Loading...
2013-28 RESOLUTION NO. 2013-28 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF AVENTURA, FLORIDA, AUTHORIZING THO CITY MANAGER TO EXECUTE ATTACHED WORK AUTHORIZATION NO. 01-0103-169 FOR PROFESSIONAL DESIGN SERVICES FOR THE BISCAYNE BOULEVARD STREET LIGHTING PHASE 4 IMPROVEMENTS PROJECT BY AND BETWEEN THE CITY OF AVENTURA AND CRAVEN THOMPSON AND ASSOCIATES, INC.; AND PROVIDING AN EFFECTIVE DATE. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF AVENTURA, FLORIDA, THAT: Section 1 The City Manager is hereby authorized to execute attached Work Authorization No. 01-0103-169 ($79,750) for professional design services for the Biscayne Boulevard Street Lighting Phase 4 Improvements project by and between the City and Craven Thompson and Associates, Inc. Section 2 The City Manager is authorized to do all things necessary to carry out the aims of this Resolution. Section 3 That the funds to be allocated and appropriated pursuant hereto and for the purposes of carrying out the tenets of this Resolution shall be from Budget Line Item Number 001-8050-541-6307. Section 4 This Resolution shall become effective immediately upon its adoption. The foregoing Resolution was offered by Commissioner Enbar Cohen, who moved its adoption. The motion was seconded by Commissioner Howard Weinberg, and upon being put to a vote, the vote was as follows: Commissioner Enbar Cohen yes Commissioner Teri Holzberg absent Commissioner Billy Joel yes Commissioner Howard Weinberg yes Commissioner Luz Urbaez Weinberg yes Vice Mayor Michael Stern yes Mayor Susan Gottlieb yes Resolution No. 2013-2-8 Page 2 PASSED AND ADOPTED this 9th day of July, 2013 —116A GOTT EB, MAYOR ATTEST: RESA M. :0- •KA MMC CITY CLERK APPROVED AS TO LEGAL SUFFIIs4ENCY: Ph°\ frV-4`'") CITY ATTORNEY WORK AUTHORIZATION NO. 01-0103-169 The City of Aventura has requested Work Authorization No. 01-0103-169 as provided for in the Agreement between the City of Aventura and Craven Thompson and Associates, Inc. and approved by the City Commission on July 3, 2001. This Work Authorization No 01-0103-169 provides for technical services in accordance with Articles 3, 4, 6, 7 and 8 of the Agreement as further detailed in the scope of services in Exhibit A. Payment for such services shall be in accordance with Article 5 of the Agreement. Survey Phase Prepare Design Survey $31,500.00 Total Survey Phase $31,500.00 Design&Permitting Phase Permitting&Project Management $11,000.00 Prepare Electrical Design Plans $16,000.00 Total Design&Permitting Phase $27,000.00 Construction&Bidding Phase Bid Phase Services $4,500.00 Site Visits/Project Closeout $16,000.00 Total Construction Phase $20,500.00 Reimbursable Expenses Printing, Graphics,Communications, Couriers,Express Mail,Etc $750.00 Total Reimbursable Expenses $750.00 Total Estimated Labor Expenses are $79,000.00 Total Estimated Reimbursable Expenses are $750.00 The time period for this work authorization will be: Survey Phase 45 Days Design&Permitting Phase 120 Days Construction Services Phase(estimate) 180 Days CITY: CITY OF AVENTURA,FLORIDA through its City Manager BY City Manager Eric M. Soroka,ICMA-CM day of ,2013 Notice to Proceed Yes No Project Initiation Date RECOMMENDED through its Capital Projects Manager BY a,%-tcrs.4o - V a-r-eot Capital Projects Manager `Antonio F. Tomei cv day of V U rl ism , 2013 Exhibit A Consultant shall prepare engineering plans for new FDOT compliant decorative street lights along the east side of Biscayne Boulevard from the north side of the Oleta River bridge to the southern terminus of Phase III, and from Aventura Boulevard to NE 213th Street, including the northbound frontage road along Biscayne Boulevard. The project excludes the Biscayne Boulevard overpass and approaches at Ives Dairy Road/NE 203rd Street. Consultant will more specifically perform the following: • Prepare Design Survey to be used as a base plan for the electrical design. • Prepare engineering design plans, details and specifications for the new decorative street lights, and the removal of the existing street lights. • Prepare Engineer's Opinion of Probable Construction Cost for the proposed improvements. • Coordinate revisions to the maintenance covenant agreement between Aventura and Miami-Dade County. • Prepare and submit construction permit applications. • Process permit applications through local and state agencies. • Prepare technical specifications. • Prepare bid documents. • Respond to requests for additional information during the bid phase. • Evaluate bids and provide bid award recommendation • Construction services, including periodic observation of the work to assure conformance with specifications and drawings. CITY OF AVENTURA CONSTRUCTION COST ESTIMATE BISCAYNE DECORATIVE STREET LIGHTING PHASE 4 BASED ON EXISTING POLE COUNT PHASE IV POTENTIAL QUANTITIES Probable Cost Based on Horsepower Electric,Inc.Phase HI Additive Bid Prices Item Description Unit Approx. Unit Price Extended Cost Quantity 1 GENERAL CONDITIONS LS 1 see below see below 2 MOBILIZATION LS 1 see below see below 3 MAINTENANCE OF TRAFFIC LS 1 ALLOWANCE FOR CITY OF AVENTURA POLICE see below see below 4 DEPARTMENT PRESENCE($40/HR) AL 1 $40,000.00 $40,000 715-14-12 PULL BOX(ROADSIDE)(28"X 18"X 12")(FBI) EA 36 $1,000.00 $36,000 715-11-119 LIGHT POLE COMPLETE(WITH TWO FIXTURES)(F&I) EA 36 $15,700.00 $565,000 715-1-13 CONDUCTOR#2(F&I) LF 15912 $1.50 $24,000 715-1-13 CONDUCTOR#4(F&I) LF 13806 $1.25 $17,000 715-2-25 CONDUIT 2"HDPE(DIRECTIONAL BORED)(F&I) LF 1287 $35.00 $45,000 POLE CABLE DISTRIBUTION SYSTEM 715-500-1 (CONVENTIONAL)(F&I) EA 72 $1,300.00 $94,000 715-550-000 EXISTING LIGHT POLE TO BE REMOVED COMPLETE EA 36 $250.00 $9,000 715-7-21 MODIFY EXISTING SERVICE POINT,COMPLETE LS 2 $5,000.00 $10,000 PURCHASE LIGHT POLE COMPLETE(WITH TWO FIXTURES) 13 AND DELIVER TO CITY OF AVENTURA EA 1 $14,000.00 $14,000 Sub-total Lighting= $854,000 Less General Conditions Lump Sum Price(as a percentage of Sub-Total Lighting Price)= 3.0% $26,000 Less Mobilization Lump Sum Price(as a percentage of Sub-Total Lighting Price)= 2.0% $17,000 Less Maintenance of Traffic Lump Sum Price(as a percentage of Sub-Total Lighting Price)= 2.0% $17,000 Equals Estimated Phase IV Probable Construction Cost= $914,000 01-0103-164 6/5/2013 I