Loading...
01-19-2012Susan Gottlieb Mayor Eric M. Soroka ICMA -CM Auerbach ale X X City Bo G7b Diamond Teresa M. M. Soroka, MMC Billy Joel Teri Holzberg �- • Gb{ Aaorne� Michael Stern Weiss Scrota Hellman Luz'Urbiez Weinberg Pastoriza Cole & Boniske AGENDA JANUARY 19, 2012 9 AM Aventura Government Center 19200 West Country Club Drive Aventura, Florida 33180 1. CALL TO ORDER/ROLL CALL 2. RESOLUTION: A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF AVENTURA, FLORIDA AWARDING AND LETTING A BID/CONTRACT FOR BID NO. 12 -12 -16-2, CITY OF AVENTURA GOVERNMENT CENTER THIRD FLOOR RENOVATIONS FOR POLICE TRAINING, TO CITYWORKS CONSTRUCTION, LLC AT THE BID PRICE OF $329,289; AUTHORIZING THE CITY MANAGER TO EXECUTE ASSOCIATED CONTRACTS; AUTHORIZING THE CITY MANAGER TO TAKE NECESSARY AND EXPEDIENT ACTION TO CARRY OUT THE AIMS OF THIS RESOLUTION; PROVIDING FOR THE APPROPRIATION AND ALLOCATION OF FUNDS FOR SAID BID AWARD; AND PROVIDING FOR AN EFFECTIVE DATE. 3. MOTIONS: A. MOTION TO EXTEND THE TIME TO OBTAIN A BUILDING PERMIT FOR THE CONSTRUCTION OF THE NEW NORTHEAST PUBLIC LIBRARY BRANCH FOR A FURTHER SIXTY (60) DAYS FROM JANUARY 4, 2012 TO MARCH 4, 2012 B. MOTION AUTHORIZING THE APPROPRIATION OF UP TO $365,418 FOR THE GOVERNMENT CENTER THIRD FLOOR RENOVATIONS FOR THE POLICE TRAINING PROJECT FROM THE POLICE FEDERAL AND STATE FORFEITURE FUNDS IN ACCORDANCE WITH THE CITY MANAGER'S MEMORANDUM 4. ADJOURNMENT This meeting is open to the public. In accordance with the Americans with Disabilities Act of 1990, all persons who are disabled and who need special accommodations to participate in this meeting because of that disability should contact the Office of the City Clerk, 305 -466 -8901, not later than two days prior to such proceeding. One or more members of the City of Aventura Advisory Boards may be in attendance and may participate at the meeting. Anyone wishing to appeal any decision made by the Aventura City Commission with respect to any matter considered at such meeting or hearing will need a record of the proceedings and, for such purpose, may need to ensure that a verbatim record of the proceedings is made, which record includes the testimony and evidence upon which the appeal is to be based. Agenda items may be viewed at the Office of the City Clerk, City of Aventura Government Center, 19200 W. Country Club Drive, Aventura, Florida, 33180. Anyone wishing to obtain a copy of any agenda item should contact the City Clerk at 305466 -8901. CITY OF "ENTURA OFFICE OF THE CITY MANAGER MEMORANDUM TO: City Commission FROM: Eric M. Soroka, ICMA -CM, DATE: January 6, 2012 SUBJECT: City of Aventura - Government Center Third Floor Renovations for Police Training - Bid No: 12- 12 -16 -2 January 19, 2012 City Commission Meeting Agenda Item J- Recommendation It is recommended that the City Commission adopt the attached Resolution awarding Bid No. 12- 12 -16 -2, City of Aventura - Government Center Third Floor Renovations for Police Training to the lowest responsible and responsive bidder, Cityworks Construction, LLC for the price of $329,289. Background In July of 2011, The City Commission authorized funding from the Police Forfeiture Fund for the cost of architectural services to prepare plans to renovate the third floor of the Government Center for a police training area. The renovation would provide additional training facilities for the Police Department. The new training area includes a classroom, defensive tactics area and a room for simulated firearms training. The project also includes expanding the Information/Technology offices by reducing a portion of an unused area in the employee lunch room. The attached diagrams show the existing layout of the third floor and the proposed renovations. The plans were completed by the architectural firm of PGAL and the project was placed out for competitive bid. In accordance with the City's Purchasing Ordinance, bids for this project were solicited, advertised, and opened on December 16, 2011. The City received twelve (12) bids for this project. The following three (3) lowest bids were reviewed: City Works Construction $329,289.00 Anatom Construction Company $356,805.00 T &G Constructers $364,826.00 The bid price allows for interior improvements to the third floor of the Government Center. Improvements include but are not limited to architectural, interior finishes, low voltage wiring and audio /visual work. Electrical and plumbing demolition and renovation work is also included. The total cost of the project including equipment is estimated to be $420,622 based on the following breakdown: Construction cost $329,289 Equipment 67,000 Information Technology Costs 19,335 Permitting 5,000 $420,622 The project is funded primarily from Forfeiture and Impact Fee funds as follows: Police Capital Outlay Impact Fee fund $ 35,204 State Police Forfeiture Fund 83,335 Federal Police Forfeiture fund 282,083 General Fund 20,000 $420,622 If you have any question, please feel free to contact me. EMS/ RESOLUTION NO. 2012- A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF AVENTURA, FLORIDA AWARDING AND LETTING A BID /CONTRACT FOR BID NO. 12- 12 -16 -2, CITY OF AVENTURA GOVERNMENT CENTER THIRD FLOOR RENOVATIONS FOR POLICE TRAINING, TO CITYWORKS CONSTRUCTION, LLC AT THE BID PRICE OF $329,289; AUTHORIZING THE CITY MANAGER TO EXECUTE ASSOCIATED CONTRACTS; AUTHORIZING THE CITY MANAGER TO TAKE NECESSARY AND EXPEDIENT ACTION TO CARRY OUT THE AIMS OF THIS RESOLUTION; PROVIDING FOR THE APPROPRIATION AND ALLOCATION OF FUNDS FOR SAID BID AWARD; AND PROVIDING FOR AN EFFECTIVE DATE. WHEREAS, the City Manager has, pursuant to the various laws of the State of Florida and the Code of the City of Aventura, properly solicited and accordingly accepted bids for BID NO. 12- 12 -16 -2, City of Aventura Government Center Third Floor Renovations for Police Training; and WHEREAS, sealed bids have been submitted to and received by the City pursuant to the City's Invitation to Bid /Notice to Bidders, specifications, proposals, and requirements for the project/work as cited above; and WHEREAS, staff has determined that Cityworks Construction, LLC has submitted the lowest responsible and responsive bid for said project/work; and WHEREAS, the City Commission, upon the recommendation of the City Manager, is therefore desirous of awarding said bid /contract to said lowest responsible and responsive bidder. NOW THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF AVENTURA, FLORIDA: Section 1: That bid /contract for BID NO. 12- 12 -16 -2, City of Aventura Government Center Third Floor Renovations for Police Training, is hereby awarded to Cityworks Construction, LLC in the amount of $329,289.00. Section 2: That the City Manager is hereby authorized to execute, on behalf of the City, a contract by and between the parties embodying the terms, conditions, and Resolution No. 2012 - Page 2 specifications as set forth in the subject Invitation to Bid /Notice to Bidders, bid specifications, bid proposal and bid requirements, or if a City prepared contract was part of said bid proposal, said parties shall execute said prepared contract on behalf of the City. Section 3: That the City Manager is hereby authorized and requested to take all necessary and expedient action to carry out the aims of this Resolution in awarding this bid /contract. Section 4: That the funds to be allocated and appropriated pursuant hereto and for the purpose of carrying out the tenets of this Resolution shall be from the Federal Forfeiture Fund ($282,083), Police Capital Outlay Impact Fee Fund ($27,206) and the General Fund ($20,000). Section 5: This Resolution shall be effective immediately upon its adoption. The foregoing resolution was offered by Commissioner , who moved its adoption. The motion was seconded by Commissioner , and upon being put to a vote, the vote was as follows: Commissioner Zev Auerbach Commissioner Bob Diamond Commissioner Teri Holzberg Commissioner Michael Stern Commissioner Luz Urbaez Weinberg Vice Mayor Billy Joel Mayor Susan Gottlieb Resolution No. 2012 - Page 3 PASSED AND ADOPTED this 19th day of January, 2012. SUSAN GOTTLIEB, MAYOR ATTEST: TERESA M. SOROKA, MMC CITY CLERK APPROVED AS TO LEGAL SUFFICIENCY: CITY ATTORNEY 0 T 0 0 .Zl .Z7 0 u 0 cn m 0 NOW MOM hIM i t --------------------------------- I L -- ----------------------------- - - - - -- J x v T r O O m x z L7 v z .�� December 22, 2011 Mr. Tony Tomei Capital Projects Manager City of Aventura Office of the City Manager 19200 West Country Club Drive Aventura, FL 33180 Re: Aventura Government Center Third Floor Renovations for Police Training Contractor Bid Evaluation and Recommendation Dear Mr. Tomei: PGAL has received and reviewed twelve Contractor bids for the above referenced project. In general PGAL found no significant items of concerns with the bids and have only worked with one of the Contractors in past experience, which is Sisca Construction Services. A copy of the bids was provided to TLC for their review of the MEP portion of the project. In general TLC found no significant items of concerns with the bids and MEP sub- contractors. The three apparent low bid Contractors are as follows; Cityworks Construction, LLC at $329,289.00, Anatom Construction Company at $356,805.00, and T &G Constructors at $364,826.00. The pre -bid meeting was not required; however the drawings required the contractors to visit the project site to become familiar with existing conditions. To the best of my knowledge, of the three Contractors only Cityworks and T &G Constructors attended the pre -bid meeting to review the project area. Only T &G Constructors submitted questions for clarification to be answered in Addendum #1. The project area is approximately 3,500 square feet and based upon a square foot comparison; the lowest was $94 per square foot, the next was $102 per square foot, and the highest was $104 per square foot. The order of magnitude estimate by PGAL was projected to be $106 per square foot for this project. However, competitive bids can result in a lower cost than a projected estimate. Based upon the above analysis; Cityworks Construction, LLC is the lowest responsive bidder. PGAL also reviewed the add alternates and found no significant items of concerns. Since the alternates are below the projected budget; PGAL does recommend the City to 791 Park of Commerce Boulevard Suite 400 Boca Raton, FL 33487 [P] 561 988 4002 [F] 561 988 3002 AA0003337 EB00008240 accept the add alternates to repaint and re- carpet the third floor main building corridor. The alternates are incorporated into the base bid amounts listed above. Should there be any questions do not hesitate to contact me at 561- 988 -4002. Sincerely, Joby L. Balint, AIA, LEED AP Associate Principal cc — File Indra Sarju 2 SECTION 00410 BASE )E3 D SCREDIVIA OF VALUES' BASED UPON THE MASTERFORMAT 1995 VERSION CSI 16 DIVISIONS Division Division Description Unit Division, Cost 1 GENERAL CONDITIONS LS $ l V , W" !w 1 BONDS LS $ 1 n, Fj0Q 1 DEMOI.II`ION LS $ t 0 , ZC 3 CONCRETE LS FF ov $ t ► ten 4 MASONRY LS $ 5 METALS LS 6 WOODS AND PLASTICS LS $-A 150, G! 7 THERMAL AND MOISTURE LS $_ (ra o PROTECTION 8 DOORS AND WINDOWS LS arm $�� o� 9 FINISHES LS $ �.� 7 "b, IO SPECIALTIES LS $ Z�j, J��•�,1,v II EQUIPMENT LS $ 12 FURNISHINGS LS $ 2, 900 'iv fl 13 SPECIAL CONSTRUCTION LS $_ 6 �w 15 MECHANICAL LS $ 3 SCE .0-04- 16 ELECTRICAL LS tp $_ 4!71 500 OVERHEAD AND PROFIT LS $.,,_�6 � �w- TOTAL BASE BID $ City of Aventura - Government Center Third Floor. Renovations for Police Training City of Aventura Bid Na 12 -12 -16-2 PGAL Project No. 81001315.00 00410-4 ADD ALTERNATES ADD ALTERNATE #1: Provide two finish coats of paint at the third floor corridor walls (existing) as described on sheets A2,03 and A9A3. The lump sum price for this alternate shall include all protection, cleaning, and ,o move and re- install metal lockers Iocated in the corridor. $ i w ADD ALTERNATE #2: Remove the existing carpet at the third floor corridor and install new carpet as described on sheets A2,30 and A9.03. The lump sum price for this alternate shall include floor preparation and to move and re- install metal Iockers located in the corridor. $ P. ALL WORK SHALL COMPLY WITH THE REQUIREMENTS AS OUTLINED IN THE PROJECT DOCUMENTS, CURRENT BUILDING CODES, AND MANUFACTURER'S REQUIREMENTS TO MAINTAIN PRODUCT WARRANTIES. 2. , WHEN THE CONTRACT IS A WARDED, THIS DOCUMENT BECOMES A SUPPLEMENT TO THE OWNER AND CONTRACTOR AGREEMENT. 3. NOT t�LL DIVLSIONS ABOVE MAY REQUIRE A DOLLAR VALUE TO BE LISTED. THE DIVISIONS LISTED_ABOVE AREFOR THE PURPOSE OF A GENERAL ANALYSIS AT THE TIME OF THR BID. THE SELECTED _CONTRACTOR WILL PROVIDE A MORE DETAILED SCHEDULE OF VALUES ON THE AIA DOCUMENT G703 WHEN SUBMITTING THE AIA DOCUMENT G702 APPLICATION FOR PAYMENT. 4. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH ES'T'ABLISHED METHODS AND PRACTICES. ALL WORK SHALL HE SUBJECT TO THE APPROVAL OF THE CITY'S CONSULTANT OR STAFF BEFORE FINAL PAYMENT IS MADE City of Aventura - Government Center lltird Floor Renovations for Police Training City of Aventura Hid No. 12 -12 -16.2 PGAI. Project No. 81001315.00 00410-5 D z W Q LL O z O a J D Q �m U Q H W U O J N a to O LL .Q Z O � 0 H W z W U H z W 2 z N �a T LZ cc *E oQ mlo N L .0 C Q O m E L V yam+ N_ d 0 d 0 0 J d 0 0 0 0 7 co V m L= O N N N co N N N N N N p O m �- >- �• L a V CD E a U) 0 aNi aNi aNi aNi aNi m aNi m W 0 �- QY V Q O o ° ° O O o O to 0! o O ° ° O O O O o O O L N c ti N O 000 O O O tU) 0) a� nj O t0 60- V 69 O �, 07 O 69. 00 69 O 6f} O O O O O O O C O O O O O O O O O O O O C000 O CO O 0! O O O C O O L 1- 00 to O 00 r O O N N Q o 69 69 6 44 6 to � 6g 6$ m O O 0 00 O O O O O O N N N d CM oo CD Q O O O m •i !F to 00) et to a LO ti r ti M � M CO) M M ti CO) co IV et 0) CO) M p 64). 69 63 69 64 Vk 6A 69 69 6g H O v C_ td U L = v -j 0 0 — J J O U 7 + L J v v ci _ CF c C _ o E m vi _ •« V r r— E O 0 0 p m c ± U) —j c c a-- O U z L 7 p 2 E O U °� O '0) N O V N N v U tti N N N +L+ N c +O+ 0 U N• 'a •E O O O c o c U U U U Q Q U a C9 U) N LL W N m ayi O O 0 4) o O O O CD O O co C4 t0 r w M CD O O c N co cm P O LO O O O le O cc 1- N M fA le ER O O ca -a N ,O r LL V � 4) t H r o c 0 E C9 to C � d Cl) H I` L a� O O o O O O N w M � K3 P O N O ca O N O O O O cu C) O O co O E M O C N 69} I` O O L Ef} y... 0 .0 �_ c O .c L E cu U O cu O «+ O CU >+ cu 00 cn O lqt _T O Q 0 N N O "O L A Q N 0) > N m t U ~ U N N ca p E2 cu 0 a) >; 4 O L E a 0 C 2 ca N ca -a ca ca m �. U O > 0 cc = C (n N L H CD � Q O 0 co co E p > N Y N = ca m N a) 0 O o V N E LL i p C 0 C m O ev O Z N y Q O o N 7 N ca d CITY OF AVENTURA COMMUNITY DEVELOPMENT DEPARTMENT MEMORANDUM TO: City Commission FROM: Eric M. Soroka, ICM City Manager BY: Joanne Carr, Al Community Developme irector DATE: December 28, 2011 SUBJECT: Request of Miami -Dade County Public Library System for extension of time to obtain a building permit for the Northeast Public Library Branch at 2930 Aventura Boulevard (01- VAR -11 EXT) January 19, 2012 City Commission Meeting Agenda Item A ea- Irl RECOMMENDATION It is recommended that the City Commission approve a motion to extend the time to obtain a building permit for the construction of the new Northeast Public Library Branch for a further sixty (60) days from January 4, 2012 to March 4, 2012. THE REQUEST The applicant, Miami -Dade Public Library System, is requesting approval of a motion to extend the time to obtain a building permit for the Northeast Public Library Branch at 2930 Aventura Boulevard approved by Resolution No. 2010 -28 adopted on May 4, 2010. BACKGROUND OWNER OF PROPERTY Dade County APPLICANT Julio E. Castro, Library Capital Development Co- ordinator, Miami -Dade Public Library System ADDRESS OF PROPERTY 2930 Aventura Boulevard LEGAL DESCRIPTION Part Tract G, Aventura Second Addition, according to the plat recorded in Plat Book 99, Page 21, Public Records of Miami -Dade County, Florida ZONING B2 Community Business District The Site — The site is located on the south side of Aventura Boulevard at NE 29 Avenue with a municipal address of 2930 Aventura Boulevard, City of Aventura. It is bounded by the Miami -Dade Fire Rescue station to the west, a retail plaza to the east, Aventura Boulevard to the north and the Aventura Mall property to the south. The Project — The applicant was granted variance approval by Resolution No. 2010 -28 adopted by the City Commission on May 4, 2010 to allow 42 parking spaces where 79 parking spaces are required by City Code. One of the conditions of approval of the variance was that ... "Permits shall be obtained within twelve (12) months of the date of the Resolution or the approvals granted shall be deemed null and void unless extended by a motion of the City Commission." The twelve month time limit expired on May 4, 2011. At the request of the County, a motion to extend the time for a further six months to November 4, 2011 was approved by the City Commission at its April 5, 2011 meeting. At its meeting of November 11, 2011, the City Commission further extended the time for 60 days from November 4, 2011 to January 4, 2012, at the request of the County, to allow it to conclude the bid award process. City staff is now advised that, on December 19, 2011, the County Commission awarded, approved and authorized execution of the Northeast Branch Library construction contract. County staff is requesting a sixty (60) day extension of the time in which to obtain a building permit from the City, from January 4, 2012 to March 4, 2012, in order to complete all required documents with its contractor. 2 RE: NE Library - Request for extension on the Building Permit Application Page 1 of 4 RE: NE Library - Request for extension on the Building Permit Application Marrero, Asael (ISD) [ASAELM @miamidade.gov] Sent: Thursday, December 22, 20115:16 PM To: Raul Rodriguez; Joanne Carr Cc: Janet Lopez Attachments: 112596[1].pdf (3 MB) ; Z00086 Request For Extensi —l.pdf (116 KB) ; Z00086 Request for Permit —1.pdf (114 KB) Ms. Carr / Mr. Rodriguez, The Miami Dade County Commission approved on December 19, 2011 a resolution awarding, approving and authorizing the execution by the County Major of a contract in the amount of $10,408,760.00 between Miami - Dade County and Miami Skyline Construction Corp. for the construction of the new Northeast Branch Library, Contract No Z00086 (see attached document). Via this email and attached documents, I would like to request an extension on the Parking Variance and Building Process Number thru February / March 2012 to complete all required contract documents with Miami Skyline, obtain all required permits. We are very close to breaking ground on this project. Thanking you in advaced for your continued assistance on this project, p.s. Happy holidays and best wishes for a wonderful 2012. Asael Ace Marrero, AIA, Architect Manager, Architecture and Engineering Section Internal Services Department Design and Construction Services Division 111 NW 1st Street, Suite 2420, Miami, Florida 33128 -1909 305 -375 -1115 Phone 305 - 375 -1125 Fax 305 - 336 -5579 Cell www.miamidade.gov /qsa "Delivering Excellence Every Day" Please consider the environment before printing this email Miami -Dade County is a public entity subject to Chapter 119 of the Florida Statutes concerning public records. E -mail messages are covered under such laws and thus subject to disclosure. Memorandum "® Date: December 22, 2011 To Raul Rodriguez, Building Official City of Aventura Community Develop nt artment 19200 W. Country lub Drive Aventura, FI 331 3 From: Asael Marrero, IA, Architect A &E Section M nager Design and Construction Services visio Internal Services`Department Subject: Request for Permit Number Extension 10 -2135 GSA Project No Z00086 GSA Project Name Northeast Library Project Address. 2930 Aventura Boulevard, City of Aventura, Florida 33128 We respectfully request an extension for the plans review process for the above referenced project. The contractor selection process has been recently completed. Miami Dade County's ISD Design and Construction Services Division will be in charge of the construction phase, which will be ready to commence sometime in February / March 2011 Updates since last extension granted on November 7, 2011 1 November 15, 2011 Bid protest filed by N &J Construction. 2. December 1, 2011 Bid protest hearing. The hearing officer ruled on favor of the County's position, and as a result, the bid protest from N &J Construction was denied. 3 December 19, 2011 The Miami Dade County Commission approved on December 19, 2011 a resolution awarding, approving and authorizing the execution by the County Major of a contract in the amount of $10,408,760.00 between Miami -Dade County and Miami Skyline Construction Corp 4 December 30, 2011 10 -day period for the mayoral veto is over 5 January 2, 2012 Notice of Award can be issued to Miami Skyline. Should you have any questions regarding this notification, please contact me at 305- 375 -1115 cc: Joanne Carr, AICP, Community Development Director, City of Aventura. CITY OF AVENTURA OFFICE OF THE CITY MANAGER MEMORANDUM TO: City Commission FROM: Eric M. Soroka, ICMA -CM, Ci nag r DATE: January 10, 2012 SUBJECT: Disbursement of Police Forfeiture Funds January 19, 2012 City Commission Meeting Agenda Item RECOMMENDATION It is recommended that the City Commission adopt the following Motion to expend funds from the Police Forfeiture Fund: "Motion authorising the appropriation of up to $365,418 for the Government Center Third Floor Renovations for the Police Training Project from the Police Federal and State Forfeiture Funds in accordance with the City Manager's memorandum." If you have any questions, please feel free to contact me. EMS /act Attachment CCO1765 -12 CITY OF AVENTURA POLICE DEPARTMENT INTER OFFICE MEMORANDUM TO: Eric M. Soroka, City Manager FROM: 1v nberg, RZMfof P me DATE: 11 January 2012 SUBJECT: Use of Forfeiture Funds Florida State Statute 932.704 requires that money resulting from forfeitures be maintained in a special law enforcement trust fund, and that the funds be expended only upon request of the Chief of Police to the governing body of the municipality and approval of the governing body. I am requesting City Commission approval for the expenditure of: Police Training Center build out $83,335 I certify that this requested expenditure complies with Florida State Statute 932.704 in that 1. Funds will be used for an appropriate law enforcement purpose. 2. Funds are not being used as a normal source of revenue for the Police Department. 3. Funds were not considered in the adoption and approval of the budget of the Police Department. The Federal Equitable Sharing Agreement (FESA), Section VIII allows for the use of federally forfeited funds for law enforcement. Section IX, A9 of the Federal Equitable Sharing agreement requires that the funds be expended only upon request of the Chief of Police to the governing body of the municipality and approval of the governing body. I am requesting City Commission approval for the expenditure of. Police Training Center build out $282,083 Total amount of funds being requested: $365,418 Summary Police Department Training Center build out - This is a request to encumber and spend up to $365,418 of both State and Federal forfeiture funds to build and equip a police department trainiv center on the 3nd floor of the Government Center. Existing space on the 3 floor will be renovated to accommodate this build out. Upon completion the new training center will include a classroom, defensive tactics area, firearms and less than lethal simulation room and office space for the members of the Personnel & Training Unit. This training area is necessary so that officers can maintain their skill sets in defensive tactics, use of firearms and less than lethal weapons. These skills quickly perish if not maintained on a regular basis. Officers could attend this training at their station without having to drive long distances to multiple centers to receive the various training that will be presented at the new center. Additionally, officers can attend short training sessions while on duty and not have to leave the city to do so.