Loading...
2013-49 RESOLUTION NO. 2013-49 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF AVENTURA, FLORIDA APPROVING AND AUTHORIZING THE CITY MANAGER TO EXECUTE AND OTHERWISE ENTER INTO CHANGE ORDER NUMBER 4 FOR THE AVENTURA GOVERNMENT CENTER PARKING EXPANSION BY AND BETWEEN THE CITY AND MUNILLA CONSTRUCTION MANAGEMENT, LLC; AUTHORIZING THE CITY MANAGER TO TAKE NECESSARY AND EXPEDIENT ACTION TO CARRY OUT THE AIMS OF THIS RESOLUTION; PROVIDING FOR THE APPROPRIATION AND ALLOCATION OF FUNDS FOR SAID CHANGE ORDER; AND PROVIDING FOR AN EFFECTIVE DATE. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF AVENTURA, FLORIDA: Section 1 The City Manager is hereby authorized to execute and otherwise enter into attached Change Order Number 4 between the City and Munilla Construction Management, LLC for Aventura Government Center Parking Expansion construction and incorporated herein as specifically as if set forth at length herein. Said Change Order amount is $51,207. Section 2 The City Manager is hereby authorized and requested to do all things necessary to carry out the aims of this Resolution. Section 3 That the funds to be allocated and appropriated pursuant hereto and for the purpose of carrying out the tenets of this Resolution shall be from Budget Line item Number 001-8090-590-6206. Section 4 This Resolution shall become effective immediately upon its adoption. The foregoing Resolution was offered by Commissioner Joel, who moved its adoption. The motion was seconded by Commissioner Cohen, and upon being put to a vote, the vote was as follows: Commissioner Enbar Cohen yes Commissioner Teri Holzberg yes Commissioner Billy Joel yes Commissioner Michael Stern yes Commissioner Howard Weinberg yes Commissioner Luz Urbaez Weinberg absent Mayor Susan Gottlieb yes Resolution No. 2013-49 Page 2 PASSED AND ADOPTED this 5th day of November, 20 . /� SUSAN GO " LIEB, MAYOR A i' ST: I' "ESA M. OR. A , MMC CLERK APPROVED A TO LEG L SUFFICCY: bv) CITY ATTORNEY > , CITY OF AVENTURA CHANGE ORDER FORM CHANGE ORDER NO.4 ofExCe CONTRACT NUMBER: N/A DATE: October 16, 2013 PROJECT TITLE: Aventura Government Center Parking Expansion PROJECT CONTRACTOR: Munilla Construction Management, LLC (MCM) COST: $51,207 BUDGET LINE ITEM: 001-8090-590-6206 DESCRIPTION OF CHANGES: Provide for an asphalt overlay in all areas of the existing Government Center Parking area not included in the Government Center Parking Expansion construction contract. Original Contract: $ 3,876,493 Total Previous Change Orders: $(1,190,209) This Change Order: $ 51,207 Revised Contract Amount: $2,737,491 Total Change Orders to Date: 3 Contract Amount Before This Change: $2,686,284 Total Change in Contract Period: 0 Days The sum of $51,207 is hereby added to the Contract price, and the total adjusted Contract price to date thereby is $2,737,491. The time provided for completion of the Contract remains the same. However, the asphalt overlay work outlined in the approved proposal must be substantially completed no later than 11/1/13.This document shall become an amendment to the Contract and all provisions of the Contract will apply thereto. Recommended by Consultant Date Recommended by -r�-� o-r I° l !b' !3 Capital Projects Manager Date Recommended for Budgetary Purposes: Finance Support Services Director Date Approved by City Manager Date Accepted by Contractor Date C- -\(-- CHANGE PROPOSAL REQUEST r__} j COR: 13R DATE:Sep.10.13(Revised 9-30-13)(Revised 10-9-13) PROJECT:Government Center City of Aventura Parking Garage TO:PEAL Attention:Rodney Crockett RE:New Asphalt not included in Contract Documents DESCRIPTION: This COR is for the proposed additional asphalt not included in the contract documents.These areas are on the northside and southside of garage.In addition,the area on the southwest side partially under the ramp requires new asphalt not shown on contract drawings.See attached sketch for proposed areas. The cost for this additional work is as follows: TOTALS LABOR $1;399 (see attached documents) MATERIAL $0 (see attached documents) EQUIPMENT $0 (see attached documents) SUBCONTRACTS $43,425 (see attached documents) Subtotal $44,824 Contractual Markup(12%) $5,379 Subtotal $50,203 Insurance Boltd(2%) $ 1,004 TOTAL: $51,207 This proposed change is limited to the work described herein,and does not include any other work not listed on the attached Direct Cost Analysis. TIME EXTENSION ReeueST COST Below please find a-prgecbon of days aribcipated to perform the above noted work MCM reserves its hts to address- -reallcostassociated with the additiOnal time ui ed below n at a later date. . s. . ....... .... °v•°:.°....°.. ....•...• .....::'. al:` .°..a.. c•:°l°' 'o•: . .. °'ems'...•... TOTAL OF THIS CHANGE ORDER REQUEST •' DEDUCT' I $ 51,207 The Contract Time will be revised to reflect. / DEDUCT! I 3 days MCM f to . 13 General Contractor AO,� //� •nature Dale Having received the above,I hereby certify that to the . •t.a and f,the cost er p prop data submitted reflects adequate values and that the Contractor is entitled ester •.as noted above. City of Aventure Owner Signature Date C DIRECT COST ANALYSIS This constitutes the support for the Direct Cost on this Change Order Request DATE:Sep.10.13(Revised 9-30-13) COR# 13R PROJECT:Government Center City of Aventura Parking Garage RE:New Asphalt not included in Contract Documents . ................... .ti r.ti• • tires•= m-eziWi 69917.5.37 27^ritzta m_____- _ _ ysa LABOR Item DESCRIPTION UNIT MHRS U.COST SUB.TOT 1 Project Executive(1day/week)includes Burden day 0 $1,255.00 $0 2 Project Manager includes Burden wk 0.25 $2,855.00 $714 3 Superintendent includes Burden wk 0.25 $2,225.00 $556 4 Field Clerk includes Burden day 0 $195.00 $0 5 Labor(3)days/wk include Burden day 1 $129.00 $129 6 Safety 1 day/week includes Burden day 0 $337.00 $0 SubTotal= $1,399) 11-47■1147AT-1 Item DESCRIPTION UNIT QTY. U.COST SUB.TOT SubTotal= $01 L EQUIPMENT item DESCRIPTION UNIT QTY. U.COST SUB.TOT 1 General Conditions(includes:Temp wk 0 $0.00 $0 Fencing,Trailer,Phones,Insurance,Temp Power,etc)($3,309/month) SubTotal= $0 L SUBCONTRACTS item DESCRIPTION UNIT QTY. U.COST SUB.TOT Rock Power 1 North and South Side of Garage LS 1 36;616 $36,616 Rock Power 2 Southwest side of Garage LS 1 6,809 $6,809 SubTotal= $43 425 General Engineering Contractors 13831 S.W. 59 ST., Suite 204 d _ Miami, FL 33183 I ' . Tel: (305) 752-7742 Fax: (305) 752-7728 CHANGE ORDER # 16 TO: MCM FROM: Robert Delgado ATTN: Juan Campos DATE: 10/9/2013 RE: Aventura Government Center. Description of Job: Costs associated with demolition and installation of 1"of asphalt S-III), aprox: 3496 SY on the North and South of the parking garage from the west property line to the entrance (West Country Club drive) Materials Unit QTY Unit Price Subtotal Asphalt 1"S-Ill TN 185 $ 90.00 $ 16,650.00 Haulling off asphalt Trucks 10 $ 150.00 $ 1,500.00 I Total . 18;150:0(1 Equipments and Operators Unit QTY Rate Subtotal Compactor 2 Drum HR 24 $ 69.44 _$ 1,666.56 Asphalt Machine HR 24 $ 49.50 _$ 1,188.00 Excavator HR 16 $ 107.00_ $ 1,712.00 Loader HR 16 $. 65.00 $ 1,040.00 Total 'Sia.. 56 Work Force/Crew Unit QTY Rate Burden-35% Subtotal Foreman HR 12 $ 35.00 $ 18,38 $ 640.50 Labors(2) HR 48 $ 15.00 $ 5.25 $ 972.00 Rack man (2) HR 48 $ 19.00 $ 6.65 $ 1,231.20 Operator asphalt machine HR 24 $ 25.00 $ 8.75 $ 810.00 Operator Compactor HR 24 $ 25.00 $ 8.75 $ 810.00 Operator Excavator HR 16 $ 25.00 $ 8.75 $ 540.00 Operator Loader HR 16 $ 25.00 $ 8.75 $ 540.00 Labors(2) HR 80 $ 15.00 $ 5.25 $ 1,620.00 Total ' $ 7;$3;ro` Striping 4"white I EA 76 $ 5.00 $ 380.00 Handicap Logo EA 6 $ 70.00 $ 420.00 Hancap Hafch EA 4 30.00 T $ _120:00 f Total " _ $ 920.00 Work Subtotal Excluding Subcontractor $ 31,840.26 15% OHP $ 4,776.04 Grand Total $ 36,616.30 Approval Signature Print Name&Title Approval Date General Engineering Contractors 13831 S.W. 59 ST., Suite 204 4 ` Miami, FL 33183 Tel: (305) 752-7742 Fax: (305) 752-7728 CHANGE ORDER # lla TO: MCM FROM: Robert Delgado ATTN: Juan Campos DATE: 9/10/2013 RE: Aventura Government Center. Description of Job: Costs associated with the demolition and instalation of 175SY in 1°asphalt S-III ...muC....-eu¢'x>vrll.c.evn'{:..,v Materials Unit QTY Unit Price Subtotal Asphalt TN 18 - $ 120.00 $ 2,160.00 Haulling off asphalt Trucks 1 $ 150.00 $ 150.00 _ - Total 2,310'10 Equipments and Operators Unit QTY Rate Subtotal Compactor 2 Drum HR 8 $ 69.44 $ 555.52 Asphalt Machine _ HR 8 $ 49.50 $ 396.00 Excavator HR 8 $ 107.00 $ 856.00 Loader HR 8 $ 65.00 $ 2,520.00 To _ TOW , 42 Work ForcelCrew Unit QTY Rate _Burden-35% Subtotal Foreman HR 2 $ 35.00_ $ 18.38 $ 106.75 Labors(2) HR 8 $ 15.00 $ 5.25 $ 162.00 Rackman (2) HR 8 $ 19.00 $ 6.65 $ 205.20 Operator asphalt machine HR 4 $ 25.00 $ 8.75 $ 135.00 Operator Compactor HR 4 $ 25.00 $ 8.75 $ 135.00 Operator Excavator HR 8 $ 25.00 $ 8.75 $ 270.00 Operator Loader HR - 8 $ 25.00 $ 8.75 $ 270.00 Total 4, 3 05`. Work Subtotal Excluding Subcontractor $ 5,921.47 15% OHP $ 888.22_ IGrand Total $ 6,809.69 Approval Signature Print Name&Title