Loading...
2012-32RESOLUTION NO. 2012-32 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF AVENTURA, FLORIDA AUTHORIZING THE CITY MANAGER TO EXECUTE THE ATTACHED BASIC SERVICES AGREEMENT BETWEEN THE CITY OF AVENTURA AND PGAL ARCHITECTS TO PERFORM ARCHITECTURAL AND ENGINEERING SERVICES TO DESIGN AND PERMIT THE CITY'S GOVERNMENT CENTER PARKING EXPANSION PROJECT IN ACCORDANCE WITH RFQ NO. 11- 9 -21 -2; AUTHORIZING THE CITY MANAGER TO DO ALL THINGS NECESSARY TO CARRY OUT THE AIMS OF THIS RESOLUTION; AND PROVIDING AN EFFECTIVE DATE. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF AVENTURA, FLORIDA, THAT: Section 1. The City Manager is hereby authorized to execute the attached Agreement ( the " Agreement" ), in substantially the form attached hereto, between the City of Aventura and PGAL Architects to perform architectural and engineering services to design and permit the City's Government Center Parking Expansion Project in accordance with RFQ No. 11- 9 -21 -2. Section 2. PGAL Architects has completed pre- design work in accordance with Resolution No. 2011 -65. Section 3. The City Manager is hereby authorized to do all things necessary to carry out the aims of this Resolution and the Agreement. Section 4. This Resolution shall become effective immediately upon its adoption. The foregoing Resolution was offered by Commissioner Joel, who moved its adoption. The motion was seconded by Commissioner Auerbach, and upon being put to a vote, the vote was as follows: Commissioner Zev Auerbach yes Commissioner Bob Diamond yes Commissioner Billy Joel yes Commissioner Michael Stern yes Commissioner Luz Urbaez - Weinberg yes Vice Mayor Teri Holzberg yes Mayor Susan Gottlieb yes Resolution No. 2012 -32 Page 2 PASSED AND ADOPTED this 10th day of July, 2012. usan Gottlieb, Ktfayor ATTEST: L 'fl 9 resa M. ok , MMC y Clerk Tj Approved as to Form and Legal Sufficiency: City Attorney a t June 22, 2012 Mr. Eric M. Soroka City Manager City of Aventura Office of the City Manager 19200 West Country Club Drive Aventura„ FL 33180 Re: Aventura Government Center Parking Expansion (Basic Services Proposal) Dear Mr. Soroka: PGAL is pleased to present this proposal for Basic Services for the new Aventura Government Center Parking Expansion project. The design has been approved by the City and the initial pre- design services have been completed. We also submitted the drawings for the site plan /variance approval on 5/31/12. A. SCOPE OF SERVICES The approved design is a three level parking garage with approximately 208 spaces. The first floor will house the police department vehicles and service areas. The upper levels will be for visitors and staff. The existing generator and vehicle fueling area will remain. See Exhibit A.1 for revised Scope of Work. B. COMPENSATION The fixed fee for the above services shall be $210,000. (See Exhibit B.1) The following is a breakdown of the fee: 50 % Construction Documents - 38% $ 79,800 100% Construction Documents - 37 %0 $ 77,700 Permitting and Bid Negotiations - 5 $ 10,500 Construction Administration - 20 % $ 42,000 The following expenses are in addition to Basic Services: 1. Expense of reproductions for submittal to agencies having jurisdiction over the project or for the Owners or Contractors use. 2. Expense of courier or overnight delivery. 3. Mileage expense from the City of Boca Raton as the point of origin. 4. Other expenses only as authorized in advance by the Owner. Payment to PGAL is due thirty days after receipt of invoice and is delinquent beyond that time, when an additional charge of 1'% per month, simple interest will be added. Invoices will only be rendered after services have been completed or on a monthly basis as a percentage of completion. 791 Park of Commerce Boulevard Suite 400 Boca Raton, FL 33487 (P) 561 988 4002 [F) 561 988 3002 AA0003337 EBOD00824D C. ADDITION AUOPTIONAL SERVICES The following items are not included in Basic Services: 1. Modification to approved conceptual plans 2. Security Design 3. Parking Access Controls Design 4. Cost Estimating 5. Signage & Graphics Design 6. Additional Surveys 7. Geotechnical Engineering 8. Special Inspections 9. Record (as built) Drawings 10. Perspective renderings, computer animations or models 11. Expense of color reproductions for presentation documents 12. Expense of filing or permit fees .See Exhibit B.1 for above items where fees have been determined. Any additional services requested shall be billed at a mutually agreeable fixed fee or at the following PGAL Hourly Rate Schedule. Principal $190.00 Project Manager / Designer $185.00 Project Architect $175.00 Job Captain $125.00 Technical / CAD Drafting $ 85.00 Clerical $ 80.00 D. PROJECT SCHEDULE The above services will be provided and completed based upon the following schedule based upon working days and receipt of Notice -to- Proceed from City, 50 % Construction Documents 30 days 100% Construction Documents 30 days Permitting and Bid Negotiations 45 days (estimated) Construction Administration 330 days (estimated) If the terms of this Agreement meet with your approval, please sign and return one (1) copy of this letter as authorization to proceed. We look forward to working with the City of Aventura to meet your growing needs. incer , [an A. Nestler, AIA, LEED AP Principal Attachments: Exhibit A.1 Scope of Work Exhibit B.1 Fee Distribution cc — File Joby Balint Rodney Crockett 2 AGREED AND ACCEPTED This day of 2012 By: Title: EXHIBIT A.1 SCOPE OF WORK GOVERNMENT CENTER PARKING EXPANSION PROJECT DESCRIPTION The project consists of a new parking structure adjacent to City Hall and will replace a portion of the existing surface lot. The existing lot primarily serves visitors, City staff and Police and an undetermined number of spaces will need to be maintained throughout construction. It is envisioned that the new structure will contain approximately 208 spaces or as many as feasible for the Final Construction Budget. Current budget is $3,400,000, but may be adjusted slightly by the City at their discretion. An existing Police Vehicle Fueling and Maintenance Area are to remain in the existing location on site. Also the existing generator and enclosure will remain. in the current location on site. The project is anticipated to be competitively bid. SERVICES The Pre - design Phase is now complete. Basic Services for the project include architectural, structural, mechanical, electrical, plumbing, fire protection, landscape, and civil engineering. Services are broken down into two components: 1) Basic Services and 2) Optional /Supplemental Services. Basic Services Scope will be based on the approved Final Concept and will include a 50 %fl CD submittal as well as a 100% CD submittal In addition bidding and permitting phases are included. The fees for these services are as outlined on Exhibit B.I. Optional /Supplemental Services include Security Design, Parking Access Controls, and Signage & Graphics as optional items. Also, listed on this exhibit are Supplemental items which are required for the project such as the Tree Survey and the Geotechnical Engineering services. SCHEDULE The drawings for the site plan approval /variance package were submitted May 315`, '2012. The construction document phase will begin immediately after the site plan /variance has been approved. We will submit 50 % CD's for review and comment (30) working days after receiving the site plan /variance approval. The 100% CD phase will be completed (30) working days after receiving review comments related to the 50% CD submittal and a notice to proceed. The drawings will then be issued for bidding and permitting purposes. EXHIBIT B.1 Government Center Parking Expansion Fee Distribution Pre - Design Phase Complete Basic Services Phase Task % Gross Fee Modification to approved conceptual plans Basic Services 2 Security Design 1 50 % Construction Documents 38 % $ 79,800 2 100% Construction Documents 37 % $ 77,700 3 Permits, Bid & Award 5 % $ 10,500 4 Construction Administration 20 % $ 42,000 8 Special Inspections TBD 9 Total Basic 100% $ 210,000 Optional 1 /Supplemental Services Task Gross Fee Modification to approved conceptual plans TBD 2 Security Design TBD 3 Parking Access Controls $4,000 4 Cost Estimating TBD 5 Signage & Graphics Design $4,000 6 Tree Survey $1,800 7 Geotechnical Engineering $7,630 8 Special Inspections TBD 9 Record (as- built) Drawings TBD 10 Perspective renderings, computer animations TBD 11 Expense of color reproductions TBD 12 Expense of color filing or permit fees TBD Total Supplemental 1 $ 17,430 Expenses $ 4,800 TOTAL $ 232,230 | % ,gilt � \ \ ƒ � � - | � | � « ! ! §.� 22 )_\ ` ,!! \ ; |i {■ . 2m\�` dA2 7. ! n a £ €saF ry €8�9mJOmos..i'� CC)) -1 i � m