Loading...
2014-03RESOLUTION NO. 2014 -03 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF AVENTURA, FLORIDA AWARDING AND LETTING A BID /CONTRACT FOR BID NO. 13- 11 -22 -2, CITY OF AVENTURA MAINTENANCE AND REPAIR FOR CITY ROADS, STREETS AND FACILITIES TO JVA ENGINEERING CONTRACTOR, INC., MAGNA CONSTRUCTION, INC., AND WEEKLEY ASPHALT PAVING, INC. AT THE INDIVIDUAL BID PRICES AS CONTAINED IN EXHIBIT "A" ATTACHED; AUTHORIZING THE CITY MANAGER TO EXECUTE ASSOCIATED CONTRACTS; AUTHORIZING THE CITY MANAGER TO TAKE NECESSARY AND EXPEDIENT ACTION TO CARRY OUT THE AIMS OF THIS RESOLUTION; PROVIDING FOR THE APPROPRIATION AND ALLOCATION OF FUNDS FOR SAID BID AWARD; AND PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the City Manager of the City of Aventura, Florida, has, pursuant to the various laws of the State of Florida and the Code of the City of Aventura, properly solicited and accordingly accepted bids for BID NO. 13- 11 -22 -2 CITY OF AVENTURA MAINTENANCE AND REPAIR FOR CITY ROADS, STREETS AND FACILITIES, and WHEREAS, sealed bids have been submitted to and received by the City pursuant to the City's Invitation to Bid /Notice to Bidders, specifications, proposals, and requirements for the project/work as cited above, and WHEREAS, staff has determined that JVA Engineering Contractor, Inc., Magna Construction, Inc. and Weekley Asphalt Paving, Inc., have submitted the lowest responsible and responsive bids for said project/work-, and WHEREAS, the City Commission, upon the recommendation of the City Manager, is therefore desirous of awarding said bid /contract to said lowest responsible and responsive bidders. NOW THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF AVENTURA, FLORIDA: Section 1: That bid /contract for BID NO. 13- 11 -22 -2, CITY OF AVENTURA MAINTENANCE AND REPAIR WORK FOR CITY ROADS, STREETS AND FACILITIES is hereby awarded to JVA Engineering Contractor, Inc., Magna Construction, Inc., and Weekley Asphalt Paving, Inc., at the bid prices as contained in Resolution No. 2014- 03 Page 2 Exhibit "A ", attached. Section 2: The City Manager is hereby authorized to execute, on behalf of the City, a contract by and between the parties embodying the terms, conditions, specifications as set forth in the subject Invitation to Bid /Notice to Bidders, bid specifications, bid proposal and bid requirements, and said parties shall execute said prepared contracts on behalf of the City. Section 3: That the City Manager is hereby authorized and requested to take all necessary and expedient action to carry out the aims of this Resolution in awarding this bid /contract. Section 4: That the funds to be allocated and appropriated pursuant hereto and for the purpose of carrying out the tenets of this Resolution shall be from the Transportation and Street Maintenance Fund Line Item No. 120 - 5001 - 541 -6305 and the Stormwater Utility Fund Line Item No. 410 - 5001 - 538 -3460. Section 5: This Resolution shall be effective immediately upon its adoption. The foregoing Resolution was offered by Vice Mayor Weinberg, who moved its adoption. The motion was seconded by Commissioner Joel, and upon being put to a vote, the vote was as follows: Commissioner Enbar Cohen yes Commissioner Teri Holzberg yes Commissioner Billy Joel yes Commissioner Michael Stern yes Commissioner Luz Urbaez Weinberg yes Vice Mayor Howard Weinberg yes Mayor Susan Gottlieb yes Resolution No. 2014-03 Page 3 PASSED AND ADOPTED this 4th day of February, 2014. SOS GOTTLIEB, MAYOR ATTEST: APPROVED AS TO LEGAL SUFFIMNCY: CITY ATTORNEY CITY OF AVENTURA EXHIBIT "A" Maintenance and Repair for City Roads, Streets, and Facilities Bid Tabulation for Bid No. 13- 11 -22 -2 (lowest line item price is highlighted in yellow) JVA Engineering Weekley Asphalt Paving, r„m- f tn,- "u > r.. Item Estimated Quantity Description P Unit Percentage of Total Project Percentage of Total Project Percentage of Total Project Unit Price Extended Price GENERAL CONDITIONS AND MOBILIZATION MAINTENANCE OF TRAFFIC 1 1 General Conditions and Mobilization Costs For Jobs Totaling_____FLS 125% 50% 100 $2,499 or Less 1 Furnish and Install SteelTraffc Plates for 12-Foot Wde Traffic EA $ 2 1 'General Conditions and Mobilization Costs For Jobs Ranging from 100% 1' 50% 50% 1,500.00 $ 1.500.00 $2,500- $4,999 LS 'Lane - Daily Rate 3 1 General Conditions and Mobilization Costs For Jobs Ranging from LS 30 % 30% 30% 6 $5,000- $24,999 Furnish and Install SteelTraffic Plates for 12 -Foot Wide Traffic EA $ 100.00 $ 4 1 General Conditions and Mobilization Costs For Jobs Totaling _255.0o 25% 15% 20 $25.000 or More Item Estimated Quantity Description P Unit Unit Price Extended Price Unit Price Extended Price Unit Price Extended Price MAINTENANCE OF TRAFFIC 5 1 Furnish and Install SteelTraffc Plates for 12-Foot Wde Traffic EA $ 75.66--s 75.00 $ 058 0 $ 85.00 $ 1,500.00 $ 1.500.00 'Lane - Daily Rate 6 1 Furnish and Install SteelTraffic Plates for 12 -Foot Wide Traffic EA $ 100.00 $ 100.00. $ 255.00 __V _255.0o S 3,800.00 -s3 86-oo-0 Lane - Weekly Rate 7 10 Type I Barricade per FDOT Standard Index No 606- Provide for EA �1 $ 0.50 $ 5.00 S 65.00 $ 650.00 , $ 10.00 $ 100.00 Project Duration - Up to 14 Days' 8 10 Type I Bamcade per FDOT Standard Index No 600 - Provide for EA $ 0.45 $ -4,50$ ', 35.00 $ 350.00. $ 30.00 $ 300.00 Project Duration - Up to 30 Days 9 10 iType II Bamcade per FDOT Standard Index No. 600 - Provide for EA $ 0.50 $ 5.00 $ 65.00 $ 6K 0-0$ 10.00 $ 100.00 Project Duration - Up to 14 Days 10 1 10 Type II Bamcade per FDOT Standard Index No 600 - Provide for EA $ 0.45 $ 4.50 $ 15.00 $ 150.00', $ 30.00 $ 300.00 Project Duration - Up to 30 Days 11 10 Type III Barricade per FDOT Standard Index No 600 - Provide for EA $ 0.50 $ 5.005A0 $ 15$ 15.00 $ 150.00. $ 20.00 $ 200.00 'Project Duration - Up to 14 Days 12 10 Type III Barricade per FDOT Standard Index No 600 - Provide for _ EA $ 0.45 $ 4.50 $ 15.00 $ 150.00 S 45.00 $ 450.00 Project Duration - Up to 30 Days i 13 25 Fumish and Install Temporary Concrete Barrier Wall - Provide for LF $ 30.00 $ 750.00 $ 25.00 $ 625.00 $ 30.00 $ 750.00 Project Duration - Up t 4 Days _ - 14 25 Furnish and Install Temporary Concrete Barrier Wall - Provide for LF '�, _ $ 28.00 $ 700.00 $ 25.00 $ 625.00 $ 50.00 $ 1,250.00 Project Duration - Up to 30 Days 15 25 Furnish and Install Temporary Plastic (Water Filled) Barrier Wall, i LF ', $ 25.00 $ 625.00 ' $ 20.00 $ 500.00 $ 30.00 $ 750.00 42" High - Provide for Project Duration - Up to 14 Days 16 25 (Fumish and Install Temporary Plastic (Water Filled) Barrier Wall, LF »- $ 24.00 $ 600.00 1, $ 20.00 $ 500.00 $ 50.00 $ 1,250.00 j42" High - Provide for Project Duration - Up to 30 Days 17 ~ 1 Portable 6 KW Tower Light (Including Power Source as required ) - EA, _ S 280.00 $ 280.00 $ 25.00 $ 25.00 �, $ 30.00 $ 3000 Daily 18 1 ekye 6 KW Tower Light (Including Power Source as required) - EA $ 850.00 $ 850.00 $ 150.00 $ 150.00 - $ 200.00 $ 200.00 W 19 1 Portable 6 KW Tower Light (Including Power Source as required) - EA $ 1 80000 $ 1,800.00 $ 300.00 $ 300.00 $ 600.00 $ 600.00 Monthly Rate STORM WATER POLLUTION PREVENTION 20 ' 100 Fumish and Install Silt Fence '.. LF S 5.50 $ 550.00 $ 5.00 $ 500.00 $ 2.50 $ 250.00 21 5 Fumish and Install Inlet Sediment Control Device EA $ 75.00 $ 375.00 1 $ 250.00 $ 1,250.00 $ 150.00 $ 750.00 22 1 !Fumish and Install Truck Gravel Construction Entrance (Min.. EA $ 2,500.00 $ 2,500.00 ',. $ 3,000.00 $ 3,000.00 '.. $ 2,900.00 $ 2,900.00 ;Length =30') EARTHWORK AND SITE RESTORATION 23 0.1 Cleanng and Grubbing AC $ 30000,00 $ 3,00000 $ 5,000 00 $ 500.00 $ 20,000 o0 $ 2,000.00 24 50 Remove and dispose of unsuitable material CY $ 2200 $ 1,10000 $ 20.00 $ 1,000.00 $ 28.00 $ 1,400.00 25 50 Import suitable fill matenal in place Cy $ 2500 $ - 1,250.00 $ 12.00 $ 600.00 $ 24.00 $ 1,200.00 26 100 Funsh and install St. Augustine or like kind turf SY i $ 4.75 $ 475.00 H $ 8.00 $ 800.00 $ 5.50 $ 550.00 27 100 Furnish and install Bahia Sod SY~' $ 4.50 $ 450.00 ~i $ 8.00 $ 800.00 $ 4.50 $ 450.00 28 100 Swale Restoration (Up to 12" deep with 1:4 slopes or flatter) SY $ 16.00 $ 1,600.00 $ - 8.00 $ 800.00 $ 9.00 $ 900.00 01- 0103 -149 Page 1 of 4 1/21/2014 CITY OF AVENTURA EXHIBIT "A" Maintenance and Repair for City Roads, Streets, and Facilities Bid Tabulation for Bid No. 13- 11 -22 -2 (lowest line item price is highlighted in yellow) JVA Engineering Weekley Asphalt Paving, Item Estimated Quantity Description P Unit Percentage of Total Project Percentage of Total Project Percentage of Total Project PAVING AND CONCRETE 29 100 12" Stabilized Subgrade (min. LBR of 40) SY $ 5.00 $ 500.00 $ 18.00 $ 1,800.00 $ 3.80 $ 380.00 30 700 16" Limerock Base (min. LBR of 700), Including Prime Coat SY $ 18.00 $ 1,800.00 $ 20.00 $ 2,000.00 $ 21.50 $ 2,150.00 31 100 Each Additional 2" Limerock Base (min. LBR of 100), Including Prime Coat SY $ 2.00 $ 200.00: $ 7.00 $ 700.00' $ 4.25 $ 425.00 32 _ 100 1" Asphalt Type SP -9.5, Including Tack Coat SY ', $ 11.25 $ 1,125.00 " $ 8.00 $ 800.00 $ 8.00 $ 800.00 33 100 Each Additional 1/2" Asphalt Type SP 9.5, Including Tack Coat SY $ 6.00 $ 600.00. $ 3.00 $ 300.00 $ 4.00 $ 400.00 34 100 1 1/2" Asphalt Type SP -12.5, Inducing Tack Coat - SY $ 17.25 $ 1,725.00 $ 10.50 $ 1,050.00 $ 10.50 $ 7,050.00 35 1 100 Each Additional 1/2' Asphalt Type SP -12.5, Including Tack Coat �' SY $ 16.00 $ 1,600.00 ii $ 3.00 $ 300.00 i $ 5.25 $ 525.00 36 100 Mill Existing Pavement (1 "Average Depth) SY $ 5.00 $ 500.00 $ 3.00 $ 300.00 '.� $ 5.50 $ 550.00 37 1 �Sealcoat up to 5,000 SF ( )- _ - SF $ 1.50 $ 1.50 $ 0.50 $ 0.50 $ -- 8.00 $ 8.00 38 1 Sealcoat 5 000 SF- 10,000 SF )) 1.25 $ 1 . 25 $ 0.50 $ 0.50 $ 7.50 $ 750 39 1 Sealcoat 1 ( 0,000 SF- 20,000 SF NSF SF _$ - $ 1.10 $ 7.10. $ 0.50 $ 0.50 $ 7.00 $ 7.00 40 1 Sealcoat(20,000 SF- 50,000 SF) l' SF $ 1.00 $ 100 $ 050 $ 0.50 $ 6.00 $ 6.00 41 1 Sealcoat (50,000 SF or Greater) SF $ 0.95 $ 0.95 -0.50 $ 0.50 + $ 5.00 $ 5.00 42 100 Remove and Dispose of Existing Asphalt Pavement (up to 4" ) SY $ 14.00 $ 1,400.00 $ 2000 . $ 2,000.00000.000 $, $ 5.75 $ 575.00 43 100 Remove and Dispose of Existing Concrete (up to 6 ") S ` $ 16.00 $ 1,600.00 $ 15.00 $ 1,500.00 �'� $ 28.00 $ 2,800.00 44 100 Remove and Dispose of Existing Type "D" Concrete Curb $ 10.00 $ 1,000.00 $ 3.00 $ 300.00 $ 8.50 $ 850.00 45 100 Remove and Dispose of Existin T e "F" Concrete Curb and P 9 Type Gutter or Concrete Valley Gutter LF $12.00 $ 1,20000 r $ 7.50 $ 75000 $ 850 $ 85000 476 - 25 Pavement Restoration (up to 18" Limerock, 2" Asphalt) SY �I. $ 45.00 $ 1.125.00 ,( $ 70.00 $ 1,750.00 $ 67.25 $ 1,681.25 47 25 .- Type "F" Curb & Gutter, Including 4" Limerock Pad _ LF $ . -.r 35.00 $ 875.00 -- $ 40.00 $ 1,000.00 $ 81.00 -- $ 2,025.00 48 25 ,.Type "D " Curb . LF $ 30.00 $ 750.00 $ 40.00 $ 1,00000,E $ 51.00 $ 1,275.00 49 25 8' Wide Asphalt Exercise Path wth 6" Limerock Base (min LBR of '. 100) LF ! 4 $ 32.00 $ 800.00 1, $ 25.00 $ 625.00 $ 87.00 $ 2,175.00 50 100 4" Concrete Sidewalk (min. 3,000 psi) with Compacted Subgrade SY $ 49.50 $ 4,950.00 $ 45.00 $ 4,500.00 $ 38.00 $ 3,800.00 51 100 6" Concrete Sidewalk (min. 3,000 psi) with Compacted Subgrade SY 1 I $ 58.50 $ 5,850.00 '. $ 45.00 $ 4,500.00 $ 46.00 $ 4,600.00 52 100 _ Remove and Replace Existing 6" Stamped Concrete (min. 3,000 psi) with Compacted Subgrade SY $ 057 $ 7,500.00 $ 20.00 $ 2,000.00 $ 96.00 $ 9,600.00 53 25 Brick Pavers (min. 3 1/8" Thick) on %" Sand Bed .. SF ~, $ 6.00 $ 150.00 $ 1200 . $ 300.00 $ 8.00 $ 200.00 54 100 Remove and Replace Existing Brick Pavers SY $ 8.00 $ 800.00 ~'. $ 2000 . $ 2,000.00 $ 11.00 $ 1,100.00 55 700 Remove and Replace Existing Header Curb u to 12" x 12" P 9 P SY $ 75 00 $ 7800.00 $ 30 00 $ 3 000 00 $ 288 00 $ 28 56 100 Install New 8 "x12 " Header Curb min. 4,000 psi) ( P ) SY� -. $ 7000 $ _ 7,00000 � $ 25.00 $ 2 500 00 8.00 $ 28800.00 800.00 57 1 (Surface Accessible Ramps Concrete with Embedded Detectable Warning g EA $ 1 80000 $ 1, $ 1,500.00 $ 1,50000 �, $ 3,800.00 $ 3,800.00 58 59 -CO 25 'Furnish 2 (Furnish and Install Guardrail Per FDOT Standard Index 67 400 and Install Guardrail End Anchorage Assembly per FDOT Standard Index No. 400 LF EA $ $ 45.00 $ 750.00 $ 1,125.00 1,500.00 $ 30.00 $ 2,500.00 $ 75000 11 $ 5,00000 : $ $ 26.00 2,550.00 $ 650.00 $ 5,100.00 25 Furnish and Install Pedestrian Handrail per FDOT Standard Index No. 870 LF �� $ 60.00 $ 1,500.00 $ 100.00 $ 2,50000 $ 65.00 $ 1,625.00 61 50 Furnish and Install 6' High Temporary Chain Link Fencing LF I $ 28.00 $ 1,400.00 $ 1200 . $ 600.00 $ 10.00 $ 500.00 62 50 Furnish and Install 4' High Orange Construction Fence LF $ 3.50 $ 175.00 $ 5.00 $ 250.00 $ 6.00 $ 300.00 63 50 Plowable Fill CY $ 150.00 $ 7,500.00 $ 125.00 $ 6.250.00 I $ 160.00 $ 8.000.00 64 1 Concrete Wheel Stops - Installed EA $ 40.00 $ 4b.00 $ 50.00 $ 50.00 $ 65.00 $ 65.00 01- 0103 -149 Page 2 of 4 1/21/2014 CITY OF AVENTURA EXHIBIT "A" Maintenance and Repair for City Roads, Streets, and Facilities Bid Tabulation for Bid No. 13- 11 -22 -2 (lowest line item price is highlighted in yellow) JVA Engineering Weekley Asphalt Paving, Cnntrar-tnr Inn Manna r -tn,rfinn Ins I.... 01- 0103 -149 Page 3 of 4 1/21/2014 Estimated Item Quantity Description P Unit Percentage of Total Project Percentage of Total Project Percentage of Total Project STORM DRAINAGE 65 25 Pipe Culvert - 12" Diameter HDPE (Installation Includes All LF $ 53.00 $ 1,325.00 $ 55.00 $ 1,375.00 $ 60.00 $ 1,500.00 Bedding, Shoring, etc. as necessary to provide work) 66 25 _ Pipe Culvert - 15" Diameter HDPE (Installation Includes All LF $ 60.00 $ 1,500.00. $ 60.00 $ 1,500.00 $ 76.00 $ 1,900.00 Bedding, Shoring, etc, as necessary to provide work) 67 25 Pipe Culvert - 15" Diameter RCP (Installation Includes All Bedding, LF $ 73.00 $ 1,825.00 $ 75.00 $ 1,875.00 $ 80.00 $ 2,000.00 Shoring, etc as necessary to provide work) 68 25 (Pipe Culvert - 18" Diameter HDPE (Installation Includes All LF $ 65.00 $ 1,625.00 $ 65.00 $ 1,625.00 $ 90.00 $ 2,250.00 'Bedding, Shoring, etc. as necessary to provide work) 69 25 Pipe Culvert - 18" Diameter RCP (Installation Includes All Bedding, $ 78.00 $ 1,95000 $ 8000 $ 2,000.00 $ 98.00 $ 245000 Shoring, etc. as necessary to provide work) �LF Pipe Culvert - 24" Diameter HDPE (Installation Includes All $. $ 70 0000 $ 1,750.00 $ 80.00 $ 2,000.00 $ 115.00 $ 2.875.00 Bedding, Shoring, etc. as necessary to provide work) 71 25 Pipe Culvert - 24" Diameter RCP (Installation Includes All Bedding, _ LF $ 85.00 $ 2 125 0'0s l0000 $ 2,500.00 $ 135.00 $ 3,375.00 _ Shoring, etc, as necessary to provide work) 72 25 !Pipe Culvert - 30" Diameter HDPE (Installation Includes All LF $ 78.00 $ 1,950.00 $ 60.00 $ 1,500.00 $ 170.00 $ 4,250.00 - Bedding, Shoring, etc. as necessary to provide work) 73 25 _ Pipe Culvert - 30" Diameter RCP (Installation Includes All Bedding, LF� $ 90.00 $ 2,250.00 $ 70.00 $ 1,750.00 $ 180.00 $ 4,500.00 _ Shoring, etc. as necessary to provide work) 74 1 25 Pipe Culvert - 36" Diameter HDPE (Installation Includes All 1 LF $ 85.00 $ - 2,125.00 Iii $ 65.00 $ 1,625.00 $ 210.00 $ 5,250.00 Bedding, Shoring, etc. as necessary to provide work) 75 25 '',Pipe Culvert - 36" Diameter RCP (Installation Includes All Bedding, �. LF _ $ 140.00 $ 3,500.00 $ 75.00 $ 1,875.00,' $ 240.00 $ 6,000.00 Shoring, etc. as necessary to provide work) 76 25 Pipe Culvert - 42" Diameter RCP (Installation Includes All Bedding, LF S 160.00 $ 4,000.00 ^. $ 80.00 $ 2,000.00 $ 290.00 $ 7,250.00 Shoring, etc. as necessary to provide work) 77 25 _ Pipe Culvert - 48" Diameter RCP (Installation Includes All Bedding, LF $ 180.00 $ 4,500.00 $ 87.00 $ 2,175.00 $ 330.00 $ 8,250.00 Shoring, etc as necessary to provide work) 78 25 Pipe Culvert - 54" Diameter RCP (Installation Includes All Bedding, LF $ 225.00 $ 5,625.00 ', $ 88.00 $ 2,200.00 $ 360.00 $ 9,000.00 ''!Shoring, etc as necessary to provide work) 79 25 ::Pipe Culvert - 60" Diameter RCP (Installation Includes All Bedding, _ LF $ 260.00 $ 6,500.00 ! $ 89.00 $ 2,225.001. $ 400.00 $ 10,000.00 _ Shoring, etc. as necessary to provide work) - 80 25 Pipe Culvert - 72" Diameter RCP (Installation Includes All Bedding, LF $ 350.00 $ 8,750.00 $ 90.00 $ 2,25 0 900.00 $ 22.500.00 ' _ Shoring, etc . as necessary to provide work) 81 1 Construct New Drainage Well (6'X12' Structure) (Box Only) EA $ 20,000.00 $ 20,006 .00. $12,000.00 $ 12,000.00 $ 12,000.00 $ 12,000.00 82 1 Drill Drainage Well (Up to 150' Depth) w/ 24" Steel Casing (Well - : EA $ 20,000.00 $ 20,000.00 1 $15,000.00 $ 15,000.00 $ 92,000.00 $ 92,000.00 Only) 83 1 !Re -Dnll Existing Drainage Well (Up to 150' Depth) EA $ 20,000.00 $ 20,000.00 $ 3,500.00 $ 3,500.00'; $ 48,000.00 $ 48,000.00 84 25 14' -I' x 4' Exfltration Trench with 15" Slotted RCP I - -- -y LF 1, $ 180.00 $ 4,500.00 $ 100.00 $ 2,500.00 $ 165.00 $ 4,125.00 85 25 4' x 6' Exfiltration Trench with 15" Slotted RCP LF - - - -- $ 230.00 $ 5,750.00 $ 100.00 $ 2,500.00 - - ---- $ 195.00 -- $ 4,875.00 86 1 12" ADS Drain Basin EA $ 1,600.00 $ 1,600.00 $ 550.00 $ 550.00 700.00 $ 700.00 87 1 15" ADS Drain Basin EA $ 11800.00 $ 1,800.00 $ 800.00 $ 800.00 $ 750.00 $ 75000 88 1 18" ADS Drain Basin EA $ 2,000.00 $ 2,000.00 $ 800.00 $ 800.00 $ 800.00 $ 800.00 89 1 24" ADS Drain Basin EA $ 2,200.00 $ 2,200.00 $ 1,200.00 $ 1,200.00 $ 950.00 $ 950.00 90 1 Drainage Inlet (Type C - 24" x 36 ") - �'. EA $ 3,500.00 $ 3, 500.00, $ 2,000.00 $ 2,000.00 '.. $ 4,000.00 $ 4,000.00 91 1 Drainage Inlet (Type C -4 -48" Round) EA $ 4,275.00 $ 4,275.00 i $ 2,500.00 $ 2,500.00 $ 6,800.00 $ 6,800.00 92 1 Drainage Inlet (Type C -5 -60" Round) EA $ 5,350.00 $ 5,350.00 �,, $ 2,500.00 $ 2,500.00 ~'. $ 7,700.00 $ 7,700.00 93 1 !Drainage Inlet (Type C -6 - 72" Round) ! EA $ 8,400.00 $ 8,400.00 $ 3,450.00 $ 3,450.00 $ 10,000.00 $ 10,000.00 94 1 (Storm Manhole (Type M-4 - 48" Round) EA $ 4,625.00 $ 4,625.00 $ 3,000.00 $ 3,000.00 $ 5,000.00 $ 5,000.00 95 1 'Storm Manhole (Type M -5 -60" Round) EA $ 5,575.00 $ 5,575.00 $ 3,000.00 $ 3,000.00 $ 7,200.00 $ 7,200.00 96 1 Storm Manhole (Type M -6 - 72" Round) EA $ 8,615.00 $ 8,615.00 '.. $ 3,450.00 $ 3,450.00 $ 8,300.00 $ $300.00 97 1 Storm Manhole (Type M -8 - 96" Round) EA $ 15,000.00 $ 15,000.00 $ 3,800.00 $ 3,800.00 $ 11,000.00 $ 11,000.00 98 1 Storm Manhole (Type M -10 - 120" Round) ! EA $ 22,500.00 $ 22,500.00 j $ 4,000.00 $ 4,000.00 $ 19,000.00 $ 19,000.00 99 25 15" Cast -In -Place Pipe Liner LF $ 100.00 $ 2,500.00 !, $ 25.00 $ 625.00 ; $ -- 260.00 $ 6,500.00 100 ! 25 _ 18" Cast -In -Place Pipe Liner LF $ 125.00 $ 3,125.00 $ 25.00 $ 625.00 $ 280.00 $ 7,000.00 101 25 24" Cast -In -Place Pipe Liner LF $ 175.00 $ 4,375.00 ! $ 26.00 $ 650.00 $ 300.00 _ $ 7,500.00 102 25 30" Cast -In -Place Pipe Liner LF $ 225.00 $ 5,625.00 $ 27.00 $ 675.00 $ 370.00 $ 9,250.00 103 - 25 36" Cast -In -Place Pipe Liner LF $ 300.00 $ 7,500.00 $ 28.00 $ 700.00 $ 560.00 $ 14,000.00 104 25 42" Cast -In -Place Pipe Liner LF $ 350.00 $ 8,750.00 $ 29.00 $ 725.00 �'. $ 600.00 $ 15,000.00 105 _ 25 148" Cast -in -Place Pipe Liner LF $ 400.00 $ 10,000.00 $ 30.00 $ 750.00 $ 900.00 $ 22,500.00 10 6 1.. Core-Dnll 8 Connect to Existing Drainage Structure EAY $ 1,200.00 $ 1,200.00 $ 800.00 $ 80000 '' $ 600.00 $ 600.00 107 100 Well Cleaning -24" Well Casing up to 100 Feet, Including Proper LF r$ 100.00 $ 10,000.00~ $ 30.00 $ 3,000.00± $ 300.00 $ 30,000.00 Disposal of All Material '.. 108 1 Basin Cleaning, Including Proper Disposal of All Material (Includes EA !! $ 300.00 $ 300.00 $ 350.00 $ 350.00 s 850.00 $ 850.00 Installation of Plugs, Pumps, etc as necessary to provide work) 109 1 Manhole Cleaning, Including Proper Disposal of All Material EA i $ 500.00 $ 500.00. $ 350.00 $ 35000 $ 950.00 $ 950.00 (Includes Installation of Plugs, Pumps, etc as necessary to provide work) 110 50 ,CCTV Video Inspection of Existing Pipe /Culvert, Including Written LF $ 100 00 $ 5,000.00 $ 4.00 $ 200.00 l. $ 7.50 $ 375.00 !I Report (Includes Installation of Plugs, Pumps, etc. as necessary to', provide work) 111. 1 -- - - - -I Install 15" Plu g_ 24 -Hour Rate, Includes Removal EA ~ $ 300.00 $ 300.00 $ 230.00 - -�_ $ 230.00 $ 500.00 $ 500.00 112 1 Install 18" Plug - 24 -Hour Rate, Includes Removal EA $ 500.00 $ 500.00- $ 230.00 $ 230.00 $ 650.00 $ 650.00 113 1 Install 24" Plug - 24 -Hour Rate, Includes Removal EA $ 700.00 $ 700.00 $ 275.00 $ 275.00 $ 750.00 $ 750.00 114 1 Plug Install Plu Greater than 24" -24 -Hour Rate, Includes Removal EA ! - --- 000- - - - $ 800.00 $ ---. 800.00 $ 350.00 $ 350.00 '�. $ 900.00 $ 900.00 115 50 Clean Existing 15" Culvert (Includes Proper Disposal of All EA 1i $ 6.00 $ 300.00 1. $ 5.50 $ 275.00 $ 5.00 $ 250.00 Material, Plugs, Pumps, etc as necessary to provide work) 01- 0103 -149 Page 3 of 4 1/21/2014 CITY OF AVENTURA EXHI BIT "A" Maintenance and Repair for City Roads, Streets, and Facilities Bid Tabulation for Bid No. 13- 11 -22 -2 (lowest line item price is highlighted in yellow) JVA Engineering Weekley Asphalt Paving, contractor- Inc- Manna cnnsfnrr - -tinn Inc Inr Item Estimated Quantity Description Unit Percentage of Total Project Percentage of Total Project Percentage of Total Project 116 50 Clean Existing 18" Culvert (Includes Proper Disposal of All Material, Plugs, Pumps, etc. as necessary to provide work) LF $ 8.00 $ 400.00 $ 5.50 $ 275.00 $ 6.00 $ 300.00 117 1 50 Clean Existing 24" Culvert (Includes Proper Disposal of All Material, Plugs, Pumps, etc. as necessary to provide work) 60.00 LF r $ 10.00 $ 500.00 $ 5.50 $ 275.00 $ 7.00 $ 350.00 118 50 Clean Existing 30" Culvert (Includes Proper Disposal of All Material, Plugs, Pumps, etc. as necessary to provide work) 38.00 LF $ - 12.00 $ 600.00 $ 5.50 -- $ 275.00 $ 9.00 $ 450.00 119 50 Clean Existing 36" Culvert (Includes Proper Disposal of All Material, Plugs, Pumps, etc. as necessary to provide work) $ 61.00 LF $ 14.00 $ 700.00 '. $ 5.50 $ 275.00 $ 70.00 $ 500.00 120 1 50 Clean Existing 2" Culvert Includes Proper Disposal of All 9 ( P P Material, Plugs, Pumps, etc. as necessary to provide work) $ 35.00 LF $ 16.00 $ 800.00 $ 7.50 -�� $ 375.00 $ 12.00 S 600.00 121 50 Clean Existing 48" Culvert (Includes Proper Disposal of All Material, Plugs, Pumps, etc. as necessary to provide work) LF $ 18.00 $ 900.00 $ 7.50 _..- $ 375.00 ' $ 15.00 $ 750.00 122 50 Clean Existing 54" Culvert (Includes Proper Disposal of All 'Matenal, Plugs, Pumps, etc. as necessary to provide work) LF ��I $ 20.00 $ 1,000.00 ll, $ Z50 $ 375.00 - $ 18.00 $ 900.00 123 50 Clean Existing 60" Culvert (Includes Proper Disposal of All Matenal, Plugs, Pumps, et(. necessary to provide work) LF $ 2200 . $ 1,100.00.. $ 7.50 $ 375.00. $ 29.00 $ 1,450.00 124 ' 50 Clean Existing 72" Culvert Includes Pro er Disposal of All (Includes Material, Plugs, Pumps, etc. as necessary to provide work)_ LF $ 24.00 $ 1,200.00 $ 7.50 $ 375.00 $ -- 31.00 $ 1,550.00 125 1 Provide 2" Pump with Discharge Line - 24 -Hour Rate EA $ 250.00 $ 250.00 $ 235.00 $ 235.00 y $ 200.00 $ 200.00 126 � 1 Provide 2" Pump with Discharge Line - Weekly Rate -��- EA ! '. $ --- 2,800.00 $ 2,800.00 $ 235.00 $ 235.00 � $ 1,000.00 - $ 1,000.00 127. 128 1 I 1 Provide 2" Pump with Discharge Line - Monthly Rate Provide 4" Pump with Discharge Line - 24 -Hour Rate EA EA S $ 12,000.00 $ 400.00 $ 12,000.00 400.00 �'.. $ 235.00 t $ 500.00 $ 235.00 $ 500.00 $ $ 3,500.00 270.00 $ 3.500.00 $ 270.00 129 1 Provide 4" Pump with Discharge Line - Weekly Rate EAR $ 3,800.00 $ 3,800.00 $ 500.00 $ 500.00 '.. $ 1,350.00 $ 1,350.00 130 1 'Provide 4" Pump with Discharge Line - Monthly Rate EA $ 16,000.00 $ 16,000 .00 $ 500.00 $ -50000$ 4,900.00 $ 4,900.00 131 1 Provide 6" Pump with Discharge Line - 24 -Hour Rate EA' $ 600.00 $ 600.00 - $ 500.00 $ 500.00 $ 320.00 $ 320.00 132 1 1 Provide 6" Pump with Discharge Line - Weekly Rate EA $ 4,500.00 $ 4,500.00 1 $ 500.00 $ 500.00 $ 1,600.00 $ 1,600.00 133 1 Provide 6" Pump with Discharge Line - Monthly Rate EA ~ $ 18,000.00 $ 18,000.00', $ 500.00 $ 500.00 $ 5,600.00 $ 5,600.00 PAVEMENT MARKINGS AND SIGNAGE 134 1 Single Post Sign (up to 30" x 30" 9 9 ) EA $ 500.00 $ 500.00 ' - - S 600.00 $ 600.00 ', $ 380.00 $ 380.00 135 25 4" Solid Stnping (Thermoplastic) LF $ _ 1.06 $ 26.50 $ 1.00 $ 25.00 $ 3.00 $ 75.00 136 25 6" Solid Stnping (Thermoplastic) LF $ 1.25 $ 31.25 $ 3.00 $ 75.00 $ 4.00 $ 100.00 137, 25 8" Solid Stnping (Thermoplastic) LF 1 $ 1.56 $ 39.00 $ 3.25 $ 81.25 $ 4.50 $ 112.50 138 1 25 12" Solid Striping (Thermoplastic) LF ''. i $ 2.50 $ 62.50 j $ 3.50 $ 87.50 $ 4.75 $ 118.75 139 11 25 18" Solid Stnping (Thermoplastic) LF $ 4.06 $ 101.50 $ 3.50 $ 87.50 $ 5.50 $ 137.50 140 I 25 24" Solid Striping (Thermoplastic) LF : $ 5.63 $ 140.75 $ 10.00 $ 250.00 $ 7.00 $ 175.00 141 25 6" Skip Stnping (Thermoplastic) LF $ 1.56 $ 39.00 $ 4.00 $ 100.00 ~', $ 4.00 $ 100.00 142 25 4" Solid Stnping (Paint) LF $ 0.25 $ 6.25 $ 0.55 $ 13.75 $ 2.50 $ 62.50 143 25 6" Solid Striping (Paint) LF $ 0.63 $ 15.75 $ 1.50 $ 37.50 $ 2.90 $ 72.50 144 25 !8" Solid Stnping (Paint). LF $ 0.31 $ 7.75 $ 1.75 $ 43.75 $ 150 $ 87.50 145 146 ` 25 25 118" 12" Solid Striping (Paint) Solid Stnping (Paint) LF 1 LF ', $ $ 1.25 $ 1.56 $ 31.25 39.00 $ 1.75 175 $ 43.75 $ 43.75 $ �'' $ 4.00 5.00 $ 100.00 $ 125.00 147 25 P g ( ) - - -- 24" Solid Striping Paint LF $ 2.19 $ 54.75 's- - $ - - -- -5.00 $ 125.00 $ 6.00 $ 150.00 148 25 6" Skip Stnping (Paint) LF ��I $ 0.63 $ 15.75 $ 2.00 $ 50.00 $ 3.00 $ 75.00 149 1 Arrow (Thermoplastic) - EA $ 93,75 $ 93.75 $ 175.00 $ 175.00 1:. $ 140.00 S 140.00 150 1 Arrow (Paint) EA EA �, $ $ 4375 $ 125.00 $ 43.75 625.00 $ 175.00 $ 15.00 $ 175.00 $ 75.00 $ $ 90.00 80.00 $ 90.00 $ 400.00 151 !� 5 Lettering g per Letter (Thermoplastic) 152 '- 153 1 1 Handicap Symbol (Thermoplastic) Handicap Symbol (Paint) EA ',~, EA $ $ 375.00 $ 187.50 $ 375.00 187.50 $ 350.00 $ 350.00 $ 350.00'. $ 350.00 $ $ 500.00 375.00 $ 500.00 $ 375.00 154 10 Reflective Pavement Marker (RPM) EA 1i ! $ $ 7.50 $ 2.50 $ 75.00 25.00 $ 10.00 $ 50.00 $ 100.00 $ 500.00 $ $ 7.00 16.00 $ 70.00 $ 160.00 155 10 Remove Existing Thermoplastic Pavement Markings (Hydroblast) LF 156 1 Portable Stop Sign (30" x 30 ") EA : $ 312.50 $ 312.50 $ 100.00 $ 100.00 '.. $ 150.00 $ 150.00 Item Category Regular Rate Overtime Rate Regular Rate Overtime Rate Regular Rate Overtime Rate HOURLY RATES 1 Laborer $ 40.00 $ 60.00 $ 20.00 $ 30.00:. $ 24.00 $ 38.50 2- Equipment Operator $ 60.00 $ 90.00 $ 38.00 $ 57.00 $ 29.00 $ 46.40 3 4 5 Foreman ',Superintendent iProvide 2" Pump with Discharge Line - Hourly Rate $ -- - I $ $ 80.00 $ 100.00 $ 250.00 12000 150.00 $ $ 40.00 5000 50.00 $ 60.00 $ 7500 $ 75.00 $ 38.00 $ 61.00 $ 6700 $ 107.00 $ 30.00 $ 45.00 6 (,Provide 4" Pump with Discharge Line - Hourly Rate $ 400.00 $ 60.00 $ 90.00 $ 35.00 $ 52.50 7 Provide 6" Pump with Discharge Line - Hourly Rate S 600.00 $ 70.00 $ 105.00 $ 40.00 $ 60.00 01- 0103 -149 Page 4 of 4 1/21/2014