2014-26 RESOLUTION NO. 2014-26 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF AVENTURA, FLORIDA APPROVING AND AUTHORIZING THE CITY MANAGER TO EXECUTE AND OTHERWISE ENTER INTO THE ATTACHED CHANGE ORDER FOR BID NO. 13-04- 05-02, BISCAYNE BOULEVARD STREET LIGHTING IMPROVEMENTS PHASE 3 BY AND BETWEEN THE CITY AND HORSEPOWER ELECTRIC, INC.; AUTHORIZING THE CITY MANAGER TO DO ALL THINGS NECESSARY TO CARRY OUT THE AIMS OF THIS RESOLUTION; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, design of the Biscayne Boulevard Decorative Street Lighting Improvements project requires light pole bases to be installed at the back of sidewalk on the east Right-of-Way line; and WHEREAS, use of the standard cylindrical light pole bases are in direct conflict with existing underground utilities located on the east Right-of Way line; and WHEREAS, staff has determined that use of shallow spread footers in lieu of standard cylindrical light pole bases will avoid the conflicts; and WHEREAS, the City Commission, upon recommendation of the City Manager, is therefore desirous of approving said change order to said Phase III contractor. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF AVENTURA, FLORIDA: Section 1: That the City Manager is hereby authorized to execute and otherwise enter into the Change Order for Bid No. 13-04-05-02, Biscayne Boulevard Decorative Street Lighting Improvements Phase III, by and between the City and Horsepower Electric, Inc., attached hereto and incorporated herein as specifically as if set forth at length herein. Said Change Order amount is $67,878. Section 2: That the City Manager is hereby authorized to do all things necessary to carry out the aims of this Resolution. Section 3: That this Resolution shall become effective immediately upon its adoption. The foregoing Resolution was offered by Vice Mayor Joel, who moved its adoption. The motion was seconded by Commissioner Holzberg, and upon being put to a vote, the vote was as follows: Commissioner Enbar Cohen absent Commissioner Teri Holzberg yes Commissioner Michael Stern yes Commissioner Howard Weinberg yes Commissioner Luz Urbaez Weinberg yes Vice Mayor Billy Joel yes Mayor Susan Gottlieb yes Resolution No. 2014-26 Page 2 PASSED AND ADOPTED this 3rd day of June, 2014. 1 � Li x1 SUSAN GOTTLIEB, MAYOR A EST: I'ESA M.4' o KA, MMC • CLER' APPROV D AS O LEGA SUFFI IENCY: v CITY ATTORNEY April 29,2014 Mr.Antonio F.Tomei Capital Projects Manager City of Aventura 19200 West Country Club Drive Aventura, Florida 33180 RE: BISCAYNE BOULEVARD DECORATIVE LIGHTING PHASE IV CT&A PROJECT NO. 01-0103.164 Dear Mr.Tomei: CRAVEN 1HOMPSON We are in receipt of Horsepower Electric, Inc. request for change order on the above referenced project. Originally Horsepower requested thirty-one (31) spread footings for Phase IV. After numerous onsite meetings and investigation we have been able to reduce the number to fourteen (14) foundations. Based on the reduction their total request is for$67,878.00 which is for the installation of fourteen (14) poured in place spread footings in lieu of the conventional pole foundations. Due to no easements and conflicts with the water main, FPL &A$$OCIPIE$ INC. the transmission lines and AT&T fiber optics there is no location that the pole foundations can be placed in the ROW. Also included is the design fees Engineers for the spread footings. Planners Surveyors Based on the above we would recommend approval in the amount of Landscape Architects $67,878.00 to the above referenced contract. Should you have any questions or need additional information please let me know. Sincerely, CRAVEN THOMPSON&ASSOCIATES, INC. Don A.Shaver Director of Construction Management DAS/wg Enclosures Cc; Adolfo Gonzalez, P.E., CTA N:\clerial\JOBS\2001\01-0103-CityOfAventura\01-0103 City Projects\01-0103-164 Biscayne Blvd Decorative Lights Phase 3\Construction Phase\Change Orden\Itomei04292014.doc 3563 N.W.53rd Street Fort Lauderdale,FL 33309-6311 (954)739-6400 Fax(954)739-6409 HORSEPOWER ELECTRIC, INC. 8105 West 20th Avenue,Hialeah,Florida 33014-3231 TEL(305)819-4060 FAX(305)819-4222 April 28,2014 Mr.Antonio F. Tomei Capital Projects Manager City of Aventura 19200 West Country Club Drive Aventura FL 33180 RE: Biscayne Blvd Street Lighting Phase IV Project Mr. Tomei, Our company is experiencing unforeseen utility conflicts affecting 14 pole locations on Phase IV. We have exhausted everything we can do;from meeting with the utility companies to performing soft digs,to physically locating these underground facilities. There are 14 poles in Phase IV in conflict with AT&T and a water main. Due to the utility conflicts,there is no space free of utilities to install these 14 poles as per the foundation details on plan sheets El9 and E20. These poles will require a special shallow spread footer type foundation. There is a substantial cost difference between the standard foundation detailed on the plans and the special spread footer type foundation. The costs are as follows: Construction&Engineering Costs: • Spread Footer-type foundation$ 5,467.00/ea. • Credit for Standard foundation($940.00)/ea. • Difference per foundation$4,527.00/ea. • Construction Total amount will be 14 X$4,527.00= $63,378.00 • Engineering Fees$4,500.00 • Total Change Order request$67,878.00 We are requesting compensation for the difference between the standard foundation and the special spread footer type foundation due to the unforeseen conditions. We will also need an additional 60 calendar days added to the contract for the additional work. Should you have any questions,please feel free to contact me. Sincerely, 'C' Michael M z President "PRIDE IN QUALITY" CITY OF AVENTURA '" `t` CHANGE ORDER FORM CHANGE ORDER NO.3 of CONTRACT NUMBER: 13-04-05-02 DATE: 04/29/2014 PROJECT TITLE: BISCAYNE BOULEVARD DECORATIVE LIGHTING UPGRADES PHASE IV PROJECT CONTRACTOR:HORSEPOWER ELECTRIC,INC. COST:$67,878.00 BUDGET LINE ITEM: 001-8050-541-6307 DESCRIPTION OF CHANGES:Due to limited Right-of-Way,no easements and unforeseen utility conflicts with the water main and AT&T Fiber Optics fourteen (14) pole foundations will need to be changed from conventional precast footing to poured in place spread footings within the Phase 4 limits. Original Contract: $ 489.489.00 Total Previous Change Orders: $ 929,516.75 This Change Order: $ 67.878.00 Revised Contract Amount: $1,486,883.75 Total Change Orders to Date: 3 Contract Amount Before This Change: $1,419,005.75 Total Change in Contract Period: 60 Calendar Days The sum of$67,878.00 is hereby added to the Contract price,and the total adjusted Contract price to date thereby is $1.486.883.75.The time provided for completion of the Contract will be increased by 60 calendar days.This document shall become an amengt5ent to the Contract and all provisions of the Contract will apply thereto. /1 Recommended by -' 1S �l L...--/ Consultant-Craven Thompso &Associates Date Recommended by Thompso 5-F- IL/ Y Capital Projects Manager Date Recommended for Budgetary Purposes: Finance Support Services Director Date Approved by City Manager Date Accepted by Contractor-Horsepower Electric, Inc. Date