Loading...
2015-61 Work Authorization 01-0103-212 Professional Design Services for NE 213 Street and NE 188 Street Seawall - Craven Thompson and Associates, Inc. RESOLUTION NO. 2015-61 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF AVENTURA, FLORIDA, AUTHORIZING THE CITY MANAGER TO EXECUTE ATTACHED WORK AUTHORIZATION NO. 01-0103-212 FOR PROFESSIONAL DESIGN SERVICES FOR THE NE 213TH STREET AND NE 183RD STREET SEAWALL IMPROVEMENTS PROJECT BY AND BETWEEN THE CITY OF AVENTURA AND CRAVEN THOMPSON AND ASSOCIATES, INC.; AND PROVIDING FOR AN EFFECTIVE DATE. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF AVENTURA, FLORIDA, THAT: Section 1. The City Manager is hereby authorized to execute attached Work Authorization No. 01-0103-212 ($64,760.00) for professional design services for the NE 213th Street and NE 183rd Street Seawall Improvements project by and between the City and Craven Thompson and Associates, Inc. Section 2. The City Manager is authorized to do all things necessary to carry out the aims of this Resolution. Section 3. The funds to be allocated and appropriated pursuant hereto and for the purposes of carrying out the tenets of this Resolution shall be from Budget Line Item Number 410-5001-538-6306. Section 4. This Resolution shall become effective immediately upon its adoption. The foregoing Resolution was offered by Commissioner Landman, who moved its adoption. The motion was seconded by Commissioner Cohen, and upon being put to a vote, the vote was as follows: Commissioner Enbar Cohen Yes Commissioner Teri Holzberg Yes Commissioner Denise Landman Yes Commissioner Marc Narotsky Yes Commissioner Howard Weinberg Yes Vice Mayor Robert Shelley Yes Mayor Enid Weisman Absent City of Aventura Resolution No. 2015-61 Page 2 of 2 PASSED AND ADOPTED this 3rd day of November, 2015 OR ‘* ikEe÷'.1* .1.. IIc)" ATTEST: ELLISA L. HORVATH, CITY CLERK APPROVED AS TO LEGAL SUFFICIENCY: 1r4hn \‘'It4r ) CITY ATTORNEY WORK AUTHORIZATION NO. 01-0103-212 The City of Aventura has requested Work Authorization No. 01-0103-212 as provided for in the Agreement between the City of Aventura and Craven Thompson and Associates, Inc. and approved by the City Commission on July 3, 2001. This Work Authorization No 01-0103-212 provides for technical services in accordance with Articles 3, 4, 6, 7 and 8 of the Agreement as further detailed in the scope of services in Exhibit A. Payment for such services shall be in accordance with Article 5 of the Agreement. Design Phase Task 1: Prepare Topographic Survey of Seawalls $12,500.00 Task 2: Visual Observation and Structural Assessment of Seawalls $9,500.00 Task 3: Prepare Plans and Specifications for Restoration of Seawalls $11,500.00 Task 4: Project Management $5,120.00 Total Lump Sum Design Phase $38,620.00 Bidding and Construction Phase Task 5: Prepare bid documents $5,680.00 Task 6: Provide support during bidding $5,000.00 Task 7: Provide limited construction phase engineering services $9,000.00 Task 8: Provide construction phase support services $5,960.00 Total Lump Sum Construction Phase $25,640.00 Reimbursable Expenses Printing,Graphics, Communications, Couriers, Express Mail, Etc. $500.00 Total Estimated Reimbursable Expenses $500.00 Total Lump Sum Expenses are $64,260.00 Total Estimated Reimbursable Expenses are $500.00 The time period for this work authorization will be: Surveying Phase 30 Days Inspection Phase 40 Days Design Phase 120 Days Bid Phase 75 Days Construction Phase 260 Days CITY: CITY OF AVENTURA, FLORIDA through its City ►A •ger BY _■11111I Ci Mana= Eric M. Sorok. I ; -CM day of 46/ ,2015 Notice to Proceed ✓Yes No Project Initiation Date RECOMMENDED through its Capital Projects Manx er BY ar o'!a4: Capital Projects Manager Antonio F. Tomei I3 day of oCr: ,2015 Exhibit A Consultant will provide professional surveying and engineering services specific to the preparation of plans for the restoration of seawalls on NE 183'•d Street(approx. 1,100 LF)and NE 213th Street(approx. 2,500 LF). Design Tasks 1. Prepare a topographic survey of the concrete seawall along the south side of NE 183th Street, lying south of the Admiral Port Condominium, approximately 1,000 linear feet, and the concrete seawall along the north side of NE 213th Street, bounded on the west by the west end of the canal adjacent to the city park at NE 34th Avenue and bounded on the east by the east right-of-way line for NE 37th Avenue, approximately 2,500 linear feet. This Topographic Survey will include the location of all above ground visible fixed improvements from the south edge of the seawall north to the edge of pavement along NE 183th Street,and the location of all above ground visible fixed improvements from the north edge of the seawall south to the sidewalk within the park area and south to the edge of pavement along NE 213th Street. Individual piles will be located. Elevations will be measured sufficient for engineering design and cross sections will be shown at 50 foot intervals. All elevations will be based on the National Geodetic Vertical Datum of 1929 (NGVD29). 2. Visual observation of the seawalls from land and water side, and structural assessment of the current condition of the existing piles, panels and caps. 3. Prepare design of repair details and procedures for deteriorated precast concrete piles and wall panels. Bidding and Construction Tasks 4. Prepare bid documents, respond to questions during pre-bid phase, evaluate bids and provide recommendation for contract award. 5. Provide limited services related to construction observation.