Loading...
2014-37 RESOLUTION NO. 2014-37 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF AVENTURA, FLORIDA, ACCEPTING AND ADOPTING IN PRINCIPLE, SUBJECT TO ANNUAL REVISION AND AUTHORIZATION, THE CITY OF AVENTURA CAPITAL IMPROVEMENT PROGRAM DOCUMENT FOR FISCAL YEAR 2014/15 TO 2018/19 AUTHORIZING THE CITY MANAGER TO DO ALL THINGS NECESSARY TO CARRY OUT THE AIMS OF THIS RESOLUTION; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the Capital Improvement Program document for fiscal years 2014/15 to 2018/19, attached hereto was presented and recommended to the City Commission of the City of Aventura by the City Manager as a long term plan of proposed capital expenditures, the means and methods of financing the projects and an action plan for the implementation of the projects; and WHEREAS, the City Commission recognizes the need to adopt a Capital Improvement Program to address Beautification and Parks, Transportation, Drainage and Infrastructure Improvements, Public Buildings and Facilities, Information Technology and Capital Equipment Purchase and Replacement which represents a commitment by the community toward achievement and maintenance of a desirable high quality of life for all residents; and WHEREAS, the City Commission recognizes the need to formulate a Capital Improvement Program which adopts a sound financing plan; and WHEREAS, the City Commission has reviewed the Capital Improvement Program document at a public meeting of the City Commission and wishes to adopt said document in concept. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF AVENTURA, FLORIDA, THAT: Section 1. The City Commission hereby accepts and adopts in principle, subject to annual revisions and authorization, the City of Aventura Capital Improvement Program document for fiscal years 2014/15 to 2018/19 attached hereto and incorporated herein as specifically as if set out at length herein. Section 2. The City Manager be and the same is hereby authorized to do all things necessary and expedient in order to carry out the aims of this Resolution. Section 3. This Resolution shall take effect immediately upon adoption. The foregoing Resolution was offered by Commissioner Howard Weinberg, who moved its adoption. The motion was seconded by Commissioner Luz Weinberg, and upon being put to a vote, the vote was as follows: Commissioner Enbar Cohen yes Commissioner Teri Holzberg yes Commissioner Michael Stern yes Commissioner Howard Weinberg yes Commissioner Luz Urbaez Weinberg yes Vice Mayor Billy Joel yes Mayor Susan Gottlieb yes Resolution No. 2014-37 Page 2 PASSED AND ADOPTED this 8th day of July, 2014. SAN GOTTLIEB, MAYOR ATTEST: / i RESA M. S'a O , MMC CLERK APPROVED AS TO E AL SUFFICIENCY: I CITY ATTORNEY •_r"" ,311 City of Aventura Capital Improvement Program ' } 2014/15 — 2018/19 4` ; S CAPITAL IMPROVEMENT PROGRAM 2014/15 - 2018/19 \ / h . 1.. _r *. ^' __a..00 ofExCe CITY OF AVENTURA CITY COMMISSION Mayor Susan Gottlieb Commissioner Enbar Cohen Commissioner Teri Holzberg Commissioner Billy Joel Commissioner Michael Stern Commissioner Howard Weinberg Commissioner Luz Urbaez Weinberg CITY MANAGER Eric M. Soroka DEPARTMENT DIRECTORS Weiss Serota Helfman Pastoriza Cole & Boniske, P.A., City Attorney Robert M. Sherman, Community Services Director Teresa M. Soroka, City Clerk Joanne Carr, Community Development Director Karen J. Lanke, Information Technology Director Steven Steinberg, Police Chief Julie Alm, Principal Charter School Brian K. Raducci, Finance Director Steven Clark, Arts & Cultural Center General Manager City of _ Aventura ...._ Government Center - 19200 Weft Country Club Drive eery 44 5 Aventura.Florida 33180 Office of the City Manager June 2014 The Honorable Mayor and Members of the City Commission City of Aventura Aventura, Florida 33180 Enclosed herein is the proposed City of Aventura (the "City") Capital Improvement Program (CIP) for the fiscal period October 1, 2014 through September 30, 2019 and the proposed Capital Budget for the Fiscal period October 1, 2014 through September 30, 2015. The primary goal of the CIP is to develop a long—term plan of proposed capital expenditures, the means and methods of financing, and a schedule of priorities for implementation. It is important to stress that the CIP is a planning tool to evaluate infrastructure needs of the City as well as the financial capabilities of the City. In order to determine the impact of the CIP on the City's future operating budget, the City Commission and residents will be provided with the benefits of a CIP document which serves as a point of reference and includes an estimated long-term budget plan. At this point in the City's history, the need for major capital improvement funding has decreased substantially due to a very ambitious schedule of completing major community facilities and infrastructure projects during the past eighteen years since the incorporation of the City. This document represents an update of the CIP that was originally prepared for the five-year cycle of 2013 to 2018. The update process is important for the CIP to become a continuing and ongoing planning/implementation process. The last four years of last year's program were reevaluated in light of unanticipated needs, cost revisions, new project priorities and the financial condition of the City. In addition, the CIP was updated to add new projects in the fifth year (2018/19) to complete the cycle. Projects included within the framework of the program were based on input from Commissioners, staff, City consultants and citizens. The following represents the significant revisions or modifications to the proposed CIP compared to the prior document: 1. Added NE 29th Place street resurfacing, safety, drainage and street lighting improvements project- $1,808,000. 2. Added Traffic Video Monitoring System upgrade project -$1,800,000 3. Added NE 191st drainage and road Improvements - $900,000. 4. Added seawall repairs to NE 213th street, 183rd Street, NE 188th Street and NE 190th Street - $450,000. 5. Added NE 187th Street and NE 185th Street resurfacing -$266,000. 6. Added $1,200,000 to retrofit street lighting to more energy efficient LED fixtures. 7. Replace 4 water fountains around Country Club Drive exercise trail - $31,000. The proposed 2014 — 2019 CIP includes 32 projects in five (5) functional categories with a total value of $16,890,900. The following represents the percentage of total funding that each functional category has been allocated: Beautification & Parks Facilities (8%), Transportation, Drainage and Infrastructure Improvements (55%), Capital Equipment Purchase and Replacement (20%), Information/Communication Technology (16%) and Public Buildings and Facilities Improvements (1%). Major emphasis was placed on the following projects: Road Resurfacing $3,296,000 Stormwater Drainage Improvements 2,490,000 TVMS Upgrades 1,800,000 Street Lighting Upgrades 1,678,000 Park Improvements 1,351,450 Air Conditioning Unit Replacements 152,000 The document contains a detailed funding plan that forecasts revenues necessary to fund both the CIP and the operating budgets over the next five (5) years. The proposed funding plan is based on the assumption that operating expenditures can be maintained at certain percentage increases and revenues grow at specified levels. The plan is based on conservative estimates. I am proud of the many accomplishments and the support the City Commission and residents have shown in the implementation of the capital projects since the incorporation of the City. Our beautification projects, park and open space additions, Government Center, Community Recreation Center, Charter School, Arts & Cultural Center, transportation improvements and many other community enhancements continue to exhibit our commitment to excellence and professionalism. This document serves many purposes. Importantly it serves as an aid to the residents in providing a better understanding of the City's long-term capital needs and how the City intends to meet these demands. It also details our continuing effort to address the needs and concerns of our citizens while making prudent financial decisions which contribute to the City's long-term financial health. The preparation and formulation of this document could not have been accomplished without the dedicated efforts of all Department Directors and their staff. Their professional efforts have assisted in the preparation of this important planning program. I request and recommend that you take the following actions regarding the proposed 2014 - 2019 Capital Improvement Program: 1. Hold a workshop meeting to review the CIP document in June. 2. Transmit copies of the CIP summary document to the public. 3. Hold a public hearing to conceptually adopt the final CIP document, by resolution, for implementation. All questions relating to the CIP should be referred to my attention. Respectfully submitted, G • Eric M. So City Manager CAPITAL IMPROVEMENT PROGRAM 2014 - 2019 HIGHLIGHTS • Road maintenance projects that total $3,296,000 to resurface asphalt and enhance safety are included for NE 29th Place, NE 207th Street, NE 213th Street, Biscayne Lake Gardens, NE 191st Street, NE 27th Avenue, NE 28th Court, NE 30th Avenue, NE 209th Street, Yacht Club Drive, Mystic Point Drive, NE 187th Street and NE 185th Street. • Provides for improvements to Founders Park, Veterans Park, and Waterways Park in the amount of$324,000 to address upgrades requested by the users of the facilities and maintenance requirements. • Utilizes a stormwater utility program to improve drainage along NE 29th Place and NE 191st Street, upgrades seawalls along NE 213th Street, NE 183rd Street, NE 188th Street, NE 190th Street and maintain systems throughout the City. A total of $2,490,000 has been earmarked during the five-year period. • Funds development of a 1.5 acre new park planned on NE 188th Street at a cost of $980,000. • Provides funding in the amount of $1,200,000 to retrofit street lighting throughout the City with more energy efficient LED fixtures and $478,000 for new street lights on NE 30th Avenue and NE 29th Place. • Includes $1,800,000 to upgrade the City's Traffic Video Monitoring System to the latest state-of-the-art technology. • Provides the necessary equipment to continue to provide high quality and effective police services. • Continues the implementation of technology improvements and management information systems to enhance the productivity and efficiency of City operations. • Ensures that the tools of production, vehicles, equipment and technology, are available for City operations. CAPITAL IMPROVEMENT PROGRAM 2014 - 2019 TABLE OF CONTENTS INTRODUCTION PAGE Purpose of the Capital Improvement Program 1 Legal Authority 2 Development of the Capital Improvement Program 2 Capital Improvement Program Policies 3 Preparing the Capital Budget 4 Locating a Specific Capital Project 4 Reading the Program Schedules 5 OVERVIEW OF RECOMMENDED PROJECTS Summary of Recommended Projects 7 Summary of Major Programs 7 Summary of Proposed Appropriations by Funding Source 8 Summary of Projects by Location and Year 9 FUNDING PLAN Introduction 11 Debt vs. Pay-As-You-Go Financing 11 Required Separation of Funding Sources 12 Summary of Financing Plan Model 13 Proposed Financing Plan General Fund 14 Proposed Financing Plan Transportation Fund 18 Proposed Financing Plan Stormwater Utility Fund 19 PROJECT DESCRIPTIONS AND FUNDING SCHEDULES Beautification and Park Facilities Improvements 22 Transportation, Drainage and Infrastructure Improvements 30 Public Buildings and Facilities Improvements 37 Information/Communications Technology 41 Capital Equipment Purchases and Replacements 50 t I 4..t1 b '4 re ' k t, -----:',€11 lo\‘,1::',i Aiiii/4 ` e`. slit 4 fl c4)„of Exee t i , -.4. f 14 INTRODUCTION f t„. City of Aventura INTRODUCTION This section describes what a Capital Improvement Program (CIP) is and the process for developing the City of Aventura (the "City") Capital Improvement Program and Capital Budget. This introduction also explains how to locate a specific project in this document. PURPOSE OF THE CAPITAL IMPROVEMENT PROGRAM The purpose of the CIP is to establish a long term plan of proposed capital expenditures, the means and methods of financing, and a schedule of priorities for implementation. In order to determine the impact on the City's operating budget, debt service and the general trend of future expenditures, the City Commission will be provided with the advantage of a CIP document as a point of reference and estimated long-term budget plan. In accordance with the State's Growth Management Act, the City is required to undergo this process in order to meet the needs of its Comprehensive Plan. The CIP is an official statement of public policy regarding long-range capital development within the City. A capital improvement is defined as a capital expenditure of$5,000 or more, resulting in the acquisition, improvement or addition to fixed assets in the form of land, buildings or improvements, more or less permanent in character, and durable equipment with a life expectancy of more than one (1) year. In addition, equipment that has a value of $5,000 or less is also included in this document for budgetary purposes. The CIP lists proposed capital projects to be undertaken, the year in which they will be started, the amount expected to be expended in each year and the method of financing these projects. Based on the CIP, a department's capital outlay portion of the annual Operating Budget will be formulated for that particular year. The CIP document also communicates to the citizens, businesses and interested parties the City's capital priorities and plan for implementing projects. The five-year CIP is updated annually to add new projects in the fifth year, to re- evaluate the program and project priorities in light of unanticipated needs, and to revise recommendations to take account of new requirements and new sources of funding. Capital Improvement programming thus becomes a continuing part of the City's budgeting and management procedures. The annual capital programming process provides the following benefits: 1. The CIP is a tool for implementing the City's Comprehensive Plan. 2. The CIP process provides a mechanism for coordinating among projects with respect to function, location, and timing. Capital Improvement Program 2014-2019 Page 1 City of Aventura 3. The yearly evaluation of project priorities ensures that the most crucial projects are developed first. 4. The CIP process facilitates long-range financial planning by matching estimated revenue against capital needs, establishing capital expenditures and identifying the need for municipal borrowing and indebtedness within a sound long-range fiscal framework. The sound fiscal policy that results from this process will have a positive impact on the City's bond rating. 5. The impact of capital projects on the City's operating budget can be projected. 6. The CIP serves as a source of information about the City's development and capital expenditures plan for the public, City operating departments and the City Commission. LEGAL AUTHORITY A capital programming process to support the comprehensive plan is required by the Local Government Comprehensive Planning and Land Development Regulations, incorporated as Chapter 163, Florida Statues. DEVELOPMENT OF THE CAPITAL IMPROVEMENT PROGRAM The City's capital programming process began in January when operating departments were required to prepare requests for all proposed capital projects anticipated during the period of 2014 - 2019. A CIP Preparation Manual and related forms were distributed to all departments for this purpose. In February, departmental prioritized project requests were submitted to the City Manager's Office. Department Directors were asked to justify projects in terms of benefits derived, necessity to health, safety and welfare of the City, enhancement to City plans and policies, need of residents and funding. Projects were prioritized on the basis of Urgency, Necessity, Desirability, and Deferability. The City Manager reviewed departmental requests and conducted individual meetings with Department Directors. The departmental requests were prioritized and the five- year schedule of projects was compiled into document form by the City Manager. The methods of financing and revenue sources were then prepared by the Finance Director and City Manager and were incorporated into the CIP document. At this point, the proposed CIP is submitted to the City Commission and public for review. In order to facilitate public involvement, public hearings and community meetings will be held to unveil and review the CIP document prior to the adoption of a Resolution approving the CIP in principle. Capital Improvement Program 2014-2019 Page 2 City of Aventura CAPITAL IMPROVEMENT PROGRAM POLICIES 1. Annually, the City will prepare a five-year capital improvement program analyzing all anticipated capital expenditures and identifying associated funding sources. Future capital expenditures necessitated by changes in population, changes in development, growth, redevelopment or changes in economic base will be calculated and included in the Capital update process. 2. The City will perform all capital improvements in accordance with an adopted CIP. 3. The classification of items as capital or operating will be determined by two criteria - cost and frequency. Generally, a capital project has a "useful life" of more than one (1) year and a value of$5,000 or more. In addition, equipment that has a value of $5,000 or less is also included in the document for budgetary purposes. 4. The City will coordinate development of the capital improvement budget with the development of the operating budget. Future operating costs associated with new capital improvements will be projected and included in the operating forecasts. 5. The first year of the five-year capital improvement program will be used as the basis for formal fiscal year appropriations during the annual budget process. 6. The City will maintain all of its assets at a level adequate to protect the City's capital investment and to minimize future maintenance and replacement costs. 7. The City will identify the estimated cost of capital projects and prepare a funding projection that considers revenues and operating costs to be included in the Capital Improvement Program document that is submitted to the City Commission for approval. 8. The City will determine the most appropriate financing method for all new projects. 9. If appropriate, the City will attempt to maintain a mixed policy of pay-as-you-go and borrowing against future revenues for financing capital projects. 10 The City will maintain ongoing maintenance schedules relating to road, sidewalk and drainage system improvements. 11. The City will address and prioritize infrastructure needs on the basis of protecting the health, safety and welfare of the community. 12. A CIP preparation calendar shall be established and adhered to. 13. Capital projects will conform to the City's Comprehensive Plan. 14. Long-term borrowing will not be used to fund current operations or normal maintenance. 15. The City will strive to maintain an unreserved General Fund Fund Balance at a level not less than 10% of the annual General Fund revenue. Capital Improvement Program 2014-2019 Page 3 City of Aventura 16. If new project appropriation needs are identified at an interim period during the fiscal year, the funding sources will be identified and mid-year budget amendments will be utilized to provide formal budgetary authority. In addition budget amendments may be utilized to increase appropriations for specific capital projects. PREPARING THE CAPITAL BUDGET The most important year of the schedule of projects is the first year. It is called the Capital Budget and is adopted separately from the five-year program as part of the annual budget review process. Based on the CIP, each department's capital outlay portion will be formulated for that particular year. Each year the CIP will be revised and another year will be added to complete the cycle. Capital Improvement Programming thus becomes a continuing part of the City's budget and management process. The Capital Budget is distinct from the Operating Budget. The Capital Budget authorizes capital expenditures, while the Operating Budget authorizes the expenditure of funds for employee salaries, supplies and materials. Through the City's amendment process, changes can be made to the adopted Capital Budget during the fiscal year. A request for amendment is generated by an operating department based on an urgent need for new capital project or for additional funding for a previously approved project. The request is reviewed by the Finance Director and City Manager and, if approved by the City Manager, a budget amendment is presented to the City Commission. LOCATING A SPECIFIC CAPITAL PROJECT The Capital Improvement Program is divided into five (5) program areas as follows: Beautification and Parks (BP) Transportation, Drainage and Infrastructure Improvements (TDI) Public Buildings and Facilities (PBF) Information/Communications Technology (ICT) Capital Equipment Purchases & Replacement (CE) Each project in the Capital Improvement Program has a unique project number. This project number appears at the beginning of the individual project descriptions and the Summary by Year tables. The first digit refers to functional category priority number assigned by the City Manager. The final digits outline the individual department requesting the project. For example, project TDI-1-CS is Transportation, Drainage and Infrastructure Improvements project number one which was requested by the Community Services Department. Capital Improvement Program 2014-2019 Page 4 City of Aventura READING THE PROGRAM SCHEDULES Detailed information about each capital project is presented in the section titled "Capital Improvement Program Project Descriptions and Funding Schedules." The section is arranged by program area and functional category and includes a description of each project and the funding schedules. Project timetables for each functional category are indicated in the Summary by Year tables. The funding schedules are based on the funding needed to complete an individual project. A project's funding may continue for several years depending on the development timetable. Each program has a separate Funding Plan Table that outlines the revenue sources proposed to fund project expenditures. Capital Improvement Program 2014-2019 Page 5 City of Aventura (777:74' M< 1 n .? of Ex ce OVERVIEW Ar Ate tit Now.,, 4 ofrimr, Page 6 Capital Improvement Program 2014-2019 City of Aventura OVERVIEW OF RECOMMENDED PROJECTS SUMMARY OF RECOMMENDED PROJECTS The proposed 2014 — 2019 CIP includes 32 projects in five (5) functional categories with a total value of $16,890,900. The following represents the percentage of total funding that each functional category has been allocated: Beautification & Parks Facilities (8%), Transportation, Drainage and Infrastructure Improvements (55%), Capital Equipment Purchase and Replacement (20%), Information/Communication Technology (16%) and Public Buildings and Facilities Improvements (1%). SUMMARY OF MAJOR PROGRAMS The following table presents a summarized breakdown of the costs of the various projects recommended for funding categorized by major function for each of the five (5) years covered by the CIP. Table 1 Program 2014/15 2015/16 2016/17 2017/18 2018/19 TOTAL Beautification&Parks Facilities $ 181,000 $ 871,200 $ 39,400 $ 200,000 $ 59,850 $ 1,351,450 Transportation,Drainage& 3,588,000 2,860,000 933,000 1,017,000 866,000 9,264,000 Infrastructure Public Buildings&Facilities 15,000.00 30,000.00 30,000 42,000 81,000 198,000 Information/Communication 563,600 479,100 502,300 576,900 534,050 2,655,950 Technology Capital Equipment 677,430 662,910 732,060 670,350 678,750 3,421,500 Totals $ 5,025,030 $ 4,903,210 $ 2,236,760 $ 2,506,250 $ 2,219,650 $ 16,890,900 Capital Improvement Program 2014/15 - 2018/19 capital Summary By Function Equipment Beautification & 20% Parks Facilities 8% Information Technology 16% Public ublic Building Drainage & 10/0 Infrastructure 55% Cap Page 7 City of Aventura SUMMARY OF PROPOSED APPROPRIATIONS BY FUNDING SOURCE The following table reflects the distribution of all proposed projects to the funding source or mechanism, which is appropriate for funding the projects for each of the five (5) years of the program. Table 2 Capital Improvement Program 2014/15 - 2018/19 Summary By funding Source Funding Source 2014/15 2015/16 2016117 2017/18 2018/19 TOTAL General $ 1,165,030 $ 1,053,710 $ 1,131,760 $ 1,303,250 $ 1,178,650 $ 5,832,400 Stormwater Utility 850,000 1,040,000 200,000 200,000 200,000 2,490,000 Capital Projects Fund 1,330,000 1,150,000 0 0 0 2,480,000 Charter School 142,000 139,500 172,000 186,000 175,000 814,500 Transportation Fund 1,538,000 1,520,000 733,000 817,000 666,000 5,274,000 $ 5,025,030 $ 4,903,210 $ 2,236,760 $ 2,506,250 $ 2,219,650 $ 16,890,900 The proposed funding plan involves a commitment to "pay—as-you-go" annual appropriations established in yearly budgets and does not include additional long term debt. Funding Source Summary Stormwater Utility 15% Capital Projects General 15% 34% Charter School 5% Transportation Fund 31% Capital Improvement Program 2014-2019 Page 8 City of Aventura SUMMARY OF PROJECTS BY LOCATION AND YEAR The following outlines the major projects by location and the year they are proposed to be funded: Table 3 Capital Improvement Program 2014/15 - 2018/19 Summary By Location Resurfacing Street Lighting Drainage Park Location Improvements Improvements Founders Park 2014 to 2018 Waterways Park 2014/15 Veterans Park 2017-2019 NE 29th Place 2014 to 2016 Biscayne Lake Gardens 2014/15 NE 207th Street 2014/15 NE 30th Avenue 2014 - 2016 NE 188th Street Park 2014-16 NE 213th Street 2015/16 Yacht Club Drive 2015/16 NE 191st Street 2015/16 NE 27th Avenue 2016/17 NE 28th Court 2016/17 NE 209th Street 2016/17 Yacht Club Drive 2017/18 Mystic Point Drive 2017/18 NE 187th Street 2018/19 NE 185th Street 2018/19 Capital Improvement Program 2014-2019 Page 9 City of Aventura 0 • 0 Q 0 11 !_' 1' .•• i.. I - e„ .„,,r * 1, li of Bocce • t* FUNDING PLAN r 1 ilor A Capital Improvement Program 2014-2019 Page 10 City of Aventura FUNDING PLAN INTRODUCTION In order for a CIP to be an effective management planning tool, the program must include not only a compilation of major capital needs and their costs but also a financing plan for the entire life of the program. This financing plan must include an analysis of the available resources which will be used to fund not only the CIP itself but the required operating expenses and debt service requirements of the City. In order to ensure that the financing plan is complete in every respect, the plan formulation process must include: 1. A projection of revenues and resources which will be available to fund operating and capital expenditures during the life of the CIP. 2. A projection of future years' operating expenditure levels which will be required to provide ongoing services to City residents. 3. Once the CIP projects have been evaluated, a determination is made of the projects to be funded and the timing of the cash outflow for each project. The information is then tabulated to determine the amounts required to fund the CIP for each year. 4. From the information obtained in 1 through 3 above, the additional resources required to fund the CIP will be determined and a decision will be made on whether the program is to be financed by the issuance of debt, on a pay-as-you-go basis or some combination of the two (2). The financing plan prepared in such a manner will be as accurate as possible and should be an informative document to all City residents. However, due to the uncertainty involved in projecting operating cost increases, the community's desire for service increases and the inflow of resources over a five-year period, the financing plan presented should be viewed as a theoretical framework to be adjusted each year based on the most recent information available at that time. This will be accomplished by updating the financing plan each year, adopting operating and capital budgets, and ordinances to implement fee structures which will be required to fund the program each year. DEBT VS PAY-AS-YOU-GO FINANCING Debt financing through the issuance of long term bonds is most appropriate when: 1. There are a small number of relatively large dollar value projects. 2. Larger projects cannot be broken into segments and the costs distributed over a longer time frame without impairing the usefulness of the project. Capital Improvement Program 2014-2019 Page 11 City of Aventura 3. The projects are non-recurring. 4. Assets acquired have a relatively long useful life which equals or exceeds the life of the debt. Through long-term bond financing, the costs of a project having a long useful life can be shared by future residents who will benefit from the projects. In contrast, pay-as-you-go financing is most appropriate for a CIP which includes: 1. A large number of projects having a relatively small dollar value. 2. Projects which can be broken into phases with a portion completed each year without impairing the overall effectiveness of the project. 3. Projects which are of a recurring nature. 4. Projects where the assets acquired will have relatively short useful lives. The primary advantage of pay-as-you-go financing is that the interest costs and costs of bringing a bond issue to market can be avoided. However, if inappropriately used, this financing plan may cause tax rates and fee structures to increase suddenly and may result in current residents paying a greater portion of projects which benefit future residents. In summary, the choice of the appropriate financing plan will be contingent upon an analysis of the projects to be included in a CIP. REQUIRED SEPARATION OF FUNDING SOURCES In order to comply with accepted governmental accounting practices and to ensure compliance with City Codes and any related Bond Indentures, the analysis and financing plan contained herein will be presented within their respective funds. Projects funded on a pay-as-you-go basis will directly relate to the Capital Fund Budget from where the source of funding is derived. Each of these Budgets will appear in the Annual Operating and Capital Improvement Budget, which is adopted each year. Those funds are currently represented as follows: 1. General Fund 2. Transportation and Street Maintenance Fund 3. Charter School Fund 4. Capital Projects Fund 5. Stormwater Utility Fund Capital Improvement Program 2014-2019 Page 12 City of Aventura In accordance with accounting, legal and internal revenue requirements, all projects to be completed with the proceeds received from the sale of Bonds or loans will be accounted for in a Capital Construction Fund or Stormwater Utility Fund. In addition, capital outlay for the Charter School is included in a separate Budget adopted by the City Commission. SUMMARY OF FINANCING PLAN MODEL Detailed funding plans for individual funds of the City are enclosed herein in the following sections. The following represents an overview of the major points of the recommended funding plan: 1. Utilize "pay-as-you-go" financing through annual appropriations to fund the total five year amount of$16,890,900. No additional debt is recommended. 2. Adjusts property tax revenues based on projected conservative growth in assessments. Capital Improvement Program 2014-2019 Page 13 City of Aventura PROPOSED FINANCING PLAN GENERAL FUND After evaluating the nature of the various projects that are included in the City's General CIP, it was decided that pay-as-you-go would be most appropriate for funding the program. FINANCING PLAN TABLES Based on this decision, the analysis which follows is aimed at developing a financing plan which will allow the City to fund General Government Services operating expenditures and all projects recommended for funding in the General CIP for each year of the program. Table 1 presents a five-year projection of resources which will be available for General Government Services. Unless shown by an asterisk (*), the amount projected for each revenue is based on the tax rate or fee structure in effect during the 2013/14 fiscal year. Revenue descriptions followed by an asterisk (*) were computed based on a projected increase in the rate structure as discussed in the assumption of projections. Table 2 presents a five-year projection of required operating expenses for General Government Services which utilize the cost data as outlined in the assumption of projections. Table 3 is a recap of resources available to fund the General CIP based on projected revenues and expenditures and the proposed Capital Improvement Program appropriations for the five (5) years of the program. Please note that this analysis assumes that all available resources not needed to fund current operating expenditures will be transferred to the CIP Fund and that any balance in the CIP Fund will remain in the CIP. Through this process, the City will be able to accumulate a reserve which would be used to fund unexpected capital outlays or to fund future years' programs. Capital Improvement Program 2014-2019 Page 14 City of Aventura TABLE 1 PROJECTION OF RESOURCES AVAILABLE FOR GENERAL GOVERNMENT SERVICES 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 CURRENT YEAR REVENUES AVAILABLE FOR GENERAL GOVERMENT SERVICES AD VALOREM TAXES $12,812,525 $13,741,716 $14,291,385 $14,791,583 $ 15,309,289 $15,845,114 (a) FPL FRANCHISE FEES 2,600,000 2,652,000 2,705,040 2,759,141 2,814,324 2,870,610 (b) FRANCHISE FEES 500,000 508,000 523,240 538,937 555,105 571,758 (c) UTILITY TAXES 7,630,000 7,567,000 7,794,010 8,027,830 8,268,665 8,516,725 (d) SECTION 185 PREMIUM TAX 268,000 288,000 288,000 288,000 288,000 288,000 CITY BUSINESS LICENSES TAX 840,000 880,000 888,800 897,688 906,665 915,732 (e) BUILDING RELATED REVENUE 1,501,500 1,653,000 1,653,000 1,603,000 1,553,000 1,000,000 (f) STATE SHARED REVENUES-UNRESTRICTED 487,679 552,329 568,899 585,966 603,545 621,651 (g) HALF CENT SALES TAX 2,300,000 2,550,000 2,639,250 2,731,624 2,827,231 2,926,184 (h) CHARGES FOR SERVICES 1,970,200 2,120,000 2,194,200 2,270,997 2,350,482 2,432,749 (i) FINES AND FORFEITURES 1,632,000 1,632,000 1,680,960 1,731,389 1,783,330 1,836,830 (j) MISC.REVENUES 166,000 165,000 178,000 178,000 178,000 178,000 COUNTY BUSINESS TAX 45,000 49,000 49,000 49,000 49,000 49,000 TOTAL CURRENT YEAR REVENUES $32,752,904 $34,358,045 $35,453,784 $36,453,155 $37,486,635 $38,052,353 TRANSFERS FROM E911 FUND 30,000 30,000 31,050 32,137 33,262 34,426 TRANSFERS FROM SCHOOL FUND - - 30,000 30,000 30,000 30,000 TOTAL AVAILABLE $ 32,782,904 $ 34,388,045 $ 35,514,834 $ 36,515,292 $ 37,549,897 $ 38,116,779 NOTES TO ASSUMPTION OF PROJECTIONS (a) Ad Valorem Tax revenues are estimated to grow at the rate of 7.3% in 2014/15 and then 4%to 3.5% in future years. (b) FPL Franchise Fees from Dade County will grow at the rate of 2% per year. (c) Franchise fees will grow at the rate of 3% per year. (d) Utility taxes will grow at the rate of 3% per year. (e) Business License Tax will grow at the rate of 1.0% per year. (f) Building related revenues will decrease over the 5 year period. (g) State shared revenues will grow at the rate of 3% per year. (h) Half-cent sales tax will grow at the rate 3.5% per year. (i) Charges for services will grow at the rate of 3.5% per year. (j) Fines&forfeitures will grow at the rate of 3% per year. Capital Improvement Program 2014-2019 Page 15 City of Aventura TABLE 2 PROJECTION OF OPERATING EXPENDITURES FOR GENERAL GOVERNMENT SERVICES DEPARTMENT 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 City Commission $ 124,140 $ 125,339 $ 127,846 $ 131,681 $ 135,632 $ 139,701 Office of the City Manager 787,104 810,506 842,926 876,643 911,709 948,177 Legal 270,000 270,000 270,000 270,000 270,000 270,000 City Clerk 281,731 313,689 349,373 366,842 402,521 430,698 Finance 957,677 991,411 1,040,982 1,093,031 1,147,682 1,205,066 Information Technology 932,834 972,580 1,016,346 1,067,163 1,120,522 1,176,548 Public Safety 16,819,878 17,467,503 18,340,878 19,074,513 19,932,866 20,829,845 Arts&Cultural Center 693,793 726,900 759,611 793,793 829,514 866,842 Community Development 1,889,105 2,108,160 2,171,405 2,204,975 2,265,224 2,255,833 Community Services 4,295,798 4,482,158 4,661,444 4,847,902 5,041,818 5,243,491 Non-Departmental 1,500,200 1,469,000 1,498,380 1,528,348 1,558,915 1,590,093 TOTAL PROJECTED OPERATING EXPENDITURES GENERAL GOVERNMENTAL SERVICES $ 28,552,260 $ 29,737,246 $ 31,079,191 $ 32,254,892 $ 33,616,402 $ 34,956,293 TOTAL PROJECTED DEBT SERVICE REQUIREMENTS 2,221,190 2,212,045 2,220,979 2,220,979 2,220,979 2,220,979 Transfers TOTAL PROJECTED EXPENDITURES $ 30,773,450 $ 31,949,291 $ 33,300,170 $ 34,475,871 $ 35,837,381 $ 37,177,272 NOTES TO ASSUMPTION OF PROJECTIONS Operating expenditures are projected to increase 4% to 4.2 each year. Capital Improvement Program 2014-2019 Page 16 City of Aventura TABLE 3 RECAP OF AVAILABLE RESOURCES vs PROPOSED APPROPRIATIONS GENERAL FUND CAPITAL IMPROVEMENT PROGRAM 2014/15 2015/16 2016/17 2017/18 2018/19 TOTAL PROJECTED AVAILABLE RESOURCES $34,388,045 $35,514,834 $36,515,292 $37,549,897 $38,116,779 PROJECTED OPERATING EXPENDITURES 29,737,246 31,079,191 32,254,892 33,616,402 34,956,293 DEBT SERVICE REQUIREMENTS 2,212,045 2,220,979 2,220,979 2,220,979 2,220,979 SUBTOTAL-EXPENDITURES 31,949,291 33,300,170 34,475,871 35,837,381 37,177,272 BALANCE AFTER OPERATING COSTS 2,438,754 2,214,664 2,039,421 1,712,516 939,506 LESS CIP APPROPRIATIONS 1,165,030 1,053,710 1,131,760 1,303,250 1,178,650 BALANCE $ 1,273,724 $ 1,160,954 $ 907,661 $ 409,266 $ (239,144) AMOUNT NEEDED FROM CIP RESERVE OR NEW REVENUES $ - $ - $ - $ - $ (239,144) t * ,,takealfoNwitismoo- 4$13,1001 MhiligaViektimitioleatiftirawalfitiviekv'WA -,14-`14,•;:':11404.2ta+Ait ti a +. j;Ifa Capital Improvement Program 2014-2019 Page 17 City of Aventura PROPOSED FINANCING PLAN TRANSPORTATION FUND This fund was established to account for restricted revenues and expenditures which by State Statute and County Transit System Surtax Ordinance are designated for transportation enhancements, street maintenance and construction costs. This table reflects the anticipated revenues available and the proposed appropriations. TABLE 4 TRANSPORTATION AND STREET MAINTENANCE FUND RECAP OF AVAILABLE RESOURCES AND PROPOSED APPROPRIATIONS SUMMARY BY YEAR 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 REVENUES LOCAL OPTION GAS TAX $ 505,000 $ 505,000 $ 517,625 $ 530,566 $ 543,830 $ 544,000 INTEREST EARNINGS 500 2,000 2,000 2,000 2,000 1,000 STATE SHARED REVENUES-RESTRICTED 170,000 170,000 $ 174,250 $ 178,606 $ 183,071 $ 184,000 CARRYOVER 1,586,617 1,358,815 685,315 33,805 172,566 229,822 COUNTY TRANSIT SYSTEM SURTAX 1,050,000 1,050,000 1,076,250 1,103,156 1,130,735 1,131,000 TOTAL REVENUES $3,312,117 $3,085,815 $2,455,440 $1,848,133 $2,032,202 $2,089,822 EXPENDITURES Maintenance Operating Expenditures $ 450,000 $ 463,500 $ 486,675 $ 511,009 $ 536,559 $ 563,387 Transit Services 375,000 399,000 414,960 431,558 448,821 466,774 TOTAL EXPENDITURES $ 825,000 $ 862,500 $ 901,635 $ 942,567 $ 985,380 $1,030,161 Total For Capital 2,487,117 2,223,315 1,553,805 905,566 1,046,822 1,059,662 CAPITAL EXPENDITURES Project Title 2013/14 2014/15 2015/16 2016/17 2017/18 2018/19 Street Lighting $ 100,000 $ 228,000 $ 250,000 $ 400,000 $ 400,000 $ 400,000 TVMS - 300,000 - - - - Road Resurfacing Program 978,302 1,010,000 1,270,000 333,000 417,000 266,000 TOTAL CAPITAL EXPENDITURES $1,078,302 $1,538,000 $1,520,000 $ 733,000 $ 817,000 $ 666,000 Reserves $1,358,815 $ 685,315 $ 33,805 $ 172,566 $ 229,822 $ 393,662 Capital Improvement Program 2014-2019 Page 18 City of Aventura PROPOSED FINANCING PLAN STORMWATER UTILITY FUND The City is responsible for stormwater management activities within its corporate boundaries. In order to address deficiencies and develop an ongoing maintenance program, a Stormwater Utility Fund was created. The Fund generates revenues for stormwater management costs, permitting, maintenance and capital improvements from a source other than the General Fund, gas taxes or ad valorem taxes. The Utility relies on user fees charged to residents and businesses for generating revenues. Table 5 reflects the anticipated revenues available and the proposed appropriations for the Stormwater Utility Fund for the five-year period. A total of$2,490,000 worth of stormwater drainage projects will be completed during the five-year period. The monthly rate charged to users per unit was $2.50 for 2013/14. It is not recommended that the fee be increased during the next five (5) years. TABLE 5 RECAP OF AVAILABLE RESOURCES vs PROPOSED APPROPRIATIONS STORMWATER UTILITY FUND 2013/14 2014/15 2015/16 2016/17 2017/18 2018119 Revenues: Stormwater Utility Billings(1) $850,000 $867,000 $884,340 $902,027 $920,067 9938,469 State Grant 425,000 - Carry Over of Surplus 880,000 1,215,600 481,284 581,509 675,702 $ 850,000 $ 2,172,000 $ 2,099,940 $ 1,383,311 $ 1,501,576 $ 1,614,170 Operating Expenses: (2) 535,000 556,400 578,656 601,802 625,874 650,909 Available for CIP&Debt Service $ 315,000 $ 1,615,600 $ 1,521,284 $ 781,509 $ 875,702 $ 963,261 Annual CIP Expenditures: 200,000 850,000 1,040,000 200,000 200,000 200,000 Annual Surplusl(Deficit): $ 115,000 $ 765,600 $ 481,284 $ 581,509 $ 675,702 $ 763,261 NOTES TO ASSUMPTION OF PROJECTIONS • (1)Projected to remain flat. (2)Includes Operation and Maintenance,Engineering,Administration,Re■iew of Existing Account Data Costs. Capital Improvement Program 2014-2019 Page 19 City of Aventura PROPOSED FINANCING PLAN CAPITAL PROJECTS FUND This fund was established to account for restricted impact fees or other revenues and which by Ordinance or Commission Policy are designated for police and parks capital improvements. This table reflects the anticipated revenues available and the proposed appropriations. TABLE 6 CAPITAL PROJECTS FUND RECAP OF AVAILABLE RESOURCES AND PROPOSED APPROPRIATIONS SUMMARY BY YEAR 2013114 2014115 2015116 2016/17 2017/18 2018/19 REVENUES Police Impact Fees $ 7,500 $ 7,500 $ 7,500 $ - $ - $ - Park Impact Fees 7,500 7,500 7,500 - - - Land Sale Proceeds 1,000,000 - - - - - Developer Contributions - 750,000 - - - - Carryover Police TVMS - 450,000 300,000 - - - Carryover-Parks Impact Fees - 1,045,933 923,433 - - - Carryover-Police Impact Fees - 19,891 27,391 35,000 - TOTAL REVENUES $1,015,000 $2,280,824 $1,265,824 $ 35,000 $ - $ - POLICE CAPITAL EXPENDITURES Police Equipment $ - $ - $ - $ - $ - $ - TVMS - 1,200,000 300,000 - - - Police Reserves - 27,391 34,891 $ 35,000 - - TOTAL EXPENDITURES - $1,227,391 $ 334,891 $ 35,000 - - PARKS CAPITAL EXPENDITURES Park Reserves 780,000 923,433 80,933 - - Founders Park Improvements 175,000 - - - - - Waterways Park Improvements 10,000 - - - - - Waterways Dog Park Improvements 30,000 - - - - - Veterans Park Improvemnets 20,000 - - - - - NE 188th Street Park Improvements - 130,000 850,000 - - - TOTAL EXPENDITURES 1,015,000 1,053,433 930,933 - - - TOTAL CAPITAL EXPENDITURES $1,015,000 $2,280,824 $1,265,824 $ 35,000 $ - $ - Capital Improvement Program 2014-2019 Page 20 • City of Aventura 11111Nr,,, . : ,i' "", ' ri �I 0� !" 1j tom. : : rrn . ���� ■• I �.. ^':a".� i. * ''Ill 111Y.,•••.- t• * k . .: F \ of Exce i �, 1„,` 0n 4 , & r PROJECT DESCRIPTIONS 1 Capital Improvement Program 2014-2019 Page 21 City of Aventura BEAUTIFICATION AND PARK FACILITIES IMPROVEMENTS This section includes beautification projects and improvements to the City's park system and recreational facilities. There are six (6) projects in the CIP, which total $1,351,450. Special emphasis was given to upgrading existing park facilities. Policies The City's investment in improvements to the City park system is based on the following policies: Goal: Provide adequate and accessible parks and facilities to meet the recreational needs of all current and future residents. • Provide a variety of quality recreation facilities that will meet the needs of all age groups within the City and enhance the overall environmental characteristics of the area. • Maximize the utilization of all public facilities through the provision of variety in the type of facility offered. • Provide exercise/walking paths to enhance the physical well being of residents. • Provide recreational facilities on the basis of 2.75 acres per 1,000 population. • Encourage the integration of recreational facilities into the development of residential, commercial, industrial, and open space land uses. Goal: Update the five-year CIP on an annual basis. • Provide parks whereby residents have access to neighborhood parks within a 2 mile radius and community parks which serve the entire City. Goal: Increase Safety Standards • Provide for adequate security measure including limited access facilities. • Replace dangerous equipment and eliminate visual barriers to reduce criminal opportunities. • Employ vandal-resistant equipment and facilities. • Maintain a Parks Usage Plan to protect the City's investment in the park system and insure the residents' safety. Capital Improvement Program 2014-2019 Page 22 City of Aventura Goal: Protect and preserve environmentally sensitive land and water areas. • Preserve and enhance open space with environmental impact. Existing Facilities There is 32 acres of open space and public park land in the City. Aventura Founders Park was opened in November 1998. This 11 acre site located on West Country Club Drive and NE 190th Street includes both active and passive recreational opportunities. The park encompasses the following components: Splash pad, Jogging Path, tennis courts, gated entries, One ball field w/ dugouts and backstops, Restroom Buildings, Decorative Fencing, Playground, picnic area, passive play areas, baywalk, landscaping, two parking lots, multi-purpose plaza areas, signage, benches, and security lighting. Don Soffer Exercise/Walking Path contains 5.5 acres that is classified as open space recreation area. This facility is used by residents for both recreational and exercise purposes. Waterways Dog Park was acquired by the City in 1998 from a private developer. This 1.5 acre site was previously constructed by a private developer. The City converted this site to a dog park in 2008. Waterways Park was purchased in 2006. The 7 acre site that includes a multipurpose sports field, playground, basketball court, fitness trail, parking and restroom facilities was opened in 2008. Arthur I Snyder Memorial Park was purchased in 1998. This 3.5 acre site was one of the last remaining waterfront undeveloped parcels in the City. This site contains the Community/Recreation Center. Open passive and sitting areas are available at this location. Veterans Park was acquired by the City from a private developer in 2001. This 2 acre site is located on NE 31st Avenue. Facilities and amenities include: parking lot; 1.5 acre open playfield area; playground facilities; restroom facilities and landscaping with shade trees. This park was modified in 2008 by removing the dog play area and expanding the children's play area and adding a restroom facility. Prior Accomplishments The following projects have been completed or are scheduled for completion as of the 2013/14 fiscal year: Proiect Title Year Conceptual Design of Aventura Founders Park 1996/97 Design of Country Club Drive Exercise Safety Improvements 1996/97 Capital Improvement Program 2014-2019 Page 23 City of Aventura Purchase of 5.5 acres for Aventura Founders Park 1996/97 Bus Shelter & Bench Replacements 1996/97, 1997/98, 1998/99 1999/00, 2000/01, 2001/02 2005/06 Aventura Blvd Beautification Improvements 1997/98 Northern Entrance Beautification Improvements 1997/98 Aventura Founders Park Development 1997/98 Country Club Drive Exercise/Walking Path Improvements 1997/98 NE 183rd Street Beautification Improvements 1997/98 NE 34th Avenue Beautification Improvements 1997/98 Library Landscaping Project 1997/98 Huber Tract Open Space Land Purchase 1998/99 NE 207th Street Beautification Improvements 1998/99 Country Club Dr. Exercise Path Safety Improvements 1998/99, 2004/05, 2009/10 NE 190th Street Beautification Improvements 1998/99 Biscayne Boulevard Phase I Beautification Improvements 1998/99 FEC Landscape Buffer 1998/99 NE 191st Street Beautification Improvements 1998/99 Waterways Park Improvements 1999/00 Founders Park Improvements 1999/00, 2001/02, 2002/03 2003/04, 2005/06, 2010/11 2013/14 Biscayne Boulevard Phase II Beautification Improvements 1999/00 NE 185th Street & NE 28th Ave Beautification Improvements 1999/00 NE 213th Street Beautification Improvements 2001/02 Aventura Blvd. Entrance Features 2001/02 Community/Recreation Center Conceptual Design 2000/01 Community Recreation Center Development 2001/02 Expanded Waterways Park Purchase 2003/04 Biscayne Boulevard Phase II Beautification Improvements 2001/02 Country Club Drive Beautification Improvements 2002/03 Newspaper Racks 2002/03, 2003/04 NE 188th Street Beautification Improvements 2002/03 Yacht Club Way Beautification Improvements 2003/04 William Lehman Causeway Beautification Improvements 2003/04, 2004/05 Veterans Park Development 2003/04 Waterways Park Design 2005/06 Founders Park Parking Lot Expansion 2005/06 NE 207th Street Swale Beautification Improvements 2005/06 Waterways Park Development 2006/07, 2007/08 Splashpad Addition to Founders Park 2006/07 Miami Gardens Drive Beautification Improvements 2006/07 Waterways Dog Park Development 2007/08 Veterans Park Modifications & Improvements 2007/08, 2013/14 Entrance Features Upgrades 2010/11 Waterways Park Improvements 2013/14 Capital Improvement Program 2014-2019 Page 24 City of Aventura Park Facilities/Open Space Recreation The City's estimated current population is 37,239. The City's Comprehensive Plan recommended standard is 2.75 acres of park and recreation land for every 1,000 potential residents. The amount of park and recreation land required by the park standards for this population is 102 acres. In calculating the number of recreation acres the City has available for use by residents, public private, golf courses and marinas are accounted for at a different degree depending on accessibility to citizens of the City. Assuming that public facilities can be accounted for at 100%, private recreation facilities at 50%, and marinas and the golf course at 25%, the City existing and proposed recreation areas total 117. Therefore, no deficiency exists under the City's standards. Table PFOS1 contains an inventory of existing and proposed recreation and open space areas. The City owns 32 park/open space acres. Table PFOS 1 CITY OF AVENTURA Recreation/Open Space Inventory TYPE FACILITY ACRES APPLICABLE ACRES Public Recreation Areas C Don Soffer Exercise/Walking path 5.5 5.5 C Arthur I Snyder Memorial Park 3.5 3.5 N Veterans Park 2.0 2.0 N Waterways Park 7.0 7.0 N Waterways Dog Park 1.5 1.5 N NE 188th Street 1.5 1.5 N Aventura Founders Park 11.0 11.0 Public Recreation Subtotal 32.0 32.0 Private Recreation Areas Private Recreation Sites 63.61 31.81 Marina Complexes 9.40 2.35 Golf Courses 203.17 50.79 Private Recreation Subtotal 276.18 84.95 Total Recreation Areas 306.68 116.95 C = Community Park N = Neighborhood Park Funding Plan Funding for the proposed beautification and park facilities will be provided by the proceeds from the following revenue sources: Total Category Budget $1,351,450 Capital Improvement Program 2014-2019 Page 25 City of Aventura Funding: General Fund $371,500 Capital Projects Fund 980,000 Capital Improvement Program 2014-2019 Page 26 City of Aventura TABLE 1 PROPOSED BEAUTIFICATION AND PARK FACILITIES IMPROVEMENTS PROJECTS SCHEDULED FOR 2014/15-2018/19 SUMMARY BY YEAR CIP# Project Title Dept.# 2014/15 2015/16 2016117 2017/18 2018/19 Total BP1 Founders Park Improvements CS $ 28,000 $ 12,000 $ 30,000 $ 30,000 $ 35,000 $ 135,000 BP2 Waterways Park Improvements CS 14,000 - - - - 14,000 BP3 Veterans Park Improvements CS - - - 150,000 4,500 154,500 BP4 NE 188th Street Park Improvements CS 130,000 850,000 - - - 980,000 BP5 Exercise Trail Improvements CS - - - 10,400 10,600 21,000 BP6 City-wide Beautification Improvements CS 9,000 9,200 9,400 9,600 9,750 46,950 Totals $ 181,000 $ 871,200 $ 39,400 $ 200,000 $ 59,850 $ 1,351,450 TABLE 2 PROPOSED BEAUTIFICATION AND PARK FACILITIES IMPROVEMENTS PROJECTS SCHEDULED FOR 2014/15-2018/19 FUNDING PLAN Capital General CIP# Project Title Dept.# Total Projects Fund BP1 Founders Park Improvements CS $ 135,000 $ - $ 135,000 BP2 Waterways Park Improvements CS 14,000 - 14,000 BP3 Veterans Park Improvements CS 154,500 - 154,500 BP4 NE 188th Street Park Improvements CS 980,000 980,000 - BP5 Exercise Trail Improvements CS 21,000 - 21,000 BP6 City-wide Beautification Improvements CS 46,950 - 46,950 Totals 1,351,450 $ 980,000 $ 371,450 Capital Improvement Program 2014-2019 Page 27 City of Aventura PROPOSED PROJECTS 1 — CS Founders Park Improvements 2014/15 $28,000 2015/16 $12,000 2016/17 $30,000 2017/18 $30,000 2018/19 $35,000 This project consists of maintenance projects which replace and update equipment as well as enhancements to the existing features. 2014/15 Replace SplashPad Water Features 28,000 2015/16 Replace Office and Welcome Center Furniture 12,000 2016/17 Replace SplashPad Water Features 30,000 2017/18 Replace SplashPad Water Features 30,000 2018/19 Replace Sunpad Furniture 23,000 Replace SpalshPad Pumps 12,000 2-CS Waterways Park Improvements 2014/15 $14,000 This project consists of the following maintenance project. 2014/15 Replace Shade structure at Playground Area 14,000 3-CS Veterans Park Improvements 2017/18 $150,000 2018/19 $4,500 This project consists of maintenance projects which replace and update equipment as well as enhancements to the existing features. 2017/18 Replace Playground Equipment 150,000 2018/19 Replace Playground Equipment 4,500 Capital Improvement Program 2014-2019 Page 28 City of Aventura 4-CS NE 188th Street Park Improvements 2014/15 $130,000 2015/16 $850,000 This project consists of developing the 1.5 acre parcel on NE 188th Street into practice fields for ACES and additional park amenities based on input from the area residents. Parking for 16 parking spaces. 5-CS Exercise Trail Improvements 2017/18 $10,400 2018/19 $10,600 This project consists of replacing and upgrading chilled water fountains as follows: 2017/18 Replace 2 Water Fountains 10,400 2018/19 Replace 2 Water Fountains 10,600 6 - CS City-Wide Beautification Improvements 2014/15 $9,000 2015/16 $9,200 2016/17 $9,400 2017/18 $9,600 2018/19 $9,750 This project consists of replacing aging street furniture that is no longer useful. 2014/15 Purchase Trash Cans and Benches 9,000 2015/16 Purchase Trash Cans and Benches 9,200 2016/17 Purchase Trash Cans and Benches 9,400 2017/18 Purchase Trash Cans and Benches 9,600 2018/19 Purchase Trash Cans and Benches 9,750 Capital Improvement Program 2014-2019 Page 29 City of Aventura TRANSPORTATION, DRAINAGE AND INFRASTRUCTURE IMPROVEMENTS This section includes improvements to the City's transportation system, roadways, drainage system, sidewalks, pedestrian pathways, street lighting, transit and other infrastructure improvements. There are four (4) improvement projects in the Capital Improvement Program, which total $9,264,000. Special emphasis was given to improving traffic flow, street lighting, correcting drainage deficiencies and road resurfacing and addressing maintenance considerations. The projects outlined in this section have been developed based on a survey of all areas of the City, with respect to the improvement items, by the Community Services Department; City's consulting engineer and staff. The projects were prioritized according to the urgency of the improvements needed and age of the areas to be improved. Policies The City's investment in improvements to its transportation system, roads, sidewalks, street lighting and drainage system is based on the following policies: Goal: Utilize the Stormwater Utility Fund to provide revenue sources to fund drainage improvements contained in the CIP. • Coordinate area-wide storm water developments with major street improvements. • Provide adequate storm drainage as defined by present standards for different types of areas of the City. • Upgrade areas of the City to conform to present drainage standards to eliminate flood prone areas. Goal: Improve local roads to meet road safety requirements and serve the transportation needs of the City. • Systematically provide local street improvements throughout the City based upon the existing condition and age of the street and the cost of maintenance of the street. • Provide an adequate road transportation network that meets or exceeds the capacity rating outlined in the Comprehensive Plan. • Implement improvements to meet safety standards. • Improve safety by installing street lighting on all appropriate public roadways. • Provide walkways and sidewalks to improve the safety of residents traveling throughout the City. Capital Improvement Program 2014-2019 Page 30 City of Aventura • Accept the dedication of private roads throughout the City in accordance with the Policy governing the conversion of private roads to public roads as outlined in Resolution No. 97-05. Goal: Address traffic flow along the major roadways and intersections by implementing projects that create improvements to the system. • Implement the recommendations of the City's Traffic Advisory board and its Traffic consultant. Existing Facilities The following is a list of current public roads under the jurisdiction of the City: NE 185th Street NE 27th Court NE 28th Place NE 28th Avenue NE 29th Avenue NE 29th Court NE 29th Place NE 30th Avenue NE 34th Avenue NE 187th Street NE 188th Street NE 190th Street NE 191st Street NE 192nd Street NE 193rd Street Aventura Boulevard West Country Club Drive North Country Club Drive East Country Club Drive NE 201 Terrace NE 203rd Street NE 205th Street NE 206th Street NE 207th Street NE 208th Street NE 208th Terrace NE 209th Street NE 211th Street NE 213th Street NE 214th Terrace NE 214th Street NE 183rd Street Yacht Club Drive Turnberry Way NE 27th Court Prior Accomplishments Since the inception of the CIP, the following projects have been completed or are scheduled for completion as of the 2013/14 fiscal year: Project Title Year Country Club Drive Drainage Improvements 1996/97 Sidewalk Installation — Southside of Lehman Causeway 1996/97 Pedestrian Safety Study 1996/97 Aventura Boulevard Street Lighting Improvements 1997/98 NE 183rd Street & Drainage Improvements 1997/98 NE183rd Street Lighting Improvements 1997/98 NE 207th Street Lighting Improvements 1997/98 North Aventura Stormwater Collector (213th Street) 1997/98 Pedestrian Transportation Circulation Safety Improvements 1997/98 Capital Improvement Program 2014-2019 Page 31 City of Aventura NE 190th Street Lighting Improvements 1998/99 South Aventura Stormwater Collector 1998/99 Sidewalk Improvements & Replacements 1998/99, 1999/00, 2000/01 NE 34th avenue Street Lighting Improvements 1999/00 NE 185th Street & NE 28th Avenue Improvements 1999/00 Safety Improvements — Country Club Drive 1999/00 NE 30th Avenue Drainage Improvements 2000/01 NE 213th Street Lighting Improvements 2000/01 NE 34th Avenue Safety/Road Improvements 2000/01 Biscayne Lake Gardens Area Drainage Improvements 2001/02 NE 188th Street, Lighting & Drainage Improvements 2002/03 Country Club Drive Improvements 2002/03, 2012/13, 2013/14 NE 190TH Street Drainage Improvements 2002/03 Yacht Club way Drainage and Lighting Improvements 2003/04 NE 31st Avenue Decorative Street Lighting 2003/04 Extension of Lehman Causeway Westbound Service Road 2003/04 Illuminated Street Signs 2003/04 Hospital District NE 213TH Street Drainage Connector 2003/04 Hospital District North Collector 2004/05 NE 207th Street Resurfacing 2004/05 Traffic Video Monitoring Program 2004/05, 2005/06 Directional Signs 2004/05 Yacht Club Drive Seawall Improvements 2005/06 Miami Gardens Drive 2005/06 Aventura Boulevard Resurfacing 2005/06 NE 213th Street Outfall Drainage Improvement 2006/07 Miami Gardens Drive Extension and Street Lighting 2006/07 Ne 29th Avenue Street Lighting Improvements 2006/07 Yacht Club Drive Resurfacing 2006/07 Countdown Pedestrian Walkway Signals 2006/07 Traffic Video Monitoring Program — Phase I 2006/07 Traffic Video Monitoring Program — Phase II 2007/08 NE 29th Pace and Yacht Club Way Resurfacing 2007/08 NE 190th Street Drainage Improvements 2007/08 NE 209th Street/Biscayne Boulevard Traffic Improvements 2007/08 NE 187th Street Traffic Improvements 2007/08 NE 180th & NE 182nd Street/Biscay Boulevard Signage 2007/08 NE 199th Street/West Country Club Drive Turning Lane 2008/09 NE 190th Street Resurfacing 2008/09 NE 191St Street/Biscayne Boulevard Traffic Improvements 2008/09 NE 191st/29th Avenue Drainage Improvements 2008/09 Hospital District Resurfacing 2009/10 NE 183rd Street Resurfacing & Road Improvements 2009/10 Yacht Club Way Bridge Improvements 2009/10 Country Club Drive Bus Shelters 2010/11 NE 29th Avenue and NE 187th Street Resurfacing 2010/11 Capital Improvement Program 2014-2019 Page 32 City of Aventura NE 34th Avenue Street Resurfacing 2010/11 Biscayne Boulevard Street Light Upgrades Phase 1 2010/11 Biscayne Boulevard Street Light Upgrades Phase 2 2011/12 NE 185th/NE 31th Avenue, NE 188th Street and NE 191 Street Resurfacing 2011/12 Biscayne Boulevard Street Light Upgrades Phase 3 2012/13 Traffic Signal @ NE 185th Street & NE 28th Court 2012/13 Turning Lane at N. Country Club Drive and NE 34th Avenue 2012/13 Biscayne Boulevard Street Light Upgrades Phase 4 2013/14 Traffic Flow Improvements NE 185th Street 2013/14 Road. Drainage and Infrastructure Improvements The majority of the projects outlined herein can be also be classified as drainage improvements and road resurfacing in accordance with established maintenance schedules. Funding Plan Funding for the proposed roadway, drainage and infrastructure improvement projects will be provided by the following sources: Total Category Budget $9,264,000 Funding: Transportation Fund $5,274,000 Stormwater Utility Fund 2,490,000 Capital Projects Fund 1,500,000 Tables 1 and 2 showing these improvement projects and funding schedules are followed by detailed project descriptions. Capital Improvement Program 2014-2019 Page 33 City of Aventura TABLE 1 PROPOSED TRANSPORTATION,DRAINAGE AND INFRASTRUCTURE IMPROVEMENTS PROJECTS SCHEDULED FOR 2014/15-2018/19 SUMMARY BY YEAR CIP# Project Title Dept# 2014115 2015/16 2016/17 2017/18 2018119 Total TDI1 Stormwater Drainage Improvements CS $ 850,000 $ 1,040,000 $ 200,000 $ 200,000 $ 200,000 $ 2,490,000 TDI2 Road Resurfacing Program CS 1,010,000 1,270,000 333,000 417,000 266,000 3,296,000 TDI3 1VMS Upgrade CS 1,500,000 300,000 - - - 1,800,000 TDI4 Street Lighting Improvements CS 228,000 250,000 400,000 400,000 400,000 1,678,000 Totals $ 3,588,000 $ 2,860,000 $ 933,000 $ 1,017,000 $ 866,000 $ 9,264,000 TABLE 2 PROPOSED TRANSPORTATION,DRAINAGE AND INFRASTRUCTURE IMPROVEMENTS PROJECTS SCHEDULED FOR 2014/15-2018/19 FUNDING PLAN Stormwater Capital Utility General Transportatior Project CIP# Project Title Dept.# Total Fund Fund Fund Fund TDI1 Stormwater Drainage Improvements CS $ 2,490,000 $ 2,490,000 $ - $ - $ - TDI2 Road Resurfacing Program CS 3,296,000 - - 3,296,000 - TD13 1VMS Upgrade CS 1,800,000 - - 300,000 1,500,000 TD14 Street Lighting Improvements CS 1,678,000 - - 1,678,000 - Totals $ 9,264,000 $ 2,490,000 $ - $ 5,274,000 $ 1,500,000 Capital Improvement Program 2014-2019 Page 34 City of Aventura PROPOSED PROJECTS 1-CS Stormwater Drainage Improvements 2014/15 $850,000 2015/16 $1,040,000 2016/17 $200,000 2017/18 $200,000 2018/19 $200,000 Projects included provide for ongoing annual minor drainage improvements and include the cost of resurfacing the affected roadways. 2014/15 NE 29 Place Phase I (North) 500,000 NE 29 Place Phase II (South) 350,000 2015/16 NE 213th Street and NE 183rd Street Seawall 390,000 NE 191st Improvements 650,000 2016/17 Drainage Improvements 140,000 NE 188th Street and NE 190th Street Seawall Improvements 60,000 2017/18 Drainage Improvements 200,000 2018/19 Replace Country Club Drive Pump Station 95,000 Drainage Improvements 105,000 2-CS Road Resurfacing Program 2014/15 $1,010,000 2015/16 $1,270,000 2016/17 $333,000 2017/18 $417,000 2018/19 $266,000 This project consists of resurfacing roadways as determined by the City's maintenance standards and the Community Services Department. 2014/15 Biscayne Lake Gardens 145,000 (NE 29th Ct., 201th Terr, & 27th Ct.) NE 207th Street 565,000 NE 29 Place Phase I (North) 300,000 2015/16 NE 213th Street 335,000 NE 29 Place Phase II (South) 470,000 Yacht Club Way Bridge Repairs 215,000 NE 191st Street 250,000 Capital Improvement Program 2014-2019 Page 35 City of Aventura 2016/17 NE 27th Avenue 58,000 NE 28th Court between 185 and 187 Streets 53,000 NE 30th Avenue 168,000 NE 209th Street 54,000 2017/18 Yacht Club Drive 245,000 Mystic Point Drive 172,000 2018/19 NE 187th Street 145,000 NE 185th Street 121,000 3-CS Traffic Video Monitoring System 2014/15 $1,500,000 2015/16 $300,000 This project consists of upgrading the 10 year old TVMS equipment to state of art technology and expanding service by adding cameras at two location in the southern portion of the City. The TVMS program utilizes cameras at key intersections to allow for the Police Department to monitor and respond to traffic conditions. 4-CS Streetlight Improvements 2014/15 $228,000 2015/16 $250,000 2016/17 $400,000 2017/18 $400,000 2018/19 $400,000 2014/15 Plan Design for Street Lights on NE 30th Ave between NE 203th Street and NE 207th Street $50,000 NE 29 Place Street Lights Phase II (South) 178,000 2015/16 Construction of Street Lights on NE 30th Ave between NE 203th Street and NE 207 Street 250,000 2016/17 Retrofit Street Lighting with LED fixtures 400,000 2017/18 Retrofit Street Lighting with LED fixtures 400,000 2018/19 Retrofit Street Lighting with LED fixtures 400,000 Capital Improvement Program 2014-2019 Page 36 City of Aventura PUBLIC BUILDINGS AND FACILITIES IMPROVEMENTS Capital projects in this functional category include providing new facilities to serve City residents or improvements to existing facilities in the City. The CIP includes 3 projects totaling $198,000. Policies The City's investment in improvements to public buildings and operational facilities is based on the following policies: • Provide easily accessible services to City residents and adequate parking for City facilities. • Repair and maintain all buildings and facilities in proper order to increase life of said facilities. Existing Facilities Map 1 shows the location of the City's Government Center, and the Dade County Fire Rescue Station and Library Branch. Prior Accomplishments The following projects have been completed or are scheduled for completion as of the 2013/14 fiscal year: Project Title Year Government Center/Police Station Needs Assessment Study 1996/97 Government Center Land Purchase 1997/98 Design of Government Center/Police 1997/98 Construction of Government Center 1999/00, 2000/01 Purchase of Charter Elementary School Property 2001/02 Construction of Charter Elementary School 2002/03 Community Center Improvements 2003/04, 2004/05, 2006/07, 2007/08 Construction of Middle School Wing to Charter School 2004/05 Holiday Lighting for Government Center 2005/06 Design of Arts & Cultural Center 2007/08 Classroom Additions to Charter School 2008/09 Arts & Cultural Center Construction 2008/09, 2009/10 Government Center Chiller Replacements 2009/10 Police Department Office Improvement 2009/10 Government Center Security Equipment Upgrade 2010/11 Government Center Commission Chambers Video Upgrade 2010/11 Government Center Parking Expansion Design 2011/12 Government Center Parking Garage 2012/13 Capital Improvement Program 20144019 Page 37 City of Aventura Funding Plan Funding for the proposed Public Buildings Projects will be provided by the following sources: Total Category Budget $198,000 Funding: General Fund $106,000 Charter School Fund 92,000 Capital Improvement Program 2014-2019 Page 38 City of Aventura PROPOSED PUBLIC BUILDING AND FACILIITES IMPROVEMENTS PROJECTS SCHEDULED FOR 2014/15-2018/19 SUMMARY BY YEAR CIP# Project Title Dept. 2014115 2015116 2016117 2017118 2018119 Total PBF1 I-WAC Replacements CS $ - $ 30,000 $ 30,000 $ 42,000 $ 50,000 $ 152,000 PBF2 Community Recreation Center Improvements CS - - - - 31,000 31,000 PBF3 Police Comnu ications Center Improvements PD 15,000 - - - - 15,000 Totals $ 15,000 $ 30,000 $ 30,000 $ 42,000 $ 81,000 $ 198,000 TABLE 2 PROPOSED PUBLIC BUILDING AND FACILff ES IMPROVEMENTS PROJECTS SCHEDULED FOR 2014/15-2018/19 FUNDING PLAN Charter General CIP# Project Title Dept. Total Fund Fund PBF1 HVAC Replacements CS $ 152,000 $ 92,000 $ 60,000 PBF2 Community Recreation Center Improvements CS 31,000 - 31,000 PBF3 Police Communications Center Improvements PD 15,000 - 15,000 Totals $ 198,000 $ 92,000 $ 106,000 Capital Improvement Program 2014-2019 Page 39 City of Aventura PROPOSED PROJECTS 1 — CS HVAC Replacements 2015/16 $30,000 2016/17 $30,000 2017/18 $42,000 2018/19 $50,000 This project consists of replacing the air conditioning units at various City facilities. 2015/16 Replace 20 ton HVAC at Community Recreation Center $30,000 2016/17 Replace 20 ton HVAC at ACES $30,000 2017/18 Replace 30 ton HVAC at ACES $42,000 2018/19 Replace 12 ton HVAC at Community Recreation Center $30,000 Replace 2 8-ton HVAC at ACES 20,000 2 — CS Community Recreation Center Improvements 2018/19 $31,000 2018/19 Replace Gym Bleachers, Wall Padding and Curtain. 3— PD Police Communication Center Improvements 2014/15 $15,000 2014/15 Replace carpeting tiles in the Communication Center and EOC. Capital Improvement Program 2014-2019 Page 40 City of Aventura INFORMATION/COMMUNICATIONS TECHNOLOGY This functional category includes improvements to the City's information/communication systems, data processing and the automation of certain operations by utilizing the latest technology to enhance productivity and efficiency. There are 12 projects totaling $2,655,950. Policies The City's investment in communication and computer projects is based on the following policies: • Continue the implementation upgrade of the Management Information System for all key City operations to automate functions and improve efficiency and productivity. • Improve and maintain City-wide radio communications capabilities for Police operations. • Develop and maintain computerized capabilities of the various City departments and information systems. • Utilize the latest state-of-the-art technology including the use of the Internet for the delivery of services. • Maintain the E911 system to enhance police response times to emergencies. • Utilize the latest technology for education and teaching at the Charter School. Funding Plan Funding for the proposed Information Technology Projects will be provided by the following sources: Total Category Budget $2,655,950 Funding: General Fund $1,933,450 Charter School Fund 722,500 Capital Improvement Program 2014-2019 Page 41 City of Aventura TABLE 1 PROPOSED COMMUNICATIONS AND COMPUTERS EQUIPMENT PROJECTS SCHEDULED FOR 2014/15-2018/19 SUMMARY BY YEAR CIP# Project Title Dept.# 2014/15 2015/16 2016/17 2016/17 2017/18 Total ICT1 Police Computers Systems<$5000 PD $ 124,600 $ 116,100 $ 151,000 $ 142,000 $ 152,000 $ 685,700 ICT2 Central Computer System>$5000 IT 215,000 160,000 165,000 230,000 175,000 945,000 ICT3 Radios and E911 System PD 47,000 31,000 20,500 15,000 15,000 128,500 ICT4 Computer Equipment<$5000 ACES 97,000 104,500 102,000 109,000 105,000 517,500 ICT5 Computer Equipment>$5000 ACES 45,000 35,000 40,000 35,000 50,000 205,000 ICT6 Computer Equipment<$5000 IT 6,000 6,000 6,000 6,000 6,000 30,000 ICT7 Computer Equipment<$5000 F 2,000 6,000 2,000 3,000 2,000 15,000 ICT8 Computer Equipment<$5000 CM - 4,000 - - - 4,000 ICT9 Computer Equipment<$5000 CS 14,000 10,000 6,300 26,900 19,550 76,750 ICT10 Computer Equipment<$5000 CD 3,500 4,500 3,500 4,000 4,500 20,000 ICT11 Computer Equipment<$5000 AACC 6,500 2,000 6,000 6,000 5,000 25,500 ICT12 Computer Equipment<$5000 CC 3,000 - - - - 3,000 Totals $ 563,600 $ 479,100 $ 502,300 $ 576,900 $ 534,050 $ 2,655,950 TABLE 2 PROPOSED COMMUNICATIONS AND COMPUTERS EQUIPMENT PROJECTS SCHEDULED FOR 2014/15-2018/19 FUNDING PLAN Charter General School CIP 4 Project Title Dept.# Total Fund Fund ICT1 Police Computers Systems<$5000 PD $ 685,700 $ 685,700 - ICT2 Central Computer System>$5000 IT 945,000 945,000 - ICT3 Radios and E911 System PD 128,500 128,500 - ICT4 Computer Equipment<$5000 ACES 517,500 - 517,500 ICT5 Computer Equipment>$5000 ACES 205,000 - 205,000 ICT6 Computer Equipment<$5000 IT 30,000 30,000 - ICT7 Computer Equipment<$5000 F 15,000 15,000 - ICT8 Computer Equipment<$5000 CM 4,000 4,000 - ICT9 Computer Equipment<$5000 CS 76,750 76,750 - ICT10 Computer Equipment<$5000 CD 20,000 20,000 - ICT11 Computer Equipment<$5000 AACC 25,500 25,500 - ICT12 Computer Equipment<$5000 CC 3,000 3,000 - $ 2,655,950 $ 1,933,450 $ 722,500 Totals Capital Improvement Program 2014-2019 Page 42 City of Aventura PROPOSED PROJECTS 1 - PD Police Computers Systems < $5000 2014/15 $124,600 2015/16 $116,100 2016/17 $151,000 2017/18 $142,000 2018/19 $152,000 This project consists of purchasing computer equipment and software that utilizes the latest technology for the Police Department. 2014/15 Upgrades $ 5,000 Replace 25 Mobile Laptops 50,000 20 Desktop Computers 24,000 Vehicle Modems 5,600 Replace 2 Servers 10,000 20 Vehicle Printers 20,000 Key Track System 10,000 2015/16 Upgrades $ 5,000 Replace 25 Mobile Laptops 50,000 20 Desktop Computers 24,000 Vehicle Modems 5,600 Replace 1 Server 5,000 20 Vehicle Printers 15,000 Desktop Scanner 5,000 Color Printer 1,500 Replace Smart Board 5,000 2016/17 Upgrades $ 5,000 Replace 25 Mobile Laptops 50,000 20 Desktop Computers 24,000 Vehicle Modems 14,000 Replace 2 Server 10,000 20 Vehicle Printers 15,000 Desktop Scanner 2,000 EOC PCS 12,000 Laptop-Ruggized 4,000 Replace Smart Board 5,000 Key Track System 10,000 2017/18 Upgrades $ 5,000 Replace 25 Mobile Laptops 50,000 20 Desktop Computers 24,000 Vehicle Modems 28,000 Replace 2 Server 10,000 Capital Improvement Program 2014-2019 Page 43 City of Aventura 20 Vehicle Printers 15,000 Desktop Scanners 5,000 Replace Smart Board 5,000 2018/19 Upgrades $ 5,000 Replace 25 Mobile Laptops 50,000 20 Desktop Computers 24,000 Vehicle Modems 28,000 Replace 2 Server 10,000 20 Vehicle Printers 15,000 Desktop Scanners 5,000 Replace Smart Board 5,000 Key Track System 10,000 2 - IT Central Management Information System > $5000 2014/15 $215,000 2015/16 $160,000 2016/17 $165,000 2017/18 $230,000 2018/19 $175,000 This project consists of purchasing new and replacement computer hardware and software that utilize the latest technology for the City's general information management system, which is used by all City Departments. 2014/15 Software/Licenses/Upgrades $15,000 Servers/ Security/UPS/Switches 70,000 AS 400 Upgrades 5,000 Upgrade Phone System 25,000 TVMS Equipment Upgrades 50,000 LaserFiche Upgrade 50.000 2015/16 Software/Licenses/Upgrades $20,000 Servers/ Security/UPS/Switches 60,000 AS 400 Upgrades 5,000 Upgrade Phone System 5,000 Upgrade Video System Solution 10,000 TVMS Equipment Upgrades 60,000 2016/17 Software/Licenses/Upgrades $20,000 Servers/ Security/UPS/Switches 80,000 AS 400 Upgrades 5,000 Upgrade Phone System 10,000 TVMS Equipment Upgrades 50,000 2017/18 Software/Licenses/Upgrades $20,000 Servers/ Security/UPS/Switches 85,000 Capital Improvement Program 2014-2019 Page 44 City of Aventura AS 400 Upgrades 50,000 Upgrade Phone System 10,000 TVMS Equipment Upgrades 50,000 Equipment for Redundant Site 15,000 2018/19 Software/Licenses/Upgrades $20,000 Servers/ Security/UPS/Switches 70,000 AS 400 Upgrades 5,000 Upgrade Phone System 15,000 TVMS Equipment Upgrades 65,000 3 - PD Radios and E911 System 2014/15 $47,000 2015/16 $31,000 2016/17 $20,500 2017/18 $15,000 2018/19 $15,000 This project consists of upgrading the equipment for the 800 Mhz police radio system to ensure a state-of-the-art system and maintain the E911 system. 2014/15 E911 System Upgrades 15,000 7 Mobile Radios 32,000 2015/16 E911 System Upgrades 15,000 2 Handheld & 2 Mobile Radios 16,000 2016/17 E911 System Upgrades 15,000 2 Handheld Radios 5,500 2017/18 E911 System Upgrades 15,000 2018/19 E911 System Upgrades 15,000 4 -ACES Computer Equipment < $5,000 2014/15 $97,000 2015/16 $104,500 2016/17 $102,000 2017/18 $109,000 2018/19 $105,000 This project consists of the regular replacement of the computers, laptops, servers and network infrastructure at the Aventura City of Excellence School. 2014/15 Replace 85 Computers/laptops 93,500 Replace Color Laser Printer 3,500 2015/16 Replace 80 Computers/Laptops 88,000 Capital Improvement Program 2014-2019 Page 45 City of Aventura 21 Tablet Computers 10,500 Mobile Learning Computer Lab 5,000 Replace Desktop Scanner 1,000 2016/17 Replace 80 Computers/Laptops 88,000 21 Tablet Computers 10,500 Replace Color Laser Printer 3,500 2017/18 Replace 85 Computers/Laptops 93,500 21 Tablet Computers 10,500 Mobile Learning Computer Lab 5,000 2018/19 Replace 85 Computers/Laptops 93,500 21 Tablet Computers 10,500 Replace Desktop Scanner 1,000 5 - ACES Computer Equipment > $5000 2014/15 $45,000 2015/16 $35,000 2016/17 $40,000 2017/18 $35,000 2018/19 $50,000 This project consists of the regular replacement of the computers and network infrastructure at the Aventura City of Excellence School that exceeds $5,000. 2014/15 Replace Network Switches and Routers 10,000 Phone system Upgrade 15,000 Replace AV equipment and/or Smart boards 20,000 2015/16 Replace Network Switches and Routers 15,000 Replace AV equipment and/or Smart boards 20,000 2016/17 Replace Network Switches and Routers 10,000 Replace 2 Servers 10,000 Replace AV equipment and/or Smart boards 20,000 2017/18 Replace Network Switches and Routers 10,000 Phone System Upgrade 5,000 Replace AV equipment and/or Smart boards 20,000 2018/19 Replace Network Switches and Routers 10,000 Replace AV equipment and/or Smart boards 40,000 6 - IT Computer Equipment < $5000 Capital Improvement Program 2014-2019 Page 46 City of Aventura 2014/15 $6,000 2015/16 $6,000 2016/17 $6,000 2017/18 $6,000 2018/19 $6,000 This project includes the replacement of existing equipment for the various employees of the department. 7 - F Computer Equipment < $5000 2014/15 $2,000 2015/16 $6,000 2016/17 $2,000 2017/18 $3,000 2018/19 $2,000 This project includes the replacement of existing equipment for the various employees of the department. 8 - CM Computer Equipment < $5000 2015/16 $4,000 This project consists of upgrading computer equipment in the Office of the City Manager. 9 - CS Computer Equipment < $5000 2014/15 $14,000 2015/16 $10,000 2016/17 $6,300 2017/18 $26,900 2018/19 $19,550 • This project consists of purchasing and upgrading computer equipment in the Community Services Department and Community Recreation Center. 2014/15 Upgrade Visitor ID System $5,000 4 Computers 4,000 Replace 1 ID Printer 4,000 Upgrade GIS Software 1,000 2015/16 Replace 5 Computers $5,000 Replace 1 ID Printer 4,000 Upgrade GIS Software 1,000 2016/17 Replace 4 Computers $4,000 Replace Laptop 1,300 Upgrade GIS Software 1,000 Capital Improvement Program 2014-2019 Page 47 City of Aventura 2017/18 Replace 5 Computers $5,000 Replace CRC Server 4,000 Replace HVAC Computer 4,000 Upgrade GIS Software 1,000 Replace 6 CRC Computers 9,900 Replace CRC Server 3,000 2018/19 4 Computers $4,000 Replace 6 CRC Computers 8,250 Replace 1 Laptop 1,300 Replace 1 Plotter 6,000 10 - CD Computer Equipment < $5000 2014/15 $3,500 2015/16 $4,500 2016/17 $3,500 2017/18 $4,000 2018/19 $4,500 This project consists of computer upgrades, replacement printers and the implementation of field computers for code compliance and building inspections for the Community Development Department. 2014/15 Replace 3 Computers $3,000 Replace 1 Laserjet Printers 500 2015/16 Replace 3 Computers $3,000 Replace Laserjet Printers 500 Replace Desktop Scanner 1,000 2016/17 Replace 3 Computers $3,000 Replace 1 Laserjet Printers 500 2017/18 Replace 3 Computers $3,000 Replace 2 Laserjet Printers 1,000 2018/19 Replace 3 Computers $3,000 Replace 1 Laserjet Printers 500 Replace Desktop Scanner 1,000 11 -AACC Computer Equipment < $5000 2014/15 $6,500 2015/16 $2,000 2016/17 $6,000 2017/18 $6,000 2018/19 $5,000 Capital Improvement Program 2014-2019 Page 48 City of Aventura This project consists of purchasing and upgrading computer equipment in the Arts & Cultural Center. 2014/15 Upgrade Point of Sale System 6,500 2015/16 Replace Laptop/tablets 2,000 2016/17 Replace 4 Computers 4,000 Replace Network Switches 2,000 2017/18 Replace 2 Laptop/tablets 4,000 Replace Color Laser Printer 2,000 2018/19 Replace 4 Computers/laptops 5,000 12 - CC Computer Equipment < $5000 2014/15 $3,000 This project consists of upgrading and replacing computer equipment in the City Clerk's Office. Capital Improvement Program 2014-2019 Page 49 City of Aventura CAPITAL EQUIPMENT PURCHASES AND REPLACEMENTS This section includes projects relating to Capital Equipment Purchases and Replacements for all operating departments. There are a total of 7 projects totaling $3,421,500. Policies The City's investment in capital equipment purchases and replacements is based on the following policies: Goal: Provide capital equipment that will meet the needs of all departments in order to maintain the efficiency and productivity of providing municipal services to the City's residents. • Replace all present equipment that is required when they become unusable, unsafe or when maintenance costs outweigh the total cost of replacement. • Develop and maintain an "Equipment Evaluation and Replacement Guide" to determine replacement schedules and costs. • Purchase more economical, fuel efficient and multi-functional vehicles. • Purchase new equipment that will increase productivity and reduce personnel and maintenance costs. • Maintain all City assets at a level adequate to protect the City's capital investment and to minimize future maintenance and replacement costs. Proposed Capital Equipment Purchase And Replacement Most projects outlined in the 2014/15 to 2018/19 Capital Improvement Program are either pertaining to vehicles or operational equipment. Detailed project descriptions and a funding schedule follow. The CIP guidelines provide that capital equipment shall be defined as having a useful life of more than one year and a value of $5,000 or more. Equipment that has a value of $5,000 or less is also included in this document for budgetary purpose. Funding Plan Funding for the proposed Capital Equipment Purchase and Replacement Projects will be provided by annual appropriations from the General Fund: Capital Improvement Program 2014-2019 Page 50 City of Aventura PROPOSED CAPITAL EQUIPMENT PURCHASE AND REPLACEMENT PROJECTS SCHEDULED FOR 2014/15-2018/19 SUMMARY BY YEAR CIP# Project Title Dept.# 2014/15 2015/16 2016/17 2017/18 2018/19 Total CE1 Vehicle Purchase&Replacements PD $ 471,000 $ 439,000 $ 497,000 $ 497,000 $ 448,000 $ 2,352,000 CE2 Equipment Purchase and Replacement>5000 PD 94,000 93,000 109,500 122,000 124,000 542,500 CE3 Equipment Purchase and Replacement<5000 PD 29,850 34,560 38,860 14,900 60,000 178,170 CE4 Equipment Purchase and Replacement>5000 CS 31,000 50,000 42,000 14,000 28,000 165,000 CE5 Equipment Purchase and Replacement<5000 CS 23,800 11,300 7,300 1,750 9,750 53,900 CE6 Equipment Purchase and Replacement>5000 AACC 27,780 15,050 37,400 20,700 9,000 109,930 CE7 Equipment Purchase and Replacement>5000 CD - 20,000 - - - 20,000 Totals $ 677,430 $ 662,910 $ 732,060 $ 670,350 $ 678,750 $ 3,421,500 TABLE 2 PROPOSED CAPITAL EQUIPMENT PURCHASE AND REPLACEMENT PROJECTS SCHEDULED FOR 2014/15-2018/19 FUNDING PLAN General CIP# Project Title Dept.# Total Fund CE1 Vehicle Purchase&Replacements PD $ 2,352,000 $ 2,352,000 CE2 Equipment Purchase and Replacement>5000 PD 542,500 542,500 CE3 Equipment Purchase and Replacement<5000 PD 178,170 178,170 CE4 Equipment Purchase and Replacement>5000 CS 165,000 165,000 CE5 Equipment Purchase and Replacement<5000 CS 53,900 53,900 CE6 Equipment Purchase and Replacement>5000 AACC 109,930 109,930 CE7 Equipment Purchase and Replacement>5000 CD 20,000 20,000 Totals $ 3,421,500 $ 3,421,500 Capital Improvement Program 2014-2019 Page 51 City of Aventura PROPOSED PROJECTS 1 - PD Vehicle Purchase & Replacements 2014/15 $471,000 2015/16 $439,000 2016/17 $497,000 2017/18 $497,000 2018/19 $448,000 This project consists of purchasing police vehicles to accommodate new employee additions and establish a vehicle replacement program in the Police Department. 2014/15 Replace 9 patrol vehicles $324,000 Replace 2 Traffic Vehicles 72,000 Replace K-9 Vehicle 40,000 Replace 1 Crime Scene Van 35,000 2015/16 Replace 10 Patrol Vehicles $364,000 Replace 1 Crime Prevention Van 35,000 Replace K-9 Vehicles 40,000 2016/17 Replace 11 Patrol Vehicles $426,000 Replace Crime Scene Van 35,000 Replace 1 Traffic Vehicle 36,000 2017/18 Replace 11 Patrol Vehicles $411,000 Replace Prisoner Van 40,000 Replace Crime Prevention Trailer 10,000 Replace 1 Traffic Vehicle 36,000 2018/19 Replace 10 Patrol Vehicles $378,000 Replace Traffic Truck 30,000 Replace K-9 Vehicles 40,000 2 - PD Equipment Purchase and Replacement > $5000 2014/15 $94,000 2015/16 $93,000 2016/17$109,500 2017/18 $122,000 2018/19 $124,000 This project consists of purchasing equipment for the Police Department. The following is a breakdown of the items to be replaced: 2014/15 10 Vehicle Equipment $74,000 K-9 Vehicle Equipment 10,000 Crime Scene Van Equipment 10,000 Capital Improvement Program 2014-2019 Page 52 City of Aventura 2015/16 10 Vehicle Equipment $66,000 Crime Scene Van Equipment 5,000 K-9 Vehicle Equipment 10,000 Message Board 12,000 2016/17 12 Vehicle Equipment $83,500 Traffic Vehicle Equipment 16,000 Crime Scene Van Equipment 10,000 2017/18 11 Vehicle Equipment $77,000 Replace Segway 10,000 Prisoner Van Equipment 25,000 Crime Scene Equipment 10,000 2018/19 11 Vehicle Equipment $78,000 Replace Segway 11,000 Replace In-Car Video 35,000 3 - PD Equipment Purchase and Replacement < $5000 2014/15 $29,850 2015/16 $34,560 2016/17 $38,860 2017/18 $14,900 2018/19 $60,000 2014/15 Replace 10 Ballistic Vests $12,000 Site Block 4 Panel unit 2,750 6 Tasers 8,100 Digital Camera 3,000 K-9 Supplies 4,000 2015/16 Replace 10 Ballistic Vests $12,360 12 Tasers 16,200 Replace 2 Digital Cameras 6,000 2016/17 Replace 10 Ballistic Vests $12,360 10 Tasers 13,500 AR Rifles 10,000 Optics for AR 3,000 2017/18 Replace 10 Ballistic Vests $12,500 Dive Equipment 2,400 2018/19 Replace 10 Ballistic Vests $12,500 2 Laser Units 4,000 6 Tasers 8,000 Capital Improvement Program 2014-2019 Page 53 City of Aventura Dive Equipment 2,500 Optics for AR 3,000 10 Swat Vests 30,000 4 - CS Equipment Purchase and Replacement > $5,000 2014/15 $31,000 2015/16 $50,000 2016/17 $42,000 2017/18 $14,000 2018/19 $28,000 This project consists of the replacement of equipment that has become inefficient, defective, or unusable and to add new equipment to provide improved services in the Community Services Department. The following is a breakdown of the items to be purchased: 2014/15 Replace 2 Ellipticals 11,000 Replace Pickup Truck 20,000 2015/16 Replace Hybrid Utility Vehicle $30,000 Replace Pickup Truck 20,000 2016/17 Replace 2 Treadmill $12,000 Replace Hybrid Utility Vehicle 30,000 2017/18 1 Electric Low Speed Vehicles 14,000 2018/19 2 Electric Low Speed Vehicles 28,000 5 - CS Equipment Purchase and Replacement < $5,000 2014/15 $23,800 2015/16 $11,300 2016/17 $7,300 2017/18 $1,750 2018/19 $9,750 This project consists of the replacement of equipment that has become inefficient, defective, or unusable in the Community Recreation Center. The following is a breakdown of the items to be replaced: 2014/15 Replace 40 Chairs $3,500 Replace AV Equipment 10,000 Replace Lobby Furniture 5,500 Replace 2 Tents 1,800 Replace Sports Fencing Panels 3,000 2015/16 Replace 12 Tables $2,500 Replace Stair Climber 4,000 Replace Sports Fencing Panels 3,000 Capital Improvement Program 2014-2019 Page 54 City of Aventura Replace 2 Tents 1,800 2016/17 Replace 1 Recumbent Bicycle $2,500 Replace Sports Fencing Panels 3,000 Replace 2 Tents 1,800 2017/18 Replace Stair Climber $1,750 2018/19 Replace 10 Tables $1,750 Replace 40 Charis 3,000 Replace 2 Soccer Goals 5,000 6 -AACC Equipment Purchase and Replacement > $5,000 2014/15 $27,780 2015/16 $15,050 2016/17 $37,400 2017/18 $20,700 2018/19 $9,000 This project consists of purchasing equipment for the Arts & Cultural Center: 2014/15 Microphones $2,800 Additional Sound & Lighting Equipment 5,120 Upright Piano 13,500 Chairs & Storage 3,360 2015/16 Additional Lighting Equipment $5,000 Headset Replacement 6,850 Lobby Chair Replacement 3,200 2016/17 ADA Listening Devices $2,400 Seachangers for Stage Lighting 35,000 2017/18 Replacement of Lobby Furniture 20,700 2018/19 Replacement of Music Stands 3,000 Replacement of Stage Monitors 6,000 7 - CD Equipment Purchase and Replacement > $5,000 2015/16 $20,000 This project consists of the addition of equipment or the replacement of equipment that has become inefficient, defective, or unusable in the Community Development Department. The following is a breakdown of the items to be replaced: 2015/16 Pickup Truck $20,000 Capital Improvement Program 2014-2019 Page 55 City of Aventura a.. W. ' .,,,;;* ':,f:51C":. 1:::.% 44C 11 414'4' . :it).:49 t 4 1 44 1 t f, tit k ,r tif ��' : "mo �'' H 4 ��� i P il&c:450,11P 4 5 , Capital Improvement Program 2014-2019 Page 56