Loading...
2011-57RESOLUTION NO. 2011 -57 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF AVENTURA, FLORIDA, AUTHORIZING THE CITY MANAGER TO EXECUTE ATTACHED WORK AUTHORIZATION NO. 01- 0103 -151 FOR PROFESSIONAL DESIGN SERVICES FOR THE NE 191 STREET, NE 188 STREET, NE 185 STREET AND NE 31 AVENUE ROAD RESURFACING IMPROVEMENTS PROJECTS BY AND BETWEEN THE CITY OF AVENTURA AND CRAVEN THOMPSON AND ASSOCIATES, INC.; AND PROVIDING AN EFFECTIVE DATE. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF AVENTURA, FLORIDA, THAT: Section 1 The City Manager is hereby authorized to execute attached Work Authorization No. 01- 0103 -151 ($80,100) for professional design services for the NE 191 Street, NE 188 Street, NE 185 Street and NE 31 Avenue Road Resurfacing Improvements projects by and between the City and Craven Thompson and Associates, Inc. Section 2 The City Manager is authorized to do all things necessary to carry out the aims of this Resolution. Section 3 That the funds to be allocated and appropriated pursuant hereto and for the purposes of carrying out the tenets of this Resolution shall be from Budget Line Item Number 120- 5001 - 541 -6305. Section 4 This Resolution shall become effective immediately upon its adoption. The foregoing Resolution was offered by Commissioner Joel, who moved its adoption. The motion was seconded by Commissioner Holzberg, and upon being put to a vote, the vote was as follows: Commissioner Bob Diamond Commissioner Teri Holzberg Commissioner Billy Joel Commissioner Michael Stern Commissioner Luz Urbaez Weinberg Vice Mayor Zev Auerbach Mayor Susan Gottlieb yes yes yes yes absent yes absent Resolution No. 2011 -57 Page 2 PASSED AND ADOPTED this 4th day of October, 2011 ZEV ALdFkRbACH, VICE MAYOR ATTEST: / I • %iRO�A, APPROVED AS TO LEGAL SUFFICIENCY: CITY ATTORNEY WORK AUTHORIZATION NO. 01-0103-151 The City of Aventura has requested Work Authorization No. 01- 0103 -151 as provided for in the Agreement between the City of Aventura and Craven Thompson and Associates, Inc. and approved by the City Commission on July 3, 2001. This Work Authorization No 01- 0103 -151 provides for technical services in accordance with Articles 3, 4, 6, 7 and 8 of the Agreement as further detailed in the scope of services in Exhibit A. Payment for such services shall be in accordance with Article 5 of the Agreement. Design Phase Survey(Task No. 11050) .................................. ............................... .....................$23,800.00 Prepare Design Drawings (Task No. 34040) ......................... ............................... $35,500.00 Permitting (Task No. 31080) ............................. ............................... ......................$1,500.00 Project Management (Task No. 34040) ................................... ............................... $3,000.00 TotalDesign Phase ......................................... ............................... .....................$63,800.00 Bidding Phase Prepare Bid Documents (Task No. 34060) .............................. ............................... $2.450.00 TotalBidding Phase ......................................... ............................... ......................$2,450.00 Construction Phase Daily Site Visits (based on 90 day const) (Task No. 34070) ........... .....................$12,000.00 Project Closeout Documentation (Task No. 34070) ................... ............................... $750.00 TotalConstruction Phase ............................... ............................... .....................$12,750.00 Reimbursable Expenses Printing, Graphics, Communications (Task No. 34100) .................... ........................$800.00 Couriers, Express Mail, Etc (Task No. 34100) ... ............................... ........................$300.00 TotalReimbursable Expenses ......................... ............................... ......................$1,100.00 Total Estimated Labor Expenses are ...................................... ............................... $79,000.00 Total Estimated Reimbursable Expenses are ........................... ............................... $1,100.00 The time period for this work authorization will be: DesignPhase ............................... ............................... 90 Days Permitting Phase ......................... ............................... 30 Days Bidding Phase ............................. ............................... 75 Days Construction Services Phase (estimate) ..................... 90 Days CITY: CITY OF AVENTURA, FLORIDA through its City Manager BY City Manager Eric M. Soroka. ICMA -CM day of , 2011 Notice to Proceed Yes No Project Initiation Date RECOMMENDED through its Capital Projects Manager BY Capital Projects Manager — Ayntonio F. Tomei b day of S C R , 2011 Exhibit A Consultant shall prepare roadway milling, resurfacing and pavement marking drawings for the following area: NE 191" Street NE 191st Street from the east end of the turn lane at Biscayne Boulevard to the point of curvature for NE 29tb Avenue. This work encompasses approximately 700 LF of roadway. The construction limit will match the end of the construction limits for the milling and resurfacing previously completed on NE 29'h Avenue. Attached is an exhibit showing the limits of work. NE 188h Street NE 188th Street from NE 29`h Avenue east until the end of the roadway. This work encompasses approximately 2,600 LF of roadway. The construction limit will match the end of the construction limits for the milling and resurfacing previously completed on NE 2901 Avenue. Attached is an exhibit showing the limits of work. NE 185h Street & NE 31" Avenue NE 185th Street and NE 31St Avenue starting at Williams Island Boulevard and ending at the intersection of NE 185th Street and NE 28th Ct. This work encompasses approximately 2,300 LF of roadway. Attached is an exhibit of the work limits. Our scope of service shall include surveying, engineering design and construction services. Consultant will more specifically perform the following: ■ Prepare design survey. • Prepare roadway resurfacing and pavement marking plans. ■ Prepare Engineers' Cost Estimate for the proposed improvements. ■ Prepare technical specification for the inclusion into the City's Bid package. ■ Prepare Bid package and assist City in bidding the project. ■ Miscellaneous coordination with agencies, franchise utilities, and/or City. ■ Construction services, including periodic observation of the work to assure conformance with specifications and drawings.