Loading...
2014-47 RESOLUTION NO. 2014-47 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF AVENTURA, FLORIDA, AUTHORIZING THE CITY MANAGER TO EXECUTE ATTACHED WORK AUTHORIZATION NO. 01-0103-189 FOR PROFESSIONAL DESIGN SERVICES FOR THE NE 29TH PLACE SOUTH DRAINAGE AND STREET LIGHTING IMPROVEMENTS PROJECT BY AND BETWEEN THE CITY OF AVENTURA AND CRAVEN THOMPSON AND ASSOCIATES, INC.; AND PROVIDING AN EFFECTIVE DATE. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF AVENTURA, FLORIDA, THAT: Section 1 The City Manager is hereby authorized to execute attached Work Authorization No. 01-0103-189 ($138,230) for professional design services for the NE 29th Place South Drainage and Street Lighting Improvements project by and between the City and Craven Thompson and Associates, Inc. Section 2 The City Manager is authorized to all things necessary to carry out the aims of this Resolution. Section 3 That the funds to be allocated and appropriated pursuant hereto and for the purposes of carrying out the tenets of this Resolution shall be from Budget Line Item Numbers 410-5001-538-6306 and 120-5001-541-6307. Section 4 This Resolution shall become effective immediately upon its adoption. The foregoing Resolution was offered by Vice Mayor Joel, who moved its adoption. The motion was seconded by Commissioner Luz Weinberg, and upon being put to a vote, the vote was as follows: Commissioner Enbar Cohen yes Commissioner Teri Holzberg yes Commissioner Michael Stern yes Commissioner Howard Weinberg yes Commissioner Luz Urbaez Weinberg yes Vice Mayor Billy Joel yes Mayor Susan Gottlieb yes Resolution No. 2014-1-11 Page 2 PASSED AND ADOPTED this 7th day of October, 2014. /J 9 USAN GOTTLIEB, MAYOR ATTEST: Ai!. IA tJ RESA M. :O•+s KA, MMC CLER' APPROVED AS TO LEGAL SUFFICIENCY: v-4 CITY ATTORNEY WORK AUTHORIZATION NO. 01-0103-189 The City of Aventura has requested Work Authorization No. 01-0103-189 as provided for in the Agreement between the City of Aventura and Craven Thompson and Associates, Inc. and approved by the City Commission on July 3, 2001. This Work Authorization No 01-0103-189 provides for technical services in accordance with Articles 3, 4, 6, 7 and 8 of the Agreement as further detailed in the scope of services in Exhibit A. Payment for such services shall be in accordance with Article 5 of the Agreement. Design Phase Task 1: Update topographic survey(Task 11246) $3,500.00 Task 2: Perform GPR locates of detectable utilities(Task 12050a) $2,800.00 Task 3: Survey GPR locates and update survey(Task 12050b) $1,800.00 Task 4: Perform SUE Quality Level A locates(Task 31005) $3,000.00 Task 5: Provide geotechnical engineering data(Task 31006) $5,150.00 Task 6: Prepare civil engineering design and construction documents(Task 31025) $40,200.00 Task 7: Prepare electrical engineering design and construction documents covered under WA 172 Task 8: Prepare landscape architectural conceptual design(Task 33080) $4,500.00 Task 9: Prepare landscape architectural contract and permit documents(Task 33081) $6,000.00 Total Lump Sum Design Phase $66,950.00 Permitting Phase Task 10: Prepare, submit and support engineering permit applications(Task 31080) $18,280.00 Total Lump Sum Permitting Phase $18,280.00 Bidding and Construction Phase Task 11: Prepare bid documents and provide support during bidding(Task 31115) $4,800.00 Task 12: Provide construction phase engineering services(Task 31120) $37,600.00 Task 13: Provide construction phase electrical engineering services(Task 31121) $4,800.00 Task 14: Provide bidding&construction phase landscape architectural services(Task 31122) $2,000.00 Task 15: Provide permit closeout services(Task 31125) $2,800.00 Total Lump Sum Construction Phase $52,000.00 Reimbursable Expenses Printing,Graphics, Communications,Couriers,Express Mail,Etc. $1,000.00 Total Estimated Reimbursable Expenses $1,000.00 Total Lump Sum Expenses are $137,230.00 Total Estimated Reimbursable Expenses are $1,000.00 The time period for this work authorization will be: Surveying& Subsurface Utility Engineering Phase 45 Days Design Phase 60 Days Permitting Phase 90 Days Bid Phase 75 Days Construction Phase 180 Days CITY: CITY OF AVENTURA,FLORIDA through its City Manager BY City Manager Eric M. Soroka,ICMA-CM day of ,2014 Notice to Proceed Yes No Project Initiation Date RECOMMENDED through its Capital Projects Manager BY �'-1c Capital Projects Manager Antonio F. Tomei 2 ? day of ,2014 Exhibit A Consultant will provide professional surveying, engineering, geotechnical engineering, landscape architectural and subsurface utility engineering services specific to the preparation of roadway and drainage improvements to NE 29th Place South from Aventura Boulevard to Abigail Road (the Aventura Mall ring road). Consultant will submit the plans to Miami-Dade County for review. Design Tasks 1. Update the previous topographic survey provided under WA 01-0103-172. 2. Provide subsurface investigation utilizing ground penetrating radar(GPR)to determine the presence of any detectable utilities. 3. Survey painted utilities determined from GPR task and incorporate into the survey drawing. 4. Perform ten(10)subsurface utility engineering(SUE)Quality Level A locates at key locations in the corridor to verify vertical elevation and pipe type and size of underground utility. 5. Provide geotechnical engineering data for two(2)augur borings and four(4)percolation tests within the project limits. 6. Prepare civil engineering design and construction drawings for proposed improvements. 7. Finalize the electrical engineering design and construction drawings for metal halide powered street lights under WA No. 172. 8. Prepare landscape architectural conceptual design to include:tree disposition plan and conceptual landscape plan. 9. Prepare tree mitigation plan, landscape plan, irrigation plan,and technical specifications. Submit applications and provide support during permit review by Miami-Dade County. Permitting Tasks 10. Prepare, submit and support engineering related permit applications with Miami-Dade County. Bidding and Construction Tasks 11. Prepare bid documents,respond to questions during pre-bid phase,evaluate bids and provide recommendation for contract award. 12. Provide civil engineering services related to construction observation. 13. Respond to requests for information during bidding and provide electrical engineering services related to construction observation. 14. Respond to requests for information during bidding and provide landscape architectural services related to construction observation and permit close-out. 15. Prepare, submit and support permit close-out of engineering permits. CITY OF AVENTURA PRELIMINARY CONSTRUCTION COST ESTIMATE N.E. 29TH PLACE SOUTH ROADWAY IMPROVEMENTS CRAVEN THOMPSON AND ASSOCIATES, INC. August 14,2014 DRAINAGE CONSTRUCTION QUANTITY UNIT MEASURE UNIT PRICE COST FURNISH&INSTALL DRAINAGE PIPE 18" 235 LF $110.00 $25,900 FURNISH&INSTALL DRAINAGE PIPE 24"W/EXFILTRATION TRENCH 500 LF $230.00 $115,000 FURNISH&INSTALL DRAINAGE PIPE 30" 60 LF $200.00 $12,000 FURNISH&INSTALL CURB INLETS 10 EA $6,500.00 $65,000 FURNISH&INSTALL STORM MANHOLES 6 EA $3,500.00 $21,000 ADJUST EXISTING DRAINAGE STRUCTURES 3 EA $500.00 $1,500 VIDEO EXIST.DRAINAGE SYSTEM 850 LF $10.00 $8,500 CLEAN EXISTING DRAINAGE SYSTEM 850 LF $12.00 $10,200 SUB-TOTAL DRAINAGE CONSTRUCTION $259,100 ROADWAY RE-CONSTRUCTION PAVEMENT MARKINGS&SIGNAGE 1 EA $7,953.00 $8,000 INSTALL TRAFFIC SIGNAL LOOPS 0 EA $1,520.00 $0 FURNISH&INSTALL CURB AND GUTTER 634 LF $50.00 $31,700 FURNISH&INSTALL SIDEWALK 352 SY $55.00 $19,400 PAVEMENT,BASE&SUB-BASE RESTORATION 550 SY $70.00 $38,500 ADJUST EXISTING ELECTRICAL BOXES 3 EA $244.00 $700 2"ASPHALT TYPE SP-9.5,INCLUDING TACK COAT 833 SY $13.56 $11,300 MILL EXISTING PAVEMENT(2"AVERAGE DEPTH) 833 SY $5.20 $4,300 RELOCATE EXISTING UTILITIES 10 EA $800.00 $8,000 FURNISH&INSTALL NEW TRAFFIC SIGNS 0 EA $200.00 $0 FURNISH&INSTALL STREET LIGHTS 11 EA $13,653.85 $150,192 FURNISH&INSTALL CURB RAMPS W/DETEC.WARNINGS 6 EA $1,800.00 $10,800 SUB-TOTAL ROADWAY CONSTRUCTION $282,892 MEDIAN LANDSCAPE IMPROVEMENTS 1 LS $60,000.00 $60,000 GRAND SUB-TOTAL CONSTRUCTION COST $601,992 GENERAL CONDITIONS @ 5% $30,100 MOBILIZATION @ 8% $48,200 MAINTENANCE OF TRAFFIC @ 6% $36,100 MISCELLANEOUS @ 2% $12,000 GRAND TOTAL CONSTRUCTION COST $728,392 DESIGN,PERMITTING&BID PHASE SERVICES $91,030 CONSTRUCTION ADMINISTRATION SERVICES $47,200 TOTAL DESIGN SERVICES , $138,230 TOTAL OPINION OF PROBABLE COST $866,622