extended Price
236
825
1 1/4" PVC CL 200 Lateral Line, Solvent Weld
LF
$2.50
$2,062.50
237
1025
V PVC CL 200 Lateral Line, Solvent Weld
LF
$2.25
$2,306.25
238
4500
3/4" PVC CL 200 Lateral Line, Solvent Weld
LF
$2.25
$10,125.00
239
15
6' Schedule 40 PVC Sleeve
LF
$10.00
$150.00
240
105
4- Schedule 40 PVC Sleeve
LF
$8.00
$840.00
241
30
2' Schedule 40 PVC Sleeve
LF
$4.00
$120.00
242
4515
14-1 Gauge Control Wire with Waterproof Connectors
LF
$0.40
$1,806.00
243
785
14-1 Gauge Common Wire with Waterproof Connectors
LF
$0.40
$314.00
244
14
Satin Leaf; 12'x 4'; 3" caliper
EA
$386.00
$5,404.00
245
16
White Plumena; 10'x 10; 3' caliper
Fel
$536.00
$8,576.00
246
18
Mahogany; 25'x 12'; 8' caliper
EA
$2,556.00
$46,008.00
247
48
Staking; 4" x 4" Pressure Treated Lumber
EA
$10.00
$480.00
248
15
Montgomery Palm; 16' Overall Height
EA
$341.00
$5,115.00
249
13
Montgomery Palm; 20' Overall Height
EA
$361.00
$4,693.00
250
6
Montgomery Palm; 24' Ovemll Height
EA
$426.00
$2,556.00
251
15
Triple Coconut Palm; 30' Ovemll Height; Matched
EA
$2,841.00
$42,615.00
252
49
Staking 2"x 4' Pressure Treated Lumber
EA
$8.00
$392.00
188th street Park
Cilyo1Avenexa Bio No. 1&12-16-2 00410 aof11
Section 00410
Schedule of Values - Bidders Company Name: FHP Tectonics, Corp.
Time to Substantial Completion: 150 calendar days upon issuance of the Notice to Proceed.
Time to Final Completion: 30 calendar days.
TOTAL CONTRACT TIME- 180 CALENDAR DAYS
Pay
Item
Ouanti
Descri p tion
Unit
Unit price
Extended Price
253
243
Yellow Necklace Pod; 18' x 24'; Full to Ground
EA
$11.00
$2,673.00
254
93
Small leaf Pitch Apple; 6'x T; Full to Ground
EA
$146.00
$13,578.00
255
332
Staking; 8' x 3' Diameter Pressure Treated Lodge Poles (2 per 6' Pitch
Apple)
EA
$4.00
$1,328.00
256
1173
Asiatic Jasmine; 12' x 18'; Full
EA
$10.00
$11,730.00
257
702
Kangaroo Paw Fem; 18' x 18'; Full
EA
$6.00
$4,212.00
258
14300
Bermuda (Cynodon dactylon'Tifway 419') SOLID SOD
SF
$1.25
$17,875.00
259
22520
St. Augustine (Stenotaphrum secundatum'Palmetto') SOLID SOD
SF
$0.85
$19,142.00
260
8
Royal Palm; 35' Overall Height
EA
$2,275.00
$18,200.00
261
8
Staking 4' x 4' Pressure Treated Lumber
EA
$10.00
$80.00
262
2219
Mulch at Landscape Areas; 3' Deep
SY
$2.00
$4,438.00
263
26
Landscape Maintenance
WKS
$440.00
$11,440.00
264
470
18' HDPE Pipe
LF
$85.00
$39,950.00
265
335
15' HDPE Pipe
LF
$75.00
$25,125.00
266
1
Dewatering Allowance
LS
$4,000,00
$4,000.00
267
1
24' Dia. Drainage Well (Allowance)
ALW
$29,000.00
$29,000.00
268
1
Drainage Well Structure 13' x 8.5'x 8'
EA
$15,500.00
$15,500.00
269
0
Storm M.H. / C.B. / Inlet
EA
$1.00
50.00
1e61h Street Park
Cf1y Of Avenlura ek1 No. 16-12-16-2 00610 . Ind 11
Section 00410
Schedule of Values - Bidders Company Name: FHP Tectonics, Corp.
Time to Substantial Completion: 150 calendar days upon issuance of the Notice to Proceed.
Time to Final Completion: 30 calendar days.
TOTAL CONTRACT TIME= 180 CALENDAR DAYS
Pay
Item
Quantity
Description
Unit
Unit price
Extended Price
270
1
Dewater Allowance
LS
$3,000.00
$3,000.00
271
5
Catch Basin (1.5)
EA
$4,250.00
$21,250.00
272
3
Yard Drain (AC)
EA
$2,000.00
$6,000.00
273
280
1"Water Meter
LF
$20.00
$5,600.00
274
1
Manifold
EA
$500.00
$500.00
275
1
1' RPZ Backflow Preventer
EA
$750.00
$750.00
276
1
1' Irrigation Pressure Vacuum Breaker
EA
$500.00
$500.00
277
1
North Miami Beach Impact Fees
AL
$15,133.94
$15,133.94
278 1 Excavation of Unsuitable Soils and Replacement with Select Fill - LS $2,000.00
addendum 7
SUB -TOTAL
$2,000.00
$1,579,715.00
5% CONTINGENCY
$78,985.75
TOTAL
$1,658,700.75
18891 Sheet Park
City of Avwture SW No, 1612-18-2 00410 - 11 O1 11
*BIDS SHALL BE AWARDED BY THE CITY TO THE LOWEST RESPONSIVE AND
RESPONSIBLE BIDDER. INANALYZING BIDS, THE CITYMAYALSO TAKE INTO
CONSIDERA TIONALTERNA TE AND UNIT PRICES. REFER TO ARTICLE 2.1, SECTION
710-3.
Item Notes
NOT USED
The Contractor is responsible to properly coordinate all elements of the Work within each phase
of construction and to ensure that the work is completed in accordance with the contract
documents. The Contractor shall properly secure each work zone to restrict public access as
necessary, including, but not limited to utilizing barricades, temporary fencing, signage, etc. Any
changes to the proposed construction phasing plan shall be submitted and approved by the City of
Aventura and Consultant prior to starting the Work. The Contractor shall submit an MOT Plan
for approval by the City of Aventura and Consultant prior to starting the Work. The Contractor
shall ensure proper and adequate access to all properties/driveways is maintained throughout the
entire duration of construction. Work within the right-of-way may be restricted whenre it
conflicts with the Charter School (across 188" Street) activities.
Unless specifically allowed by the Work Order, the Contractor shall not store overnight any
equipment or stockpile any materials within the right-of-way. At the end of each work day, the
Contractor shall remove all stockpiled materials and equipment to an off-site location authorized
for materials stockpiling and equipment storage. Also includes cost of remobilizing materials and
equipment at the Work site at the beginning of each work day.
General notes:
1. The Contractor shall secure a City of Aventura Public Works permit prior to starting construction.
2. All work shall comply with city of Aventura standards and the latest edition of the Florida Department
of Transportation standard specifications for road and bridge construction and design standards.
3. All work shall be performed in accordance with established methods and practices as approved by the
City of Aventura, City of North Miami Beach Water and Wastewater Public Utilities Division, Miami -
Dade County, DERM and/or Florida Department of Transportation standards. All work shall be subject
to the approval of the city's consulting engineer or staff before final payment is made.
4. BIDDER understands and agrees that the Contract Price is lump sum to furnish and install all of the
Work complete in place. The Schedule of Values is provided for the purpose of Bid Evaluation and
188th Street Park
City of Aventura Bid No. 16-12-16-2
00410-20
Bermello Ajamil & Partners, Inc.
u-u•-M�mii�
Date: December 26, 2015
Architecture
Engineering
Planning
Interior Design
Landscape Architecture
To: Antonio F. Tomei, Capital Projects Manager
Office of the City Manager
From: Randy Hollingworth
Project Manager
Director Landscape Architecture, Planning & Urba Design
Reference: 188th Street Park, City of Aventura
Bid Number 16-12-16-2
At the request of the City, B&A reviewed the bids submitted by the following
Bidders for the construction of the 188th Street Park in the City of Aventura.
Bidders: 1.
FHP Tectonics Corp.
2.
J.R.T. Construction Company
3.
West Construction, Inc.
4.
Bejar Construction, Inc.
5.
Lynx Construction Management, LLC
6.
E.L.C.I. Construction Group, Inc.
7.
AARYA Construction & Design, Inc.
Attached is the detailed spreadsheet for all seven bidders, illustrating unit and
extended prices for all items listed in the Bid Package.
Our detailed review of the seven bids indicated that numerous item extension
numbers were incorrect and/or quantities were incorrect per the issued
Addendum. Revisions were made to the appropriate bids based on the errors
noted below.
Note: Any number changed from the original bid number on the BA excel sheets
is highlighted in yellow, missing items highlighted in red.
2601 South Bayshore Drive • I Oth Floor • Miami • Florida • 33133 • Main 305 859 2050 www.bermelloajamil.com
1881h Street Park Bid Evaluations, December 26, 2015 Page 2
1: FHP Tectonics Corp.
No errors were noted therefore no corrections made to this bid
Final Bid: $1,658,700.75
2: J.R.T. Construction Company
Corrections:
Item 120 incorrect extended price should be $10,000.00 not $200.00
Item 121 incorrect extended price should be $3,300.00 not $100.00
Item 157 should be $65,664.88 not $65,649.09
Item 166 should be $19,252.80 not $19,242.00
Final REVISED Bid: $1,688,247.35
3: West Construction, Inc.
Corrections:
Item 218 quantity should be 2, add $2,750.00
Item 219 quantity should be 2, add $3,850.00
Item 278 is missing from the bid
Page 1 subtotal should be $119,530.00 not $129,530.00, reduce
bidders # by $10,000.00
Final REVISED Bid: $1,712,025.47
4: Bejar Construction, Inc.
Corrections:
Item 218 quantity should be 2, add $3,850.00
Item 269 quantity should be 0, reduce $5,500.00
Final REVISED Bid: $1,782,486.70
5: Lynx Construction Management, LLC
Corrections:
Incorrect calculations on Items 122, 123, 124, 166, 183, 185, 189, 191,
242, 258 and 259. Result adds $142.39 to bid.
Item 197 quantity should be 41, extended price $960.22 not
$12,995.33
Item 213 quantity should be 916, extended price $56,178.28 not
$56,786.95
Final REVISED Bid: $1,906,871.80
2601 South Bayshore Drive • I Oth Floor • Miami • Florida • 33133 • Main 305 859 2050 www.bermalloajamil.com
188th Street Park Bid Evaluations, December 26, 2015
Page 3
6: E.L.C.I. Construction Group, Inc.
Corrections:
Incorrect calculations on Items 116, 118,123, 124, 155, 157, 166, 177, 178, 180, 183,
184, 185, 189, 190, 191, 244, 258, and 259. Result adds $1,169.49 to bid.
Item 218 quantity should be 2, extended price $6011.24 not $3005.62
Item 219 quantity should be 2, extended price $2,433.34 not $1,216.67
Item 269, quantity should be 0, subtract $1,000.00
Final REVISED Base Bid: $1,937,772.83
7: AARYA Construction & Design, Inc.
Corrections:
Item 115 extended price should be $26,400.00 not $3,300.00
Item 126 quantity should be 1, reduce $698.00
Incorrect calculations on Items 155, 183, 184, 208 and 240.
Result adds $665.86 to bid.
Item 219 quantity should be 2, extended price $2497.00 not $1,248.50
Item 269, quantity should be 0, subtract $1,650.00
Final REVISED Bid: $2,257,468.92
Following the revision of each bid as noted above, and based only on the bid
values, it is our opinion that FHP Tectonics Corp. is the lowest bidder and
recommend awarding the contract to them for the amount of $1,658,700.75.
If you have any questions please call.
Enclosure: Bid Tabulation
2601 South Bayshore Drive • I Oth Floor • Miami • Florida • 33133 • Main 305 859 2050 www.bermelloajamil.com
188th STREET PARK
'' BID EVALUATIONS ba
CITY OF AVENTURA
GENERAL CONDITIONS
ITEM
DESCRIPTOIN
UNIT
OTY.
FHP Tectonics Corp.
JRT Construction
West Construction
Bejar Construction
Lynx Construction
Management LLC
E.L.C.I. Construction Group,
Inc.
AARYA Construction &
Design, Inc.
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
]CO
CONSTRUCTION LIABILITY
LS
1
$25000.00
$25000.00
$52812.00
$52812.00
$10,400.00
$104 .00
$36,587.CO
$36,587.CO
$5,094.CO
$5,094.00
$5,169.66
$5,169.66
$16,500.CO
$16,500.00
101
MOBILIZATION
LF
1
$50,000.00
$50 0.00
$50,237.34
$50,237.34
$29,700.00
$29,7CO.00
$5,500.CO
$5,500.CO
$11,150.CO
$11,150.CO
$24,1 CO.70
$24,100.70
$8,250.CO
$8,250.00
102
PROJ ECT SU PEPAIS ION
EA
1
$73,722.COI
$73,722.00
$82611.66
$82611.66
$43,900.CO
$43,900.00
$19,800.00
$19,800.CO
$144,950.00
$144,950.00
$78,820.51
$78,820.51
$77,000001
$77000.00
103
TESTI NG AN D SU RVEY
SF
1
$30,000.00
$30,000.00
$26,675.00
$26,675.00
$13,750.00
$13,750.00
$16,500.CO
$16,500.CO
$1,338.CO
$1,338.00
$21,039.32
$21,039.32
$6,490.CO
$6,490.00
104
MATE RIALS AN D EQU IPM ENT
LS
1
$10,000.00
$10000.00
$0.00
$0.00
$5,500.CO
$5,5CO.00
$5,500.00
$5,500.CO
$947.75
$947.75
$8,656.18
$8,656.18
$22000.CO
$22000.00
105
TEMPORARY UTILITIES
LF
1
$5,000.00
$5,CO0.00
$9,330.00
$9,330.00
$3,850.00
$3,850.00
$5,500.COI
$5,500.CO
$1,495.95
$1,495.95
$1,082.02
$1,082.02
$13,200.co
$13,200.00
106
TEMPORARY LABORER
LF
1
$15000.00
$15,000.00
$2600.00
$26CO.00
$2750.00
$2750.00
$3,300.CO
$3,300001
$3,186.45
$3,186.45
$34000.75
$34,00.75
$6,600.1
$6,600.00
107
CONSTRUCTION FENCE
LF
1
$10,000.00
$10000.00
$6,782.00
$6,782.00
$3,080.00
$3,080.00
$3,300.CO
$3,300.CO
$3,469.88
$3,469.88
$8,415.73
$8,415.73
$3,850.co
$3,850.00
108
MOT SAFETY REQUIREMENTS
LF
1
$2000.00
$2 0.00
$1,5CO.00
$1,5CO.00
$1,1C0.00
$1,1 CO.00
$1,650.CO
$1,650.00
$1,338.CO
$1,338.00
$1,803.37
$1,803.37
$5,500.CO
$5,500.00
109
MOT
LF
1
$2000.00
$2 0.00
$2000.00
$2000.00
$5,500.00
$5,5CO.00
$1, 1 Paco
$1,100m
$892.00
$892CO
$501.69
$501.69
$5,500.CO
$5,500.00
110
CONSTRUCTION SIGNAGE
LF
1
$2500.00
$25CO.00
$720.00
$720.00
$660.00
$660.00
$1,650.CO
$1,650.CO
$446.00
$446.CO
$601.12
$601.12
$3,300.CO
$3,300.00
111
ONSITE CONSTRUCTION OFFICE
LF
1
$0.91
$0.91
$1,900.00
$1,9C0.00
$1,980m
$1,980.00
$5,500.00
$5,500.CO
$4,571.50
$4,571.50
$1,442.70
$1,442.70
$3,300.CO
$3,300.00
112
JOB SUPPLIES
LF
1
$5,000.00
$5,000.00
$1,900m
$1,9C0.00
$550001$550.00
$1,650.00
$1,650:CO
$1,984.03
$1,984.03
$601.12
$601.12
$1,100.CO
$1,100.00
113
CONSTRUCTION CLEANING
LF
1
$10,000.00
$10000.00
$6,000.00
$6,000:00
$1,650.CO
$1,650.00
$2200.
$2200.CO
$1,226.50
$1,226.50
$2404.49
$2404.49
$5,500.CO
$5,500.00
114
AABUILTDRAWING PREPARATION
LF
1
$1,000m
$1000.00
$1,50OCO
$1,500.00
$2750.CO
$2750.00
$2200.00
$2200.00
$557.50
$557.50
$3,005.62
$3,CO5.62
$5,500.CO$5,500.00
115
PALM PROTECTION
LF
8
$200.CO
$1,6CO.00
$20F.001
$1,600.00
GGOCO
$1,760.00
$176.00
$1,408.CO
$0.00
$0.00
$120.22
$961.76
$3,300.CO$
Y
SUBTOTAL
$242,822.91
$248,168.00
$128,880.00
$113,345.00
$182,647.56
$193,006.74
$209,990.00
ITEM'.;
DESCRIPTOIN
UNIT
OTY.
FHP Tectonics Corp.
JRT Construction
West Construction
Bejar Construction
Lynx
E.L.C.I. Construction Group
AARYA Construction &
Design, Inc.
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
116
INSTALL SILT FENCE
LF
1,024
$3.00
$3,072.00
$2.51
$2570.24
$2.25
$2252.80
$4.35
$4,454.40
$4.46
$4,567.04
$2.64
$2703.36
$3.30
$3,379.20
117
CATCH BASIN PROTECTION
EA
10
$400.00
$4,000.00
$240.CO
$2400.00
$11 000
$1,100.00
$110.00
$1, 100.00
$3,947.10
$39,471.00
$36.07
$360.70
$220.00
$2200.00
118
CONSTRUCTION ENTRANCE(INSTALL&
REMOVE)
SF
600
$6.00
$3,600.00
$2.00
$IAC0.00
$4.40
$2640.00
$9.16
$5,496.1
$2.73
$1,638.CO
$1.80
$1,080.CO
$2.75
$1,655.00
119
SAW CUTTING
LS
1
$2000.00
$2000.00
$250.00
$255.00
$550.00
$555.00
$550.00
$55OCO
$278.75
$278.75
$601.12
$601.12
$1,100.00
$1,100.00
125
DEMO DROP CURB
LF
50
$10.00
$5CO.00
$20OCO
$10,000.00
$4.40
$220.00
$24.20
$1,210.00
$5.03
$251.55
$6.01
$300.55
$6.99
$349.50
121
DEMO FCURB/GUTTER
LF
33
$1 om
$330.00
$100.
$3,300.00
$4.40
$145.20
$36.66
$1,259.78
$2.51
$82.83
$6.01
$198.33
$6.99
$230.67
122
DEM O SID EWALK
SF
498
$8.00
$3,984.00
$1.60
$796.80
$2.25
$1,095.60
$1.76
$876.48
$1.39
$692.22
$1.32
$657.36
$2.56
$1,274.88
123
REMOVE LIMEROCK BASE
SY
2,173
$6.00
$13,038.00
$0.CO
$0.00
$4.95
$10,756.35
$2.42
$5,258.66
$2.97
$6,453.81
$2.52
$5,475.96
$33.55
$72904.15
124
REMOVE OR AM END COMPACTED SU BGRADE
SY
2,173
$6.00
$13,038.00
$0.CO
$0.00
$3.60
$7,822.80
$1.77
$3,846.21
$3.18
$6,910.14
$2.52
$5,475.96
$28.05
$60,95265
125
HAUL/ DISPOSE
CY
482
$50.CO
$24,1 CO.00
$0.00
$5.00
$22CO
$10,604.00
$7.29
$3,513.78
$2.23
$1,074.86
$7.21
$3,475.22
$121.00
$58,322.00
126
REMOVE EXISTING. BACK FLOW PREVENTED
TLS
1
$1,000.00
$1,000.00
$1,000m
$1,000.00
$55000
$550.00
$550.00
$550.00
$724.75
$724.75
$425.79
$420.79
$698.50
$698.50
SUBTOTAL
$68,662.00
$21,517.04
$37,736.75
$28,065.31
$62,144.90
$20,749.30
$203,061.55
SPECIALTIES & SIGNAGE
ITEM
DESCRIPTOIN
UNIT
OTY.
FHP Tectonics Corp.
JRT Construction
West Construction
Bejar Construction
Lynx
E.L.C.I. Construction Group
AARYA Construction &
Design, Inc.
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
127
PARK DEDICATION PEDESTAL (INCLUDING
INSTALLATION OF OWNER SUPPLIED PLAQUE)
EA
1
$3000.00
$3,CO0.00
$5,589.00
$5,589.00
$6,600.00
$6,6CO.00
$1,650.CO
$1,650.CO
$1,672.50
$1,672.55
$1,803.37
$1,803.37
$1,100.CO
$1,100.00
128
PARK SIGN 6'X3
EA
1
$2000.00
$2000.00
$1,650.60
$1,655.60
$1,320.CO
$1,320.00
$1,100.00
$1, 100.E
$3,818.88
$3,818.88
$1,202.25
$1,252.25
$1,650.CO
$1,650.00
SUBTOTAL
$5,000.00
$7,239.60
$7,920.00
$2,750.00
$5,491.38
$3,005.62
$2,750.00
EQUIPMENT
AARYA Construction &
FHP Tectonics Corp.
JRT Construction
West Construction
Bejar Construction
Lynx
E.L.C.I. Construction Group
Design, Inc.
ITEM
DESCRIPTOIN
UNIT
QTY.
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
11
129
SS MINNOW WITH LABEL BY GAMETIME
EA
1
$11,238.00
$11,238.00
$13,093.79
$13,093.79
$10,835.00
$10,835.00
$9,836.00
$9,836.CO
$11,629.45
$11,629.45
$16,250.62
$16,250.62
$12,10OCO
$121 POOP
1330
NATURE DISCOVERY PLAY HOUSE BY GAMETIME
EA
1
$8,827.00
$8,827.00
$12,796.43
$12,796.43
$10,573.00
$10,573.00
$9,614.000
$9,614.CO
$9,842.11
$9,842.11
$15,989.48
$15,989.48
$11,825.CO
$11,825.00
131
PRIMETIMESWINGWITH STAINLESSSTEEL CHAINS
EA
1
$4,401.00
$4,401.00
$3,927.87
$3,927.87
$3,278.00
$3,278.00
$2,954.000
$2.954.CO
$3,569.12
$3,569.12
$8,199.01
$8,199.01
$2,706.CO
$2,706.00
BY GAMETIME
132
PRIM ETIM E SWING ADD -A BABY WITH STAINLESS
EA
1
$2.436.CO0
$2,436.00
$0.00
$0.00
$0.00
$5,006.000
$5006.CO
$2,716.14
$2,716.14
$6,035.28
$6,035.28
$947.10
$947.10
STEEL CHAINS BY GAMETIME
133
RED SPINNING MUSHROOM BY GAMETIME
EA
1
$3,503.CO0
$3,503.00
$5,378.77
$5,378.77
$4,444.00
$4,444.00
$4,048.000
$4,048.CO
$3,504.73
$3,504.73
$9,473.84
$9,473.84
$5,006.10
$5,006.10
134
ARCH SWING BY GAMETIME
EA
1
$6,186.CO0
$6,186.00
$7,792.48
$7,792.48
$6,438.CO
$6,438.00
$5,858.000
$5,858.CO
$6, 4.28
$6,004.28
$11,593.83
$11,593.83
$7,170.50
$7,170.90
135
CATTAILSPINNER BY GAMETIME
EA
1
$1,775.CO0
$1,775.00
$2,454.66
$2,454.66
$2,02CCO
$2,027.00
$1,848.000
$1,848.CO
$1,532.01
$1,532.01
$6,904.89
$6,504.89
$2,300.10
$2,300.10
136
GATOR WITH LABEL BY GAMETIME
EA
1
$6,400.CO0
$6,4CO.00
$8,896.60
$8,896.60
$7,352.00
$7,352.00
$6,683.000
$6,688.CO
$6,773.63
$6,773.63
$12,563.78
$12,563.78
$8,118.co
$8,118.00
137
COMPOSITE PLAYGROUND EQUIPMENT 2TO 5;
EA
1
$17,945.CO0
$17,945.00
$129,884.55
$129,884.55
$131,250.00
$131,250.00
$97,563.000
$97,563.CO
$19,116.68
$19,116.68
$61,797.04
$61,797.04
$49,500.CO
$49,500.00
RDU OPTION'BBY GAMETIME
183
COM POSITE P LAYGRON N D EQU I PM ENT S TO
EA
1
$88,858.CO0
$88,858.00
$0.00
$0.00
$0.00
$69,214.000
$69,214.CO
$96,846.67
$96,846.67
$61,797.04
$61,797.04
$80,388.00
$80,388.00
12 RDU OPTION'B' BY GAM ETIME
CHEST PRESS EXERCISE EQUIPMENT, MOUNTED
139
IN -GROUND, ADVANCED SERIES M OD EL 132711
EA
1
$7,245.CO0
$7,245.00
$5,783.60
$5,783.60
$5,113.00
$5,113.00
$4,648.000
$4,648.CO
$7,632.18
$7,632.18
$5,978.45
$5,978.45
$5,418.60
$5,418.60
BY GAM ETIM E
LAT -PULL DOWN EXERCISE EQUIPMENT,
140
MOUNTED IN -GROUND, ADVANCEDSERIES
EA
1
$8,223.CO0
$8,223.00
$5,802.69
$5,802.69
$5,130.00
$5,130.00
$4,664.000
$4,664.CO
$8,721.53
$8,721.53
$5,996.39
$5,996.39
$5,548.40
$5,548.40
MODEL 132721 BY GAMETIME
UPRIGHT CYCLE EXERCISE EQUIPMENT,
141
MOUNTED IN -GROUND, ADVANCEDSERIES
EA
1
$GI79.CO0
$4,179.00
$4,284.57
$4,284.57
$3,788.00
$3,783.00
$3,444.000
$3,444.CO
$4,213.59
$4,213.59
$4,569.14
$4,569.14
$3,999.60
$3,999.60
MODEL 132501 BY GAMETIME
SHOULDER ROTATOR EXERCISE EQUIPMENT,
142
MOUNTED IN -GROUND, ADVANCED SERIES
EA
1
$1,421.000
$1,421.00
$4,094.97
$4,094.97
$3,620.00
$3,620.00
$33CO.0C(D
$3,300.CO
$1,584.42
$1,584.42
$4,390.88
$4,390.83
$3,870.50
$3,870.90
MODEL 132991 BY GAMETIME
SIT-UP/ BACK EXTENSION EXERCISE EQUIPMENT,
143
MOUNTED IN -GROUND, ADVANCED SERIES
EA
1
$3,508. 0
$3,508.00
$4,433.46
$4,433.46
$3,920.00
$3,920.00
$3,564.0
$3,564:CO
$3,465.42
$3,465.42
$4,708.96
$4,708.96
$4,129.40
$4,129.40
MODEL 132491 BY GAM ETIME
1' PLYOMETRIC BOX STATION EXERCISE
144
EQUIPMENT, MOUNTED IN -GROUND,
EA
1
$321.000
$321.00
$814.41
$814.41
$720.00
$720.00
$660XCQ
$660:CO
$663.43
$663.43
$1,3,06.68
$1,306.68
$774.40
$774.40
ADVANCED SERIES M ODE 132761 BY
1.5' PLYOMETRIC BOX STATION EXERCISE
145
EQUIPMENT, MOUNTED IN -GROUND,
EA
1
$321.000
$321.00
$608.26
$683.26
$537.00
$537.00
$495.0
$495CO
$495.06
$495.06
$1,112.89
$1,112.89
$574.20
$574.20
ADVANCED SERIESMODEL 132771 BY
2' PLYOMETRIC BOX STATION EXERCISE
146
EQUIPMENT, MOUNTED IN -GROUND,
EA
1
$321. 0
$321.00
$638.80
$638.80
$563.00
$563.00
$517.000
$51 CCO
$520.71
$520.71
$1,141.58
$1,141.58
$606.10
$606.10
ADVANCED SERIES M ODE 132781 BY
ASSISTED STEP TRAINER EXERCISE EQUIPMENT,
147
MON NTED IN-GRON N D, ADVANCED SERIES
EA
1
$1,118.CO0
$1,118.00
$3,321.27
$3,321.27
$2,935.00
$2,935.00
$2,670.000
$2,670.CO
$1,246.57
$1,246.57
$3,663.50
$3,663.50
$3,096.50
$3,096.50
MODEL 1450711 BY GAM ETIME
CARDIO WALKER EXERCISE EQUIPMENT,
148
MOUNTED IN -GROUND, ADVANCED SERIES
EA
1
$GI78.CO0
$4,178.00
$4,854.66
$4,854.66
$4,291.00
$4,291.00
$3,901.000
$3,901.
$4,212.47
$4,212.47
$5,105.11
$5,105.11
$4,516.60
$4,516.60
MODEL 132451 BY GAMETIME
BALANCE BOARD STATION EXERCISE
149
EQUIPMENT, MOUNTED IN -GROUND,
EA
1
$1,386.CO0
$1,386.00
$881..86
$881.86
$778.00
$778.00
$715000
$715.CO
$719.18
$719.18
$1,370.09
$1,370.09
$832.70
$832.70
ADVANCED SERIES MODEL 132801 BY
CAPTAINS CHAIR EXERCISE EQUIPMENT,
150
MOUNTED IN-GROUND,ADVANCED SERIES
EA
1
$2596.000
$2596.00
$3,108.76
$3,108.76
$2499.00
$2499.00
$2502000
$250200
$2437.39
$2437.39
$3,463.71
$3,463.71
$2970.CO
$2970.00
MODEL 132511 by GAMETIME
PUSH -U P STATION -LOW EXERCISE EQUIPMENT,
151
MOUNTED IN-GROUND,ADVANCED SERIES
EA
1
$878.CO0
$878.00
$1,076.55
$1,076.55
$952.00
$952.00
$869XC0
$869.CO
$877.51
$877.51
$1,046.57
$1,046.57
$509.30
$509.30
MODEL 132951 BY GAMETIME
PUSH-UP STATION -HIGH EXERCISE EQUIPMENT,
152
MOUNTED IN -GROUND, ADVANCED SERIES
EA
1
$878.CO0
$878.00
$0.00
$0.00
$952.00
$952.00
$5,006.000
$5,006.CO
$877.51
$877.51
$1,046.57
$1,046.57
$509.30
$509.30
MODEL 132951 BY GAMETIME
CHIN-UPSTATION-LOW EXERCISE EQUIPMENT,
153
MOUNTED IN -GROUND, ADVANCED SERIES
EA
1
$920000
$924.00
$1,387.05
$1,387.05
$1,227.00
$1,227.00
$1,122.000
$1,122CO
$1,130.61
$1,130.61
$1,191.93
$1,191.93
$645.70
$645.70
MODEL 132851 BY GAMETIME
CHIN-UP STATION -HIGH EXERCISE EQUIPMENT,
154
MOUNTED IN -GROUND, ADVANCED SERIES
EA
1
$924.0
$924.00
$0.00
$0.00
$1,227.00
$1,227.00
$5,006.000
$5,006.CO
$1,130.61
$1,130.61
$1,149.35
$1,149.35
$645.70
$645.70
MODEL 132851 BY GAMETIME
155
SHADE STRUCTURE/CANOPY OVER
SE
6,006
$14.CO0
$84,084.00
$17.33
$104,083.98
$18.15
$109,008.90
$0.000
$114,51 OCO
$15.61
$93,753.66
$20.83
$125,104.98
$19.06
$114,474.36
PLAYGROUND
44.6
RlDl
;l lEET WR`�fEA�
k41;; B
M
E&
l
�. 00
�' 00
157
SHAD E STRUCTU RE/CANOPY OVER EXERCISE
SE
3,604
$10.000
$36,040.00
$18.22
$65,664.88
$18.15
$65,412.60
$0X00
$72,215.CO
$15.61
$56,258.44
$21.90
$78,927.60
$18.51
$66,710.04
AREA
4-19
c��PE11Q=^JS 2A€o w..-�,.8° €
k5
}
00
�' 00
AREA
159
COVERED BENCH CANOPIES
EA
2
$10,000.000
$20000.00
$10,270.92
$20,541.84
$19,360.CO
$33,720.00
$11,298.000
$22596.CO
$9,151.92
$18,303.84
$12348.28
$24,696.56
$11,297.CO
$22594.00
46Q
€A
2
$0.00
$L7.00
SUBTOTAL
$330,114.00
$415,606.76
$127,590.50
$465,033.00
$370,178.95
$486,575.75
$122,487.00
FURNISHINGS
AARYA Construction &
FHP Tectonics Corp.
JRT Construction
West Construction
Bejar Construction
Lynx
E.L.C.I. Construction Group
Design, Inc.
ITEM
DESCRIPTOIN
UNIT
OTY.
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
161
SCARBOROUGH 72" ALUMINIMUM BENCH BY
EA
16
$2000.00
$32000.00
$1,934.57
$30,953.12
$2000.00
$32000.00
$1,815.00
$29,040.00
$1,563.23
$25,011.63
$1,232.30
$19,716.80
$1,804.00
$28,864.00
LANDSCAPE FORMS WITH CUSTOM COLOR
KENSINGTON 35 GALLON LITTER RECEPTACLE BY
ULTRASITE; MODEL No. 41 -SD WITH TWO
162
OPENINGS. CITY OF AVENTURA LOGO ON BOTH
EA
11
$1,000.00
$11,C00.00
$1,297.55
$14,273.05
$1,650.00
$18,150.00
$990.60
$10,890.00
$1,170.75
$12878.25
$1,262.36
$13,885.96
$1,023.00
$11,253.00
SIDES OF 050 SURFACE SILK SCREEN WITH
EPDXY INKS (FOUR COLOR LOGO WITH FADE)
163
BICYCLEGAM ETIME; MODEL No. 7700
EA
2
$300.00
$600.00
$606.00
$1,212.00
$495.00
$9507.00
$1,320.00
$264000
$293.25
$586.50
$316.19
$632.33
$356.40
$712.80
23/8A.D.GALVANIZED; CUSTOM COLOR
" GALV
SUBTOTAL
$43,600.001
$46,438.17
1
$51,140.00
$42,570.00
$38,476.43
$34,235.141
$40,829.80
1
ELECTRICAL ITEMS
AARYA Construction &
FHP Tectonics Corp.
JRT Construction
West Construction
Bejar Construction
Lynx
E.L.C.I. Construction Group
ITEM
DESCRIPTOIN
UNIT
OTY.
Design, Inc.
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
164
SITE ELECTRICAL GENERAL CONDITIONS
LS
1
$10,000.00
$10,000.00
$1,240.00
$1,240.00
$99,09500
$99,095.00
$1,364.00
$1,364.00
$0.00
$0.00
$36,734.66
$36,734.66
$20,713.00
$20,713.00
165
HAND HOLES, P/C CONC OGX3
EA
2
$686.00
$1,372.00
$686.00
$1,372.00
$0.00
$0.00
$755.00
$1,510.00
$1,951.25
$3,502.50
$6601.12
$1,202.24
$2143.50
$4,287.80
166
CON DUIT/CABLE/GROU ND FOR SITE
LF
2,520
$8.00
$20,160.00
$7.64
$19,252.80
$0.00
$0.00
$8.42
$21,218.40
$12.96
$32659.20
$6.01
$15,145.20
$5.50
$13,8610.00
ELECTRICAL
167
WP DUELED RECEPTACLE
EA
2
$696.00
$1,392.00
$696.00
$1,392.00
$O.CO
$0.00
$766.00
$1,53200
$1,951.25
$3,502.50
$300.56
$6601.12d$5,637.50
$195.80
168
J BOX
EA
4
$324.00
$1,296.00
$324.00
$1,296.00
$0.00
$0.00
$356.00
$1,424.00
$0.00
$O.CO
$240.45
$961.80
$281.60
169
PANEL A200A.120/240V3P/4W, MCB, N3R
LS
1
$1,542.00
$1,542.00
$1,542CO
$1,542.00
$0.1
$0.00
$1,696.00
$1,696.CO
$4,181.25
$4,181.25
$2404.49
$2404.49
$1,727.00
170
POST LIGHT,POLE MOUNTED INCLUDING WP
EA
8
$4,616.00
$36,928.00
$4,366.00
$34,928.00
$0.00
$0.00
$4,80200
$38,416.00
$5387.20
$47,097.660
$4,208.99
$38,471.92
$45,100.00
DUPLEX RECEPTACLE
171
POST MOUNTED FIXTURE (AT EXERCISE)
EA
6
$1,41 000
$8,4660.00
$1,41000
$8,4660.00
$0.00
$0.00
$1,551.00
$9,306.00
$0.00
$0.00
$6601.12
$3,606.72
$990.60
$5,940.00
172
UNI -STRUT FRAME
EA
1
$3,636.00
$3,636.00
$2363.00
$2363.00
$O.CO
$0.00
$2600.00
$2600.CO
$669.00
$669.CO
$2404.49
$2404.49
$5,390.CO
$5,390.00
173
METER
EA
1
$1,896.00
$1,896.00
$1,896.00
$1,896.00
$0.00
$0.00
$2086.CO
$2086.CO
$836.25
$836.25
$601.12
$601.12
$271.70
$271.70
174
SIX POLE 60A CONTRACTOR
LS
1
$1,110.60
$1,110.00
$1,110.60
$1,110.00
$O.CO
$0.00
$1,221.00
$1,221.00
$4,348.50
$4,348.50
$721.35
$721.35
$3,532.10
$3,532.10
175
LIGHT CLOCK
EA
2
$742.00
$1,484.00
$742.00
$1,484.00
$0.00
$0.00
$816.00
$1,63200
$1,661.35
$3,322.70
$480.90
$961.80
$319.00
$638.00
176
TIME CLOCK
EA
1
$646.00
$646.00
$646.00
$646.00
$O.CO
$0.00
$710.00
$710.00
$1,282.25
$1,282.25
$480.90
$480.50
$316.80
$316.80
SUBTOTAL
$89,922.00
$76,981.80
$99,095.00
$84,715.40
$102,201.75
$104,297.81
$102,253.80
EARTHWORK ITEMS
AARYA Construction &
FHP Tectonics Corp.
JRT Construction
West Construction
Bejar Construction
Lynx
E.L.C.I. Construction Group
Design, Inc.
ITEM
D.
UNIT
OTY.
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
177
FILL/COMPACGGRADE AT AREAOF REMOVED
CY
453
$75.00
$33,975.00
$75.77
$34,323.81
$22.00
$9,966.00
$12CO
$5,436.CO
$32.34
$14,650.02
$19.24
$8,715.72
$103.40
$46,840.20
ROAD BASE
178
2.5 BERM/GRADING
CY
341
$30.00
$10,230.00
$9.93
$3,386.13
$22.00
$7,502.00
$4.95
$1,637.95
$24.53
$8,364.73
$3.61
$1,231.01
$88.00
$30,008.00
179
1.5 BERM/GRADING
CY
149
$30.00
$4,470.00
$9.93
$1,479.57
$22.00
$3,278.00
$11.33
$1,688.17
$20.07
$2990.43
$3.61
$537.89
$88.00
$13,112.00
180
FINE GRADE (LANDSCAPE AREA)
SF
19,970
$0.20
$3,994.00
$0.25
$3,994.00
$0.11
$2196.70
$1.36
$27,159.25
$0.00
$0.00
$0.24
$4,792.80
$1.10
$21,967.00
181
FINE GRADE (OVAL OPEN FAWN/PLAY LAWN)
SF
14,517
$5.20
$25073.40
$0.25
$2903.40
$0.11
$1,596.87
$1.88
$27,291.96
$5.00
$0.00
$5.24
$3,484.08
$0.22
$3,193.74
SUBTOTAL
$55,572.40
$46,086.91
$24,539.57
$63,263.28
$26,005.18
$18,761.50
$115,120.94
EXTERIOR IMPROVEMENTS
AARYA Construction &
FHP Tectonics Corp.
JRT Construction
West Construction
Bejar Construction
Lynx
E.L.C.I. Construction Group
Design, Inc.
ITEM
DESCRIPTOIN
UNIT
QTY.
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
CHILLED DRINKING FOUNTAIN W/ BOTTLE FILLER
182
INCLUDING DRYWALL BY MOST DEPENDABLE
EA
2
$3,755.00
$7,550.00
$5,411.50
$10,823.00
$10,000.00
$20,000.00
$5,401.00
$10,802CO
$3,6073.68
$7,207.36
$11,502.24
$23,804.48
$4,400.CCI
$8,800.00
FOUNTAINS MODEL No. 10135SMSS
183
1/2" FINISH LAYER POURED IN PLACE
SF
6,255
$15.00
$93,755.00
$11.80
$73,755.00
$4.62
$28,875.00
$2.25
$13,750:CO
$15.77
$98,562.50
$13.59
$84,937.50
$4.91
$:0,687.50
184
PLAYGROUNDS" IMPACT LAYER POURED IN
SF
6,527
$1.00
$6,520.00
$0.00
$5.00
$8.80
$57,376.00
$14.85
$96,822CO
$0.00
$0.00
$4.52
$29,470.40
$13.81
$50,041.20
PLACE
185
8" COMPACTED #57 STONE BASE
SF
6,872
$1.55
$10,651.60
$1.11
$7,627.92
$2.27
$15,118.40
$1.25
$8,246.40
$1.39
$9,552.08
$1.20
$8,246.40
$1.43
$9,826.96
186
8" COMPACTED SUBGRADE
SY
777
$1.55
$1,165.50
$0.CO
$0.00
$2.27
$1,709.40
$0.91
$707.07
$11.04
$8,578.08
$13.22
$10,271.94
$2.59
$2,012.43
187
4" PERFORATED PVC PIPE
LF
295
$12CO
$3,540.00
$22C0
$6,490.00
$1 i m
$3,245.00
$11.18
$3,298.10
$13.66
$4,029.70
$24.04
$7,091.80
$31.50
$9,410.50
188
4" NON -PERFORATED PVC PIPE
LF
43
$12CO
$516.00
$20.CO
$860.00
$11.Co
$473.00
$37.00
$1,591.00
$12.54
$539.22
$24.04
$1,033.72
$26.40
$1,135.20
189
1/2" FINISH LAYER POURED IN PLACE
SF
29CO
$12.50
$36,255.00
$11.21
$32509.00
$4.62
$13,398.00
$2.27
$6,380.CO
$13.60
$39,440.00
$11.51
$33,379.00
$4.85
$14,065.00
1A7
PLAYGROUNDI I/2"" IMPACT LAYER POURED
SF
29CO
$1.00
$25070.00
$0.00
$5.00
$8.80
$25,527.00
$13.42
$38,918.CO
$0.00
$0.00
$3.84
$11,136.
$11.77
$34,133.00
N PLACE
191
8"COMPACTED #57STONE BASE
SF
3,188
$1.55
$4,941.40
$1.11
$3,538.68
$2.25
$7,013.60
$2.58
$8,225.04
$1.51
$4,813.88
$1.20
$3825.60
$1.43
$4,558.84
192
8" COMPACTED SUBGRADE
SY
361
$1.55
$541.50
$0.00
$0.00
$2.25
$794.20
$1.98
$714.78
$20.07
$7,245.27
$13.22
$4,772.42
$2.58
$931.38
193
4" PERFORATED PVC PIPE
LF
190
$12CO
$2280.00
$22CF)
$4,180.00
$11.CO
$2090.00
$17.36
$3,298.40
$3.62
$647.80
$24.04
$4,567.60
$31.50
$6,061.00
194
4" NON -PERFORATED PVC PIPE
LF
40
$12CO
$480.00
$20.00
$800.00
$11.00
$440.00
$39.71
$1,588.40
$2.73
$109.25
$24.04
$961.60
$26.40
$1,056.00
195
BITUMINOUS PRIME COAT
GL
44
$5.00
$225.00
$11.36
$499.84
$242CO
$10,648.00
$1.10
$48.40
$39.03
$1,717.32
$54.10
$2380.40
$19.80
$871.20
196
TACK COAT
GL
22
$5.CO
$110.00
$18.18
$399.96
$242CO
$5,324.00
$1.10
$24.25
$27.88
$613.36
$42.08
$925.76
$22.00
$484.00
197
1-1/2"ASHALT/TON
TN
41
$4CO.00
$16,400.00
$175.61
$7,2CO.01
$198.00
$8,118.00
$209.CO
$8,569.CO
$23.42
$960.22
$198.37
$8,133.17
$170.55
$6,990.50
198
6"LIMEROCK BASE@ASPHALT
SY
483
$6.CO
$2898.00
$9.11
$4,400.13
$13.25
$6,375.60
$13.80
$6,665.40
$17.84
$8,616.72
$12.02
$5,805.66
$8.36
$4,037.88
199
8" STABILIZED SUBGRADE@ASPHALT
SY
483
$1.50
$724.50
$0.00
$0.00
$6.60
$3,187.80
$35.70
$17,243.10
$23.42
$11,311.86
$4.81
$2323.23
$2.59
$1,250.97
2CO
4" THICK. CONCRETE SIDEWALK/PAVING
SF
3,065
$6.CO
$18,350.00
$4.86
$14,895.90
$5.55
$16,857.50
$1.15
$3,524.75
$2.95
$9,041.75
$3.97
$12168.05
$4.29
$13,148.85
201
4"LIMEROCK BASE@CONC.SIDEWALK
SY
409
$6.CO
$2454.00
$0.00
$0.00
$8.80
$3,599.25
$8.80
$3,599.20
$23.58
$9,644.22
$10.52
$4,302.68
$8.36
$3,419.24
202
12" STABILIZED SUBGRADE@CONC.SIDEWALK
SY
409
$1.55
$613.50
$0.00
$0.00
$6.60
$2699.40
$4.03
$1,648.27
$35.68
$14,593.12
$4.81
$1,967.29
$2.59
$1,059.31
203
6" THICK CONCRETE SIDEWALK/PAVING
SF
337
$CCO
$2359.00
$0.00
$0.00
$6.60
$2224.20
$7.70
$2594.50
$4.74
$1,597.38
$4.45
$1,499.65
$9.07
$3,056.59
204
4"LIMEROCK BASE@CONC.SIDEWALK
SY
18$6.CO
$108.00
$0.00
$0.00
$8.80
$158.40
$36.66
$659.88
$15.61
$280.98
$10.52
$189.36
$8.36
$150.48
205
12 "STABILIZED SUBGRADE@GONG. SIDEWALK
SY
18
$1.5J
$27.00
$0.CO
$0.00
$6.60
$118.80
$61.10
$1,099.&7
$35.68
$64224
$4.81
$86.58
$2.59
$46.62
206
1/2 THICK PREMOLDED EXPANSION JOINT
LF
276
$1.00
$276.00
$5.00
$1,380.00
$5.50
$1,518.00
$1.18
$325.68
$1.51
$416.76
$1.20
$331.25
$38.50
$10,626.00
W/RECESSED (1/2") EPDXY SEALANT ON TOP
207
4" WIDE SMOOTH TROWEL FINISH
SF
3,202
$1.00
$3,252.00
$0.60
$1,921.20
$1.10
$3,522.20
$1.10
$3,522.25
$6.97
$22317.94
$0.42
$1,344.84
$1.65
$5,283.30
W/CONTINUOUS PICTURE FRAME EFFECT
2C6
12"X12" REINFORCED RIBBON CURB
LF
528
$20.CO
$10,5610.00
$15.55
$8,184.00
$2200
$11,616.00
$17.60
$9,292.80
$23.42
$12365.76
$21.64
$11,425.92
$15.87
$8,379.36
209
24"WIDE X I2" THICK CONT. LIMEROCK BASE@
SY
141
$6.00
$846.00
$10.64
$1,5@0.24
$22.00
$3,10200
$11.69
$1,648.29
$7.81
$1,101.21
$18.03
$2542.23
$8.36
$1,178.76
CONC. CURB
210
24 WIRED I2" THICK STABILIZED SUBGRADE
SY
141
$1.50
$211.50
$0.00
$5.00
$22.00
$3,102.00
$11.69
$1,648.29
$6.69
$943.29
$18.03
$2542.23
$2.59
$365.19
BASE @ CONC. CURB
211
NEW FCURB%GUTTER
LF
50
$20.00
$1,0c0X0
$35.20
$1,7610.00
$2200
$I'Ic0X0
$55.00
$2750.CO
$20.07
$1,CO3.55
$30.06
$1,553.00
$31.79
$1,589.50
212
NEW VALLEY GUTTER
LF
33
$25.00
$660.00
$27.27
$899.91
$22.00
$726.00
$83.33
$2749.89
$23.42
$772.86
$27.65
$912.45
$31.79
$1,049.07
213
6HIGH ALUMINUM PERIMETER SECURITY
LF
916
$55.00
$50,380.00
$56.97
$52184.52
$62.00
$56,792.00
$60.63
$55,537.08
$61.33
$56,178.28
$58.31
$53,411.96
$60.50
$55,418.00
FENCING (POWDER COATED)
214
4' HIGH ALUMINUM SECURITY FENCING
LF
172
$42.00
$7,224.00
$42.97
$7,3507.84
$46.00
$7,912.00
$45.74
$7,867.28
$45.72
$7,863.84
$50.79
$8,735.88
$46.20
$7,946.40
PLAYGROUND (POWDER COATED)
215
ALUMINUM GATE 4 FT HIGH (POWDER COATED)
EA
1
$550.00
$555.00
$568.00
$568.00
$605.00
$605.00
$605.00
$605.00
$613.25
$613.25
$1,009.89
$1,C09.89
$605.00
$605.00
216
ALUMINUM GATE 6 FT HIGH (POWDER COATED)
EA
3
$630.00
$1,8507.00
$651.00
$1,953.00
$693.00
$2079.00
$693.00
$2079.00
$702.45
$2107.35
$1,033.93
$3,101.79
$693.co
$2079.00
217
VEHICULAR SLIDING GATE I2FTWIDEX6FT
EA
1
$3,9@0.00
$3,900.00
$2790.00
$27507.00
$2970.00
$2970.00
$2970.CO
$2970.CO
$3,010.50
$3,010.55
$4,748.88
$4,748.88
$2970.CO
$2970.00
HIGH (INCLUDING TRACK); ALUMINUM
2" POTABLE WATER METER SERVICE
218
CONNECTION, AND SERVICE LINE (ADDENDA
EA
2
$11,0@0.00
$22@00.00
$5,300.00
$10,6@0.00
$2750.00
$5,5@0.00
$3,850.00
$7,700.00
$418.13
$836.26
$3C05.62
$6,011.24
$3,228.50
$6,457.00
No. 1)
219
2" BACKFLOW PREVENTED AND PIPE ASSEMBLY
EA
2
$8co.00
$1,6100.00
$3,500.00
$7,0@0.00
$3,850.00
$7,7@0.00
$1,100.60
$2200.CO
$975.63
$1,951.26
$1,216.67
$2433.34
$1,248.50
$2497.00
PER LOCAL CODE
225
COPPER GROUNDING PLATE AT CONTROLLER
EA
1
$50000
$5@0.00
$150.CO
$150.00
$440.CO
$440.00
$550.00
$550.00
$446.00
$446.00
$120.22
$120.22
$550.CO
$550.00
ESPLXMSM4 4 -STATION MODULE AN D LXM M
METAL CABINET, LIMTKIT RADIO KIT,
221
GROUNDING PACKAGE AND RAIN BIRD RSD-
EA
1
$21 C0.00
$2100.00
$500.00
$5@0.00
$962.50
$962.50
$3,850.00
$3,850.60
$975.63
$975.63
$3,181.15
$3,181.15
$2613.60
$2613.60
BEx RAIN SENSOR, PROVIDE CONNECTION &
MATERIALS NECESSARY FOR CONTROLLER
222
RAIN BIRD 1804 -PRS SPRINKLER WITH SPX FLEX@
EA
132
$8.50
$1,122.00
$20.00
$2640.00
$42.90
$5,662.80
$27.55
$3,630.00
$43.49
$5,740.68
$16.83
$2221.56
$13.20
$1,742.40
3' LONG
223
RAIN BIRD 1806 -PRS SPRINKLER WITH SPX FLEX@
EA
254
$10.00
$2540.00
$30.00
$7,625.00
$46.20
$11,734.80
$33.00
$8,382@0
$46.83
$11,894.82
$27.05
$6,870.70
$30.80
$7,823.20
3' LONG
224
RAIN BIRD 1812 -PRS SPRINKLER WITH SPX FLEX@
EA
80
$13.00
$1,040.00
$40.00
$32C0.00
$49.50
$3,9610.00
$38.55
$3,080.00
$50.18
$4,014.40
$31.86
$2548.80
$44.00
$3,525.00
3' LONG
225
RAIN BIRD 1401 PC FLOOD BUBBLER W/ 1/2" K-
EA
214
$10.00
$2140.00
$20.00
$4,280.00
$33.00
$7,062.00
$27.55
$$885.00
$33.45
$7,158.30
$11.72
$2558.08
$13.20
$2,824.80
FLEX PIPE @ 8' LONG
226
RAIN BIRD 5006 -PC -PL WITH MPR NOZZLEAND
EA
44
$25.00
$880.00
$40.00
$1,7610.00
$55.CO
$2425.00
$38.50
$1,694.CO
$55.75
$2453.00
$43.58
$1,917.52
$55.co
$2420.00
3/4" K -FLEX @ 3' LONG
227
RAIN BIRD 5006 -FC -PL WITH MPR NOZZLEAND
EA
1 9
$25.00
$180.00
$40.00
$3610.00
$55.CO
$495.00
$38.50
$346.55
$55.75
$551.75
$43.58
$392.22
$55.00
$495.00
3/4" K -FLEX @ 3' LONG
228
1" RAN BIRD IC(TPEB ELECTRIC CONTROL
VALVE WITH VALVE BOX
EA
3
$225.00
$675.00
$75.00
$225.00
$275.00
$825.00
$275.CO
$825.CO
$278.75
$836.25
$218.81
$656.43
$165.00
$495.00
229
1 1/2" RAN BIRD 150-PEB ELECTRIC CONTROL
VALVE WITH VALVE BOX
EA
10
$250.00
$2500.00
$200.00
$2060.00
$385.00
$3,850.00
$330.00
$3,300.CO
$390.25
$3,902.50
$289.74
$2897.40
$275.00
$2750.30
230
2" RAN BIRD 2CO-PEB ELECTRIC CONTROL
VALVE WITH VALVE BOX
EA
1
$325.00
$325.00
$230.00
$230.00
$440.00
$440.00
$335.00
$385.CO
$446.00
$446.CO
$354.66
$354.66
$330.00
$330.00
231
21/2" PVC CL 200 MAINLINE, SOLVENT WELD
LF
15
$5.00
$75.00
$3.CO
$45.00
$1.70
$25.50
$11.00
$165.COI
$1.73
$25.95
$6.01
$90.15
$3.85
$57.75
232
2" PVC CL200 MAINLINE, SOLVENT WELD
LF
640
$4.00
$2560.00
$1.50
$960.00
$1.20
$763.00
$4.40
$2816.60
$1.19
$761.60
$4.81
$3,078.40
$2.75
$1,760.00
233
21/2" PVC CL 200 LATERAL LINE, SOLVENT WELD
LF
20
$3.75
$75.00
$3.00
$60.00
$0.95
$19.00
$3.85
$7CC0
$0.96
$19.20
$2.52
$50.40
$2.20
$44.00
234
2" PVC CL 200 LATERAL LINE, SOLVENT WELD
LF
155
$3.00
$465.00
$2.00
$310.00
$0.50
$139.50
$3.30
$511.50
$0.89
$137.95
$1.86
$288.30
$1.65
$255.75
235
11/2"PAC CL. 200 LATERAL LINE, SOLVENT WELD
LF
255
$2.50
$637.50
$1.00
$255.00
$0.56
$142.80
$3.G3
$772.65
$0.57
$145.35
$1.20
$:06.00
$0.88
$224.40
236
11/4"PAC CL. 200 LATERAL LINE, SOLVENT WELD
LF
825
$2.50
$2062.50
$1.00
$825.00
$0.44
$363.00
$2.92
$2409.60
$0.45
$371.25
$0.96
$792.00
$0.77
$635.25
237
1" PVC CL 200 LATERAL LINE, SOLVENT WELD
LF
1,025
$2.25
$2306.25
$1.00
$1,025.00
$0.20
$205.00
$2.75
$2818.75
$0.22
$225.50
$0.82
$840.50
$0.66
$676.50
238
3/4" PVC CL 200 LATERAL LINE, SOLVENT WELD
LF
4,5CO
$2.25
$10,125.00
$0.60
$2760.00
$0.17
$742.50
$2.70
$1215OCO
$0.22
$990.00
$0.52
$2340.00
$0.55
$2475.00
239
6" SCH EDULE 40 PVC SLEEVE
LF
15
$10.00
$150.00
$10.00
$150.00
$6.15
$92.25
$11.CO
$165.CO
$6.22
$93.30
$10.52
$157.80
$11.00
$165.00
240
4" SCH EDULE 40 PVC SLEEVE
LF
105
$8.00
$840.00
$4.00
$420.00
$3.41
$358.05
$6.60
$693.CO
$3.46
$363.30
$5.77
$605.85
$6.60
$693.00
241
2" SCH EDULE 40 PVC SLEEVE
LF
30
$4.00
$120.00
$2.00
$60.00
$1.10
$33.00
$5.50
$165.CO
$1.12
$33.60
$2.04
$61.20
$3.30
$99.00
242
14-1 GAUGE CONTROL WIRE WITH
WATERPROOF CONNECTORS
LF
4,515
$0.40
$1,806.00
$0.25
$1,128.75
$0.14
$632.10
$0.28
$1,264.20
$0.17
$767.55
$0.30
$1,354.50
$0.33
$1,489.95
243
14-1 GAUGE COMMON WIRE WITH
WATERPROOF CONNECTORS
LF
785
$0.40
$314.00
$0.25
$196.25
$0.14
$109.90
$0.28
$219.80
$0.17
$133.45
$0.30
$235.50
$0.33
$259.05
SUBTOTAL
$355,177.75
$297,206.15
$385,090.40
$397,068.00
$393,703.65
$397,204.48
$388,076.88
ITEM
DESCRIPTOIN
IL
UNIT
OTY.
FHP Tectonics Corp.
JRT Construction
West Construction
Bejar Construction
By
E.L.C.I. Construction Group
AARYA Construction &
Design, Inc.
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
244
SATIN LEAF; 12X4;3 CALIPER
EA
14
$386.00
$5,404.00
$300.00
$4,2CO.00
$401,50
$5,621.00
$437.CO
$6,118.CO
$390.25
$5,463.50
$432.82
$6,059.48
$401.50
$5,621.00
245
WHITE PLUMERIA 10 X 10'; 3"CALIPER
EA
16
$536.00
$8,576.00
$50OCO
$8,000.00
$655.CO
$10,480.00
$580m
$9,280.CO
$1,67250
$26,760.00
$715.34
$11,445.44
$654.50
$10,472.00
246
MAHOGANY; 25 X 12'; 8" CALIPER
EA
18
$2,556.00
$46,008.00
$3,000.00
$54,003.00
$3,162.50
$56,925.00
$2184.60
$39,312
$3,345.00
$60,210.00
$3,456.46
$62216.28
$3,162.50
$56,925.00
247
STAKING :4"x4" PRESSURE TREATED LUMBER
EA
48
$10.00
$480.00
$10.00
$480.00
$13.15
$631.20
$99.00
$4,752CO
$0.00
$0.00
$14.37
$689.76
$13.15
$631.20
248
MONTGOMERY PALM; 16' OVERALL HEIGHT
EA
15
$341.00
$5,115.00
$275.00
$4,125.00
$468.00
$7,020.00
$438.CO
$6,570.CO
$696.88
$10,453.20
$510.95
$7,664.25
$467.50
$7,012.50
249
MONTGOMERY PALM; 20' OVERALL HEIGHT
EA
13
$361.00
$4,693.00
$270.00
$3,510.00
$523.00
$6,799.00
$550.00
$7,150 CO
$864.13
$11,233.69
$571.07
$7,423.91
$522.50
$6,792.50
250
MONTGOMERY PALM; 24' OVERALL HEIGHT
EA
6
$426.00
$2556.00
$327.50
$1,965.00
$605.00
$3,630.00
$648�FO$3,888.CO
$1,059.25
$6,355.50
$661.24
$3,967.44
$605.
$3,630.00
251
TRI FILE COLON UT PALM; 30' OVERALL H EIGHT;
MATCHED
EA
15
$2841.00
$42615.00
$2560.00
$37,5CO.00
$4,345.00
$65,175.00
$4,93774,055.CO
$2508.75
$37,631.25
$4,748.88
$71,233.20
$4,345.CO
$65,175.00
252
STAKING :2"X4" PRESSURE TREATED LUMBER
EA
49
$8.00
$392.00
$10.00
$490.00
$6.45
$316.05
$99.00
$4,851.00
$0.00
$0.00
$7.03
$344.47
$6.44
$315.56
253
YELLOW NECKLACE POD; 18"X24'; FU LL TO
EA
243
$11.00
$2673.00
$7.48
$1,817.64
$11.55
$2806.65
$10.78
$2619.54
$8.08
$1,963.44
$12.62
$3,066.66
$11.55
$2806.65
GROUND
254
SM ALL LEAF PITCH APP LE; 6 X 3'; FU LL TO TH E
EA
93
$146.00
$13,578.00
$80.00
$7;440.00
$181.50
$16,879.50
$162CO
$15,066.00
$139.38
$12962.34
$198.37
$18,448.41
$181.50
$16,879.50
GROUND
255
STAKING:8'X3" DIAM FLEE P RESSU RE TREATED
EA
332
$4.00
$1,328.00
$7.50
$24507.00
$12.00
$3,984.00
$99.00
$32868.00
$0.00
$0.00
$13.16
$4,369.12
$12.05
$GEG0.60
LODGE POLES (2 PER 6' PITCH APPLE)
256
ASIATIC JASMINE; 12"X 18'; FULL
EA
1,173
$10.00
$11,730.00
$6.00
$7,038.00
$6.35
$7,448.55
$9.35
$10,967.55
$9.48
$11,120.04
$6.31
$7,401.63
$5.78
$6,779.94
257
KANGAROO PAW FERN; 18"x18";FULL
EA
702
$6.00
$4,212.00
$8.00
$5,616.00
$12.65
$8,880.30
$14.08
$9,884.16
$16.73
$11,744.46
$13.83
$9,708.66
$12.65
$8,880.30
253
BERMU DA (Cynodon dodylon'Tlfway 419)
SF
14,300
$1.25
$17,875.00
$0.67
$9,581.00
$3.28
$46,904.00
$0.70
$10,010.
$1.34
$1 A162FC0
$3.58
$51,194.00
$1.76
$25,168.00
SOLID SOD
259
ST. AUGUSTI N E (Stenotaphrum secUndatum
SF
22,523
$0.85
$19,142.00
$0.38
$8,557.60
$2.92
$65,758.40
$0.46
$10,359.20
$0.45
$10,13000
$3.19
$71,838.80
$1.43
$32203.60
Palmetto') SOLID SOD
260
ROYAL. PALM; 35 OVERALL HEIGHT
EA
8
$2275.00
$18,200.00
$150.00
$1,200.00
$1,375.00
$11,000.00
$2,915.00
$23,320.00
$1,115.00
$8,920.00
$1,502.81
$12022.48
$1,375.00
$11,000.00
261
STAKING.4"X4" PRESSURE TREATED. LUMBER
EA
8
$10.00
$80.00
$10.00
$80.00
$13.15
$105.20
$99.00
$79200
$0.00
$0.00
$14.37
$114.96
$13.15
$105.20
262
MULCH AT LANDSCAPE AREAS
SY
2,219
$2.00
$4,438.00
$0.95
$2108.05
$1.76
$3,905.44
$4.50
$9,985.50
$0.76
$1,686.44
$1.94
$4,304.86
$1.76
$3,905.44
L2.LANDSCAPE
MAINTENANCE
WKS
26
$440.00
$11,440.00
$300.00
$7,800.00
$660.00
$17,160.00
$193.00
$$018.00
$669.00
$17,394.00
$721.35
$18,755.10
$660.00
$17,160.00
SUBTOTAL
$220,535.00
$167,998.29
$341,429.29
$286,865.95
$253,193.86
$372,268.91
$285,463.99
MISCELLANEOUS
ITEM
DESCRIPTOIN
UNIT
OTY.
FHP Tectonics Corp.
JRT Construction
West Construction
Bejar Construction
Lynx
E.L.C.I. Construction Group
AARYA Construction &
Design, Inc.
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
UNIT PRICE
TOTAL
264
18 "HDPE PIPE
LF
470
$85.00
$39,955.00
$64.75
$30,432.50
$43.10
$25,257.00
$82.50
$38,775.CO
$40.14
$18,865.80
$42.08
$19,777.60
$36.91
$17,347.70
265
15 "HDPE PIPE
LF
335
$75.00
$25,125.00
$55.15
$18,475.25
$41.80
$14,003.00
$49.50
$16,582.55
$37.91
$12699.85
$36.07
$12083.45
$18.26
$6,117.10
266
DEWATERING ALLOWANCE
LS
1
$4,000.00
$4,000.00
$2000.00
$2000.00
$5,500001
$5,5CO.00
$3,300.00
$3,300.00
$11,150.00
$11,150.CO
$1,803.37
$1,803.37
$I 1,000.CO
$11,000.00
267
24" DIA DRAINAGE WELL (ALLOWANCE)
ALW
1
$29,000.00
$29,000.00
$32800.CO
$328CO.00
$31,900.CO
$31,9CO.00
$22CO0.00
$22000.CO
$46,830.00
$46,830.00
$42078.64
$42078.64
$2750.CO
$2755.00
268
DRAINAGE WELL STRUCTURE 13'X8.5'X8
EA
1
$15,500.00
$15,5CO.00
$13,000.00
$13000.00
$10,450.00
$10,455.00
$16,500.CO
$16,500.CO
$33,282.75
$33,282.75
$10,519.66
$10,519.66
$7,504.25
$7,504.20
269
STORM M.H./C.B/INLET
0
$1.00
$0.00
$0.00
$5.00
$0.00
$5.00
$5,550.00
$0.00
$4,292.75
$0.00
$1,000.00
$0.00
$1,650.CO
$5.00
270
DEWATER ALLOWANCE
LS
1
$3,000.00
$3,000.00
$2000.
$2000.00
$0.CO
$0.00
$3,300.00
$3,300.00
$11,150.00
$11,150FC01
$601.12
$651.12
$4,400.CO
$4,400.00
271
CATCH BASIN (IG)
EA
5
$4,250.00
$21,255.00
$4,000.00
$20,000.00
$4,125.CO
$25,625.00
$3,300.00
$16500.CO
$3,328.28
$16,641.40
$3,306.18
$16,530.90
$3,480.40
$17,402.00
272
YARD DRAIN (A C)
EA
3
$2000.CO
$6,000.00
$4,166.67
$12500.01
$605.CO
$1,815.00
$1,833.00
$5,499.CO
$2174.25
$6,522.75
$1,803.37
$5,410.11
$1,281.55
$3,844.50
273
1"WATERSERVICE
LF
280
$25.00
$5,6CO.00
$24.64
$6,899.20
$16.50
$4,625.00
$22CO
$6,16000
$37.91
$10,614.80
$18.03
$5,048.40
$308.CO
$86,240.00
274
MANIFOLD
EA
1
$5CO.00
$550.00
$2CO.00
$2CO.00
$1,650.00
$1,655.00
$330.00
$33000
$7,297.68
$7,297.68
$:00.56
$300.56
$22CO.00
$2200.00
275
1" RPZ BACKFLOW PREVENTED
EA
1
$75000
$755.00
$0.CO
$0.00
$825.CO
$825.00
$2750.00
$2750.CO
$14,327.75
$14,327.75
$1,55281
$1,55281
$1,248.55
$1,248.50
276
1"IRRIGATION PRESSURE VACUUM BREAKER
EA
1
$50OCO
$5CO.00
$50OCO
$500.00
$:00.00
$300.00
$1,100.00
$1, 100.00
$8,028.00
$8,028.00
$1,021.91
$1,021.91
$1,248.55
$1,248.50
277
NORTH MIAMI BEACH IMPACT FEES
AL
1
$15,133.94
$15,133.94
$ 15,133.94
$15,133.94
$ 15,133.94
$15,133.94
$15,133.94
$15,133.94
$15,133.94
$15,133.94
$15,133.94
$15,133.94
$15,133.94
$15,133.94
278
EXCAVATION OF UNSUITABLESOILS AND
REPLACEMENT WITH SELECT FILL
LS
1
$20CQ.00
$2 0.00$
126,671.00
$126,671.00
$66C()0.CQ
$66,000.CO
$169,480.00
$169,480.CO
$474.59
$83,580.21
$203,500.CO
$203,500.00
SUBTOTAL
$168,308.94
$280,611.90
$127,078.94
$213,930.44
$382,024.72
$215,392.68
$379,936.44
TOTAL BID AMOUNT
$1,579,715.00
$1,607,854.62
$1,630,500.45
$1,697,606.38
$1,816,068.38
$1,845,497.93
$2,149,970.40
57. CONTINGENCY
$78,985.75
$80,392.73
$81,525.02
$84,880.32
$90,803.42
$92,274.90
$107,498.52
FINAL TOTAL
$1,658,700.75
$1,688,247.35
$1,712,025.47
$1,782,486.70
$1,906,871.80
$1,937,772.83
$2,257,468.92
FHP Tectonics Corp.
JRT Construction
West Construction
Bejar Construction
Lynx Construction
Management LLC
E.L.C.I. Construction Group,
Inc.
AARYA Construction &
Design, Inc.