2009-19RESOLUTION NO. 2009-19 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF AVENTURA, FLORIDA, AUTHORIZING THE CITY MANAGER TO EXECUTE THE ATTACHED AMENDMENT NO. 1 TO THE AGREEMENT FOR CONSTRUCTION MANAGEMENT SERVICES BETWEEN OWNER (CITY OF AVENTURA) AND CONSTRUCTION MANAGER (SUFFOLK CONSTRUCTION COMPANY, INC.) FOR THE CONSTRUCTION OF THE ARTS & CULTURAL CENTER PROJECT; ESTABLISHING THE GUARANTEED MAXIMUM PRICE FOR PHASE II AT $6,800,000;. AUTHORIZING THE CITY MANAGER TO DO ALL THINGS NECESSARY TO CARRY OUT THE AIMS OF THIS RESOLUTION; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the City Manager has negotiated Amendment No. 1 to Agreement for Construction Management Services and the establishment of the Guaranteed Maximum Price for Phase II; and WHEREAS, the City Commission, upon review, wishes to authorize the City Manager to execute Amendment No. 1 to the Agreement for Construction Management Services and establish the Guaranteed Maximum Price for Phase II with Suffolk Construction Company, Inc. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF AVENTURA, FLORIDA, THAT: Resolution No. 2009-19 Page 2 Section 1. The City Commission hereby authorizes the City Manager to execute the attached Amendment No. 1 to the Agreement for Construction Management Services between Owner (City of Aventura) and Construction Manager (Suffolk Construction Company, Inc.) for the construction of the Arts & Cultural Center Project Phase II. Section 2. The Guaranteed Maximum Price for Phase II as outlined in the attached document, for construction of Phase II of the Arts & Cultural Center Project has been established at $6,800,000. Section 3. The City Manager is hereby authorized to do all things necessary to carry out the aims of this Resolution. Section 4. This Resolution shall become effective immediately upon its adoption. The foregoing Resolution was offered by Vice Mayor Joet, who moved its adoption. The motion was seconded by Commissioner Holzberg, and upon being put to a vote, the vote was as follows: Commissioner Zev Auerbach yes Commissioner Bob Diamond absent Commissioner Teri Holzberg yes Commissioner Michael Stern yes Commissioner Luz Urbaez Weinberg yes Vice Mayor Billy Joel yes Mayor Susan Gottlieb yes Resolution No. 2009- IQ Page 3 PASSED AND ADOPTED this 3~d day of March, 2009. SAN GOTTL ,MAY R APPROVED AS TO LEGAL SUFFICIENCY: CITY ATTORNEY SUFFOLK A VENTURA ARTS & CULTURAL CENTER PRELIMINARY GMP-SUMMARY LEVEL A VENTURA, FLORIDA PHASE 2 BUILDING February 25, 2009 First Floor Mezzanine Gross Building Area 14,185 879 15,064 L~~=:~~'" ': ,:~::~~: ~:,~,~;~;~:~S:~~~'i.~::~;~:~~~C~L~~~~T:::~i~~0~~ ~~: ~::;~:~:iJ~fir.~~f ~~_::JJ412ri:,'~:'~: 02060 - Buildino Demolition In Phase 1 02200 - Site Work & Utilities $225.355 $14.96 02780 - Unit Pavers $28.805 $1.91 02800 - Planters (NIC) 02900 - Landscaoina & IrriQation $32 637 $2.17 03300 - Concrete Work $880.345 $58.44 04200 - Masonrv Work In Concrete 05100 - Structural Steel $385 980 $25.62 05500 - Metal Fabrications $150 902 $10.02 06100 - Rouoh Caroentrv $4.966 $0.33 06200 - Finish Carcentrv $144 355 $9.58 07100 - Wateroroofina & Joint Sealants $25 929 $1.72 07525 - Rooflna & Flashings $165025 $10.95 '. 08100 - Doors. Frames & Hardware $75,665 $5.02 08330 - Coilina Doors and Grilles $1,592 $0.11 08410 - Aluminum Entrances, Storefronts. Windows & Glazina $346.031 $22.97 09220 :' Stucco $164,554 $10.92 09250 - GVDsum Drvwall $273,500 $18.16 09310 - Ceramic tile $50.781 $3.37 09400 - Terrazzo $99.213 $6.59 09511 - Acoustical Panel Ceilinos & Grid $43.810 $2.91 09646 - Wood 1I00rino $26.025 $1.73 09650 - Carnet and Resilient FlooTina $17,429 $1.16 09900 - Paintina $n.271 $5.13 10000 - Soecialties $30,069 $2.00 10200 - Louvers $8,320 $0.55 11000 - Residential EauiDment $2.534 $0.17 11062 - Stace Riaoina and DraDerles $274.447 $18.22 11065 - Theater Liohtino $250 366 $16;62 11066 - Sound Svstem $213,245 $14.16 12000 - Fumishinas $6 000 $0.40 12485 - Foot Grilles $2 000 $0.13 AACC Draft GMP For Contract 2-25-09.xls Page 1 of 2 , SUFFOLK A VENTURA ARTS & CULTURAL CENTER PRELIMINARY GMP-SUMMARY LEVEL AVENTURA, FLORIDA PHASE 2 BUILDING February 26. 2009 First Floor Mezzanine Gross Building Area 14.185 879 15.064 12610 - Fixed Audience Seatin $112 216 $7.45 13000 - S eeial Construction Decorative Aluminum and Fabric Can 14420 - V\lheeJchair Lift $20 000 $1.33 15300 - Fire Protection $107800 $7.16 15400 - Plumbin $173,157 $11.49 15500 - HVAC $642 718 $42.67 16000 - Electrical $619,862 $41.15 ISUBTOTAL DIRECT COSTS $6,682,9031 $377.251 General Conditions 427 478 $28.38 Labor Burden 165,495 $10.99 Insurances 75 000 $4.98 Performance & Payment Bond 50 630 $3.36 Builder's Risk & Insurance & Deductibles Bv Owner Buildlna Permit Bv OWner T emoorarv Remote Parkina 90 000 $5.97 Contlnaenev (2.5%) 142 073 $9.43 Sales Tax SaVings (56,8291 ($3.77) CONSTRUCTION COSTS WITHOUT CM FEE $6,576,750 $436.59 $223,2511 $6,800.0001 $14.821 $451.411 )constructlon Manager Fee ~TOTAL CONSTRUCTION COSTS AACC Draft GMP For Contract 2-25-09.xls Page 2 of 2 ~~.,,~ GUARANTEED MAXIMUM PRICE AMENDMENT #1 TIDS GMP AMENDMENT, made and entered into as of this 26th day of March 2009 ("GMP Amendmenf') amends that certain Agreement between Owner (The City of Aventura, Florida) and Construction Manager (Suffolk Construction Company. Inc.), made as of the 7th day of AUlWst 2008, for the following described project: A ventura Arts & Cultural Center Phase ll- Building GMP WHEREAS, the Owner and the Construction Manager have agreed to amend the Agreement in the maner set forth herein. NOW, THEREFORE, in consideration ofthe mutual promises and covenants contained herein, in the Agreement and the other Contract Documents and for such other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, the Owner and the Construction Manager do hereby agree as follows: 1. This GMP Amendment is executed in connection with and is deemed to be a part of the Agreement and the Contract Documents. Wherever the terms of this GMP Amendment and the terms of the Contract Documents are in conflict, the terms of this GMP Amendment shall govern and control. The terms used herein, unless otherwise defined in this GMP Amendment, shall have the meanings ascribed to them in the Contract Documents. 2. The following are hereby incorporated into the Contract Documents and made part thereof: a. Exhibit A- List of Drawings b. Exhibit B- List of Specifications c. Exhibit C- Contractor's Qualifications and Assumptions d. Exhibit D- Contractor's Assignment of Cost Categories e. Exhibit E- Summary Level GMP Phase 2 Building 3. The entire scope of the work for this project is hereby incorporated into the work. 4. The Date of Commencement for the construction of this project shall be in accordance with Article 8.1.2 of the AlA A20 1- General Conditions of the contract for construction. 5. The Construction Manager shall achieve Substantial Completion of the entire work for this project not later than 392 days from the Date of Commencement (the "Contract Time"). And the final completion not later than 45 days from the date of Substantial Completion. 6. The Guaranteed Maximum Price Amendment # 1 is hereby guaranteed by the Construction Manager not to exceed the sum of Six Million Ei~t Hundred Thousand 00/100 Dollars ($6.800.000.00) (the "Project GMP"), based upon the entire scope of the work for Phase 2 as described in the Contract Documents, including, but not limited to, the Drawings and the Specifications, subject only to additions and deductions by Change Order or Construction Change Directive, as provided in the Contract Documents. The GMP is more particularly itemized in the Summary Level GMP prepared in accordance with the terms of the Agreement. Included in the Summary Level GMP and specifically identified herein, the contingency included in this guaranteed maximum price is the amount of $142.073 .00 7. Except as expressly provided herein above, all of the terms. conditions. covenants, agreements and understandings contained in the Contract dated August 7, 2008, shall remain unchanged and in full force and effect, and the same are hereby expressly ratified and confinned by the Owner and the Construction Manager. Page 1 of2 / Signed sealed and delivered in the presence of: City of Aventura, Florida Print: Title: STATE OF FLORIDA ) COUNlY OF ) The foregoing GMP Amendment #1 in connection with the project known as Aventura Arts & Cultural Center was acknowledged before me this day of March. 2002 by , as . on behalf of the City of A ventura. Florid!!, who took an oath/did not take an oath, and who is personally known to me/produced the following as Notary Public, State of Rorida My Commission Expires: Suffolk Construction Company, Ioe. 67 .A.y/~ ;Z" ;3. .,e;"" pr~ erS/4p~ f ~/Y- s,Jf7H~ tZ~,) Title: STATEOF~A ) COUNTY OF \k (!::~uuv'" ) The foregoing G Amendment # 1 In connection With the prOject known as Aventura Arts & Cultural Center f"b,...,......~ e j( was acknowledged before me this ~ day oflMreh. 2002 by \ "'~. frr.J), as \?rl"~ \~ 'C'..k ..r- GJ.1 . ofSutrolk Construction Companv. me.. who took an oath/did not take an oath, and who is personally known to me/produced the following as identification: Cl~_ Notary Publ c, State rida My Commission Expires: ::5JdJ?/1t .-- r.......&iiERiNE-LiWtY--, = Commt 0I)0II47t271 I Elq)Ires 1IZ7flO11 ! FloIIda Not8Iy""" hl i l.................,....,...................... Page 2 of2 I DRAWING # EXHIBrf "A" SUFFOLK Aventura ArtII & Cultural Center Aventura, FL GMP Document List DRAWING TITLE Received Data: 121212008 Original Set PREPARED BY DRAWING DATE PGAL Demolition 01.00 Demo/ltion SIle Plan CurtiB, Rogers Design Studio Inc LandscaDe Drawln,,", T01.0 Landscape Tree Disposition Plan l1.0 Planting Plan 1R2.0 Irrigation Plan IR2.0 Irrigation Plan (look same bullarger and different dales) IR2.1 Irrigation Notes and DetaUs Civil Drawings 10F1 PD1 PD2 P03 PD4 W1 Wi W3 Sn1 Sn2 , Foltin,Leavy, Skiles, PA Boundary and Topographic Surve.y. Pavlno.nd Draln.li. ~ Paving and OrIIlllilge Pl8ns Paving and DraInage Plans Paving and Drainage Plans Watef Service Connection Plan Water Service Connection Plan Water Service Connection Plan S~rysfiWaiExtWlon:~lan' . Sl!ri11ltry .sewer I!XIenslonPlan' Arcbltectural Dl1IWlnlls PGAL GO.oo G-0.01 G-O.02 LS2.00 LS2.01 A-O.10 A-O.11 A-O.12 AO.30 AO.31 AO.40 AO.41 AO.42 .AD.43 AMo A1.01 A1.02 A1.02A A1.03 A1.04 A1.05 A2.0o-0 A2.00 AD2.oo A2.01 A2.02 A3.00-0 A3.00 A03.00 A3.01 M.OO A4.01 M.02 M.03 M.04 M.50 A-4.51 M.52 AS.OO Cover Sheat List of Drawings An:hitecIuTllI Revlalons & Notes 1 st Floor ur. Safety Plan MezzanIne Life-Safety Plan Wall Types MasoJl/Y Wall Types: Concrate Wall. Metal Stud, Masonry Wall Types: Metal Stud, Masonry Door Schedule Exterior and Interior Door DetaR CurtalnwaJI Elevations storefront. WIndOW & Louver Schedule Curtalnwal1 Details Window & Storefront Details Site Plan Site Plan Site Plan Details Site P1en Details Site Plan De1a1s SIte Plan DetaRs Sile Details StaIr and Ramp MecIwonlcal Plenum Plan Overall 1 at Floor Plan Shell Dimension 1st Floor Plan Mechanlcal Meuanlne Plan Roof Plan Mach Plenum Rellect8d Ceiling Plall RelIecled Cening Plan RellacIed Ceiling Plan - Dimension MeclIenlcal Mezzanine Reftected Ceiling Plan Enlarged Floor Plans Enlarged Floor Plans Enlarged Floor Plans Enlarged Plans Restrooms, Lobby EnlargScl Plana Restrooms. Sack Stage Ro.orll$ Enlarged ~ellectad Ceiling Plan and DetaRs CeRing Enlarged Plana .1Id Delells CeHin!il.Detafts Seating Plan & Sight UneS 1of4 11126/2008 10/17/2008 11/2612008 11/1712008 1112612Q08 1112612008 2126/2008 101912008 101912008 101912008 101912008 101912008 101912008 101912008 101912008 101912008 1112612008 1112612008 11/1712Q0,6 1112612008 1112612008 11/26/200~ 11/2612008" 11/26/Z008 1112~0I)8 1112612008 .. 1112612008 ' 1112612008 1112612008 1112&mlO8 1112612008 11/2612008 1112612008 11/2612008 1112612008 1112612008 1112612008 11126/2008 1112612008 1112612008 1112612008 1112612008 1112612008 1112612008 11126/2008 11/26/2008 1112612008 11126/2008 1112612008 1112812008 11/2ElI2oo8 1112612008 1112812008 11/2612008 1112612008 1127/2009 Revision #1 DRAWING DATE 2/1212009 Revision #2 DRAWING DATE I DRAWING .. AS.01 AS.02 M.oa ,0,5.04 AS.OS AS.06 AS.07 AS.08 AS.OB AS.10 AS.11 AS.OO AS.01 AS.02 AS.03 AS.04 AS.05 A&.O& AS.07 A7.00 A7.01 ,0,7.02 ,0,7.03 A7.04 ,0,7.50 A7.51 ,0,7.52 A7.53 A7.54 ,0,7.55 A7.70 A7.71 A7.72 A7.73 A7.74 ,0,7.75 A9.00 AB.01 10-1 10-2 . lD-3 10-4 lP-4M 10-5 IO-$AA 10-8 10-7 ~ 10-8 10-9 10-10 10-12 ~ 10-13 EXHIBIT "A" SUFFOLK Aventura Arts & Cultu1'al Cellter Aventura, FL GMP Document List DRAWING TITLE Plans Details Stairs & Ramps at Lobby Plans Details StaIrs & Ramps at Lobby Plans Datails Stairs Plans Details Stairs Ladder Sectlons & Detans lnterlor Theatre Stairs Interior Theatre Stairs Im-rlor Railing Details Interior Railing Details Rail Delalls Wall & Column DetaHs Bulldlog E1evalions Building Elevations Exterior Enlarged West Lower canopy Elevation & Column DetaR Preliminary Enlarged Entry Elevation & Entry Columns DetaIl Exterior Enlarged East Canopy Elevation & Details Exterior Enlarged East Canopy. Elevation & Details Extarior Enlarged West upper. canopy Elevation & Column Detail Exterior Enlarged West Upper Canopy SeelIons BuRding Sectlons Building SectIons Building SectIons auldlng Sections Bulding SecIlons WaD Sections Wall Sections Partial & Wall Sections Wall Sections Wall Sections Mise DetaUs Roof Detals Roof Details Typical Footing DetaRs Mise Details. Details Expansion Joint DetaUs Penetration Details Penetration OetaUs Finish Schedules Floor Finish Plan Wall Paint Finish Plan Enlarged Plan & Inl Elevations LObby ReslroDms IiiRI.FlIall PlaR 11M. "a' ..lialls t..slll;or Rnvs.ma JlJleFl'lall", Toilet Fixtures, Accessories, Mounting Di8glllm, Sink Details SiRk ~etalIa 'JIeR'lative Enlarged Plan & Int Elevations Back 0'1 House Restrooms Lobby and Vestbule Inlarior Elevations Nla",IIll'Je "'It FaalwfB Auditorium Interior Elevations Millwork Elevations MilIwDrkOetaIs Acousticlll Panel Detail. fAl8WAl;a! PIIl'I.1 Clatah Interior Wan DetaRs Archftectural Acoustlc$ DrawinGS Tl1.00 Thaatre lighting One Un. Diagram TL2.o0 Theatre Lightlng Device Oeta"$ Tl3.00 Theatre Llghtlng Light Plot TR1.00 Theatar Rigging and Draperies Plan TR2.oo Theater Rigging and Draperies Section TR3.00 Theater Rigging Typical Elevation TR4.00 Theater Rigging E1ectrlcs ETevatlon TR5.00 Theater Rigging Up$tage elevation TR4.01 Theater Rigging Fire Safety Curtain Rigging Received Date: PREPARED BY Edward Dugger & Assoclates, PA 20'14 12t21200a Original Set DRAWING DATE 1112612008 11/26/2008 11/26120011 11/26/2008 11/26/2008 11/26120oa 1112612008 1112612008 11126/2008 111261200. 1112612008 1112612008 11126l2oo8 111261200a 1112612008 1112612008 . 1112612008 1112&12008 11/26/:100ll 11~ 11/261:lop8 11126ii008 111261ioP8 11/26WOO 11126l2OO8 1112&12008 1112612008 11/2612008 1112512008. 1112&l2doll 11!2$dooe 11/2641011 11~$ 1112612~ 11~008 11128120011 11/2612008 11~1.?0()8 11/2f>120D8 11/2$/2008 11126/2008 11/26120oa 11 '28r:lQOI 11/28/2008 1112S12g98 1112612008 11/2612008 11131/:l0111 11126/2008 11 f2612oo8 11 f2612008 11 f28/2008 11I3i./:lOQI 11f26/2008 11/17f2oo8 11/1712008 11/17/2008 11/17/2008 1111712008 11/17/2008 11/17/2008 11/17/2008 11/1712008 1/2T/200' Revision #1 DRAWING DA.TE . 2/1212009 Revision #2 DRAWING DATE I DRAWING # EA1.0 EA2.0 EA3.0 EM.O EAS.O AV1.0 AV1.l AV1.2 AV1.3 AV1A AV1.5 DRAWING TITlE 1 It Floor A V Oevice Locallons 2nd Floor AV Device locations A V Device LOClItions Reflected CeUin; Plan BuDding Section. AV Device Locations AC Sequencer / Conduit Riser AC Grounding Audio 1-line Funellonal Diagram Video 1-Llne Functional DIagram Intercom 1-Line Func:llonal Diagram CU$lom Connector Panels 1 (Half Size) Cusk>m Connec1or Panels 2 (Half Size) Structural Drawinas 8-2.00 Foundation and Ground Floor Plan S-2.DOA Seating Framing Plan 8-.00B Columns Layout 52.01 Mechanical MeUllnlne Framing Plan 52.02 Roof & High Roof Framing Plan 53.00 General Notes, Schedules and DetaOs 83.01 Typical DetslIs 83.02 Wind Load & Typical Details 53.03 Typical OetaUs and Beam SchedUle 5-4.00 Sections 5-4.01 Sections 5~.02 Sactlons S~.03 Sections 5-4.04 Sections Fire Protection FPO.Ol L.egllnd. Delan. end Fire ProteCtion Notes FP1.01 Fnt Floor Fire Protection Plan . FP1.02 Second Floor Fire protection Plan FP2.01 Fire Protecllon OetaUs FP2.02 Fire Protection Deta" ~ PO.Ol PO.02 P1.01 Pl.02 Pl.03 Pl.04 P3.01 P3.02 Schedules and Legend DelaBs Plumbing Floor Plen . First Floor - Under Ground Piping Plumbing Floor Plan. First Floor - Above Ground Piping Plumbing Floor Plan - 2nd Floor and Roof Plan Plumbing Roof Plan Waste Piping Risers Domestic Water Risers Meehanieel DrawinG' MO.Ol MO.02 MO.03 Ml.0l M1.02 M1.03 M2.01 M2.02 M2.03 M3.01 M3.02 M3.03 M3.04 M3.05 M4.01 M4.02 M4.03 Legend. Plan Mark and General Notes Mechanical Schedule. Mechanielll Sehedules Firat Floor HV AC Plan SeCond Floor HVAC Plan HVAC Building Section large Seale MechanicBl Room Plan and Section Large Scale Mechanical Room Plan and SectIon Chiller Yard and Piping Schematic Meehanical Delalls Mechanical Details Mechanical DetaIls Mechanical Detalls Mechanical Delan. Meehanical Controls, Legend and General Notes Meehanlcal Controls Mechanica' Controls ~IBIT"A. SUFFOLK Aventura Arts & CUltural Center Aventura. FL GMP Doeument List Received Date: PREPARED BY DDA Engineers PA John$On,Levms~ Ragan, Davila, Ine. Johnson, Levinson, Ragan, Davila. Inc:. Johnson, Levinson, Ragan, Davila, Inc. 3of4 1 ZJ2f2008 Original Set DRAWING DATE 11/17/2008 11f17/200! 11/17/2008 11/17/2008 11/17/2008 11/17/2008 11/17/2008 11/17/20011 11/17/2008 11/17/2008 11/17/2008 1112612008 11/2612008 11/2612008 1112612008 11/26/2008 11/2612008 11/26/2008 11/2612008 1112612008 11126i2oo8 11f2612008 11/26120011 11/2~8 11/2612008 11/26/2008 11/261200$ 11/26.12001$ 11/26/zP08 11 /26l2oo8 l1f2612008 11f26/2oo8 11/26/2008 11/26f2008 11 f21/200! 11/26f2008 11/2612008 11126f2OO8 1112612008 11f2612008 11/26/2008 11/2612008 11/26120011 11126f20D8 11/21!lf2008 11/26/2008 11/28/2008 11/26/2008 11/26/2008 11/2612008 llf2612008 11f26/2008 1,1/2612008 11/2612008 1112612008 1127 mOl Revision #1 DRAWING DATE 1112612008 11/2612008 11/26f2008 11/2612008 1112612008 11f261200B 11/2812008 11/26/2008 11/2612008 11/26/2008 1112612008 11/26/2008 11/26/2008 11/2612008 11/26/2008 1112612008 11/2612008 2/121200& Revision #2 DRAWING DATE 11126/2008 / DRAWING' M4.04 M4.05 M4.06 DRAWING TITLE Mechanlt:lll Controls Mechanlcal Controls Mechanical Controls Electrlca' Drawlncn EO.OO EIectricIII Slle Plan E1.01 First F\oOr Lighting Plan E1.02 First Floor Theatrical Lighting Plan E1.03 First Floor Power Plan E1.04 First F\oOr Systems Plan E1.05 SeQond Roof Llghtilg Plan E 1.08 Second Floor Theatrical Lighting Plan E1.07 Second Floor Power Plan E1.08 Second Floor Systems Plan E2.01 Electrical Rooms and Riser Diagram E2.02 Riser Diagnlms and DetalIs E2.03 Miscellaneous Details E2.04 MlscelIaneou& De1aiIs E3.01 Fb,tu~ Schedule, Le(llllld and Notes E3.02 MisoeI1aneous Schedules E3.03 PanelboaRl Schedules E4.01 Misc:ellaneoll$ Detats END OF SECTION EXHIBlT"A" SUFFOLK Aventura Arts & Cultural Center Awntura, FL GMP Document LIst Received Data: PREPARED BY Johnson, levinson, Ragan. Davila, Inc. 4of4 12/2J2001 Original Set DRAWING DATE 1112612008 11f2612oo8 11J2612oo8 1112612008 11/2612008 1112612008 11/26/2008 11126/2008 11/26/2008 1112612008 1112612008 11/26/2008 11/2612008 11126/2008 1112612008 11/2612008 11f2612008 11J2612008 11/2612008 11/2612008 1/%7/2009 Revision #1 DRAWING DATE 11126/2008 11128/2008 11/2612008 2112/2009 Revision #2 DRAWING DATE I DOCUMENT Letter DIVISION 0 00000 00000 00000 00000 00000 00000 00001 00002 00842 DIVlSION 1 01010 0'1015 01045 01091 01152 01153 01200 01201 01210 01230 01310 01340 01350 01352 01370 01500 01700 01710 01720 01730 01800 DIVISION 2 0280 02810 02910 02931 02935 02950 DIVISION 3 03100 Specifications EXHIBIT "8" SUFFOLK Aventura Arts & Cultural Center Aventura, FL Specifications List Received: 12/212008 TITLE Phase II GMP Letter of Agreement to C.OA Dated 2/27/09 BIDDING AND CONTRACT DOCUMENTS Professional Signatures - Architecture Professional Signatures - Civil Professional Signatures - Electrical & Technology Professional Signatures - Mechanical Professional Signatures - Plumbing & Fire Protection Professional Signatures - Structural Project Manual Information Project Directory Safety Requirements GENERAL REQUIREMENTS Summary of the Work Contractor's Use of the Premises Cutting and Patching Definitions and Standards Application for Payment Changes in the Work Project Meetings Pre-Construction Conference Allowances Alternates Construction Schedules Submittals and Substitutions CAD File Transfer Policy LEED Requirements Schedule of Values Temporary Facilities ad Controls Contract Closeout Cleaning Project Record Documents Operation. and Maintenance Data General Commissioning Requirements SITEWORK Soil Treatment Irrigation System Tree Relocation Tree and Plant Protection Sodding Trees, Plants and Groundcovers CONCRETE Concrete Formwork PAGE j DOCUMENT 03155 03200 03300 03360 03520 DIVISION 4 04100 04340 DIVISION 5 05120 05200 05310 05400 05500 05511 05518 05521 DIVISION 6 06067 06100 06200 06402 06415 06420 DIVISION 7 07141 07161 07170 07210 07241 07543 07620 On20 07841 07842 07920 DIVISION 8 08110 08211 08311 08710 Specifications EXHIBIT "S" SUFFOLK Aventura Arts & Cultural Center Aventura. FL Specifications List TITLE Polyurea Floor Joint Filler Concrete Reinforcement Cast-In-Place Concrete Special Concrete Floor Finishes Lightweight Concrete Roof Insulation MASONRY Mortar Reinforced Unit Masonry System METALS Structural Steel Architectural Ornamental Handrails and Railings Steel Deck Cold-Formed Metal Framing Metal Fabrications Metal Stairs Aluminum Plate Column Covers Pipe and Tube Railings WOOD AND PLASTICS Plastic and Metal Surfacing Material .Rough Carpentry Finish Carpentry Interior Architectural Woodwork Stone Countertops Paneling THERMAL MOISTURE PROTECTION Cold Fluid-Applied Waterproofing Modified Cement Waterproofing Bentonite Waterproofing Building Insulation Polymer-Based Exterior Insulation and Finish System (EIFS) Thermoplastic POlyolefin (TPO) Roofing Sheet Metal Flashing and Trim Roof Accessories Through-Penetration Firestop Systems Fire-Resistive Joint Systems Joint Sealants DOORS AND WINDOWS Steel Doors and Frames Flush Wood Doors Access Doors and Frames Finish Hardware Received: 12/2/2008 PAGE 2/ DOCUMENT 08800 08830 08910 DIVISION 9 09111 09220 09250 09310 09400 09511 09580 09646 09653 09681 09841 09910 09911 09912 09972 DIVISION 10 10265 10431 10520 10810 DIVISION 11 Not Used DIVISION 12 12485 12610 DIVISION 13 Not Used Specifications EXHIBIT "B" SUFFOLK Aventura Arts & Cultural Center Aventura, FL Specifications List Recewed: 12r.u2008 TITLE Glazing Mirrors Curtain Wall FINISHES Non-Load Bearing Steel Framing Portland Cement Plaster Gypsum Board Ceramic Tile Epoxy Terrazzo Flooring Acoustical Panel Ceilings\ Suspended Decoratwe Grids Wood Athletic Flooring Resilient Wall Base and Accessories Carpet Tile Acoustical Wall Panels Painting Exterior Textured Coating Interior Painting Concrete Sealer SPECIALTIES Impact Resistant Wall Protection Signage Awnings Toilet Accessories EQUIPMENT FURNISHINGS Foot Grilles Fixed Audience Seating SPECIAL CONSTRUCTION PAGE 3/ DOCUMENT DIVISION 14 14420 DIVISION 15 15000 15060 15085 15100 15121 15130 15141 15170 15200 15252 15290 15300 15411 15412 15413 15430 15440 15450 15510 15515 15535 15540 15545 15671 15682 15855 15858 15880 15882 15890 15900 15910 15930 15936 15991 15992 Specifications EXHIBIT "B" SUFFOLK Aventura Arts & Cultural Center Aventura, FL Specifications List TITLE Received: 12/212008 CONVEYING SYSTEMS Wheel Chair Lift MECHANICAL SYSTEMS General Provisions Pipe and Pipe Fittings Identification Valves Expansion Compensation Thermometer and Gauges Hangers and Supports Motors Vibration Isolation Pipe and Equipment Insulation Duct Insulation Sprinkl~r System Potable Water Systems Soil, Waste and Vent System Storm Water Systems Plumbing Specialties Plumbing Fixtures Plumbing Equipment Hydronic Piping Hydronic Specialties Refrigeration Piping and Specialties HVAC Pumps Chemical Water Treatment Ductless DX Spilt Systems Air Cooled Water Chillers Air Handling Units Fans Fire, Smoke and Combination Fire/Smoke Dampers Air Filters Ductwork Controls and Instrumentation Ductwork Accessories Terminal Boxes Grilles, Registers, Diffusers, Louvers Testing, Adjusting and Balancing (TAB) of Heating, Ventilating and Air Conditioning (HV AC) Systems Tests - Piping Systems }:J,~: ',~:'! -:""~ ......,. / PAGE 4 DOCUMENT DIVISION 16 16010 16020 16025 16050 16111 16123 16130 16141 16160 .16180 16190 16195 16440 16461 16470 16476 16477 16480 16485 16495 16510 16535 16610 16650 16670 16721 16725 16726 16740 16770 16780 16902 16950 END OF SECTION SpecifICations EXHIBIT "8" SUFFOLK Aventura Arts & Cultural Center Aventura, FL Specifications List TITLE ELECTRICAL Basic Electrical Requirements Work Included Codes, Fees and Standards Conduit Building Wire and Cable Boxes Wiring Devices Cabinets and Enclosures Equipment Wiring Systems Supporting Devices Electrical Identification Disconnect Switches Grounding Dry Type Transformers Panelboards Enclosed Circuit Breakers Fuses (600 Volt and Below) Motor Controls Contactors Adjustable Frequency (Variable Speed) Drive Units Interior luminaires Emergency Lighting Equipment Transient Voltage Surge Suppression Energy Management and Control System Lightning Protection Systems Fire Alarm and Smoke Detection Systems Security Raceway System Theatrical Sound System Raceway System Telecommunications Distribution Raceway System Cable TV Raceway System Building Management Raceway System Electric Controls and Relays Testing Received: 121212008 ,. ';"-", '; > -: '.--: , '.........." ~. ,"'.;'- I'"~ . L EXHIBIT "e" SUFFOLK A VENTURA ARTS & CULTURAL CENTER A VENTURA, FLORIDA FEBRUARY 26, 2009 GMP QUALIFICATIONS & ASSUMPTIONS GENERAL 1. The preliminary Construction Schedule included in the GMP Manual provides for Substantial Completion of the work within 392 Calendar Days from the date of Notice to Proceed llIld assumestb.e issuance of the full building permit and all other required pennits will allow. forconstructiol1 ,to progress in the sequence and manner shown in the preliminary construction schedule; 'This schedule is. . firm. with respect to the project dmation; however. the exact sequence and duration o~ work activiti~~ will require further refinement and input from Subcontractors. Contract schedule assumes normal. working hours as allowed by the City of Aventura (Monday through Saturday. excblding Government holidays). SCC! assumes uninterrupted access to the project site during workingh01l1"S~. . . 2. If issuance of the building permit delays the construction of the project, the schedule :will be up~d .. upon issuance of the full building pennit Based on the impact to the critical path, a time exte~ion~. . shall be issued. Included in the time extension. will be a change order fox: Contractor General. Condition's costs for the duration of the documented delay. The basis for cost sh81Lbe'actual monthly... costs for general conditions for the month prior to delay occurring. The change ordel'shall also ineJude': substantiated supplier and subcontractor delay costs (ie. crane rental, subcontractor supervision, etcY , 3. The Site Management Plan discussed and agreed to at the January 14,2009 Phase I Pre-ConstruCtion Conference contains certain assumptions about the Contractors use of the site that are included in this agreement. . 4. Any owner supplied materials and/or equipment must be provided by the Owner to the Contractor in accordance with construction schedule. The Contractor will also notify the Owner in advance and provide sufficient time for the timely procurement of equipment and materials. s. No waterproofing, glazing, code or acoustical consultants' costs or resulting work is included. 6. OffSite parking, and all associated costs, are included as an Allowance, not to exceed $90,000. 1. We have included an allowance for anticipated sales tax savings to be adjusted when actual savings are achieved. , 8. Suffolk: reserves the right to provide alternative but equivalent materials and manufacttn'ers subject to Owner's, Architects and Engineers approv~ which shall not be unreasonably withheld. 9. We have not included materials testing & inspection services, or any costs related to the private provider program. S:\Aventura A&OOOWNER CONTRACI\AACC . EXHIBIT C - QA 2-26-09.DOC Printed 2/2712009 at 10:31 AM 10f5 / 10_ Suffolk Perfonnance & Payment Bond costs are included. In the event that a Corporate Guarantee, acceptable to both parties, can be provided, the cost of the Performance & Payment shall be credited to the Owner. 11. Builder's Risk Insurance premiums and, Builder's Risk deductibles are not included. Contractor and its. subcontractors and suppliers are to be named additional insured on the aforementioned policies. Coverage is required for the costs of delay including any General Conditions costs. In the event of a hurricane caused delay, in excess of five (5) calendar days, Contractor's documented General Conditions will be reimbursed by the Owner in a timely manner, irrespective of any recovery from a builders risk claim. 12. We have not included impact/utility fees or back charges, sewer or water connection fees, furnishing of site water meters or water meter fees that may be required by local, state, or federal authorities having jurisdiction. 13. We have not included any provisions for on-site security personnel. 14. The GMP excludes costs for all electrical energy consumption fees once the building is on permanent power. Owner shall enter into FPL Customer Service Agreements for any permanent meter(s) once the building is switched from temporary to permanent electrical service. The GMP excludes the cost of any FPL fees, cbarges, easements, etc. associated with tbe furnish and installation of new a transformer needed to supply permanent power to the site. 15. We have not included any allowances for soil remediation, removal of hazardous, contaminated or unsuitable material. 16. We have not included the cost of threshold or special inspector services, including but not limited to building settlement measurements, structural steel. curtain wall, waterproofing, or roofmg inspections. 17. When determining what portion of the work is to be covered as part of an Allowance as outlined in the contract, the allowance value shall be used for all work including but not limited to: labor, material (including waste .faetor where applicable); equipment, freight, tax, handling. hoisting, submittals and shop drawings, layout, permits, subcontractor markup for handling, subcontractor overhead and fee, and subcontractor insurance and bond unless otherwise noted. Allowances also include all associated or ancillary work necessary to install and make the allowance item fully operational and complete for its intended purpose including but not limited to: design. engineering, structures,fmishes, MEP,FP systems, etc. unless specifically noted otherwise. 18. We have not included any costs associated with removal, protection or replacement of FPL, AT&T (and its subsidiaries) or CATV underground lines ifrequired. 19. We have not included any costs related to special acoustical or vibration control measures above what is shown on drawings. 20. The costs of printing, postage and shipping fees for design changes, RFIs, ASIs and Revisions will be included as part of the change oreler proposal. 21. We have not included any allowances for "Art in Public Places." DMSION I-GENERAL CONDITIONS 01010 - SUMMARY OF THE WORK 1. Suffolk Construction will assist the Architect/Engineer in obtaining a USGBC LEED "Certified" building under the NC v. 2.2 standards. Suffolk Construction makes no guarantees the building. as / S:\Aventura A&CC\OWNER CON'IRACI'\AACC - EXHIBIT C . QA 2-26-09.DOC Printed 2/2712009 at 10:31 AM 20fS designed and constructed, will achieve such a designation. but will venture to assist the team in providing the necessary documentation in order to do so. 01152 - APPLICATION FOR PAYMENT 1. We have excluded all documentation required of an "Unbonded Construction Project", ifa Payment & Performance Bond is required and secured. 01230 - ALTERNATES 1. This section is excluded from the GMP. 01350 - CAD FILE TRANSFER POLICY 1. We have not included the cost of CAD file transfer service fees. 01352 - LEED REQUIREMENTS 1. Suffolk Construction will assist the ArchitectlEngineer in obtaining a USGBC LEBD "Certified" building under the NC v. 2.2 standards. Suffolk Construction makes DO guarantees the building. as designed and constructed, will achieve such a designation, but will venture to assist the team in providing the necessary documentation in order to do so. 2. Suffolk Construction will assist the ArchitectlEngineer in implementing and developing a LEBD project "scorecard" that once mutually agreed upon, will identify those credits that each team member/discipline will be responsible for managing and supplying the necessary documentation- Currently. certain credits assigned to the Contractor in this section mayor my not be attainable based on the current design(Le. Regional Material Credits 5.1 & 5.2). 3. We have excluded the costs of all LEED project administration. 4. We have excluded CODlIIlissioning Consultant costs. DMSION 2-SITEWORK 1. We have excluded the costs of repair and/or replacement of the existing concrete unit pavers at the 18Stb Street cul-de-sac. DEWATERING 1. We have assumed that the method of disposal of water as outlined in permit is adequate to dewater foundation excavations. Any required additional measures would be a change to the GMP. 2. We have not included any dewatering permitting, consultant fees, periodic testing at this time. SITEWORK & UTILITIES 1. No unsuitable soils replacement for utilities has been included. DIVISION 8-DOORS & WINDOWS 1. We have included 8'0" high storefront doors at opening Mark 10 I-A, 10 loB, 10 l-C in lieu of specified 9'0" height. DIVISION 10-SPEClALTIES S:\Aventura A&CC\OWNER CONTRACT\AACC - EXHIBIT C - QA 2-26-09.DOC Printed 2/2712009 at 10:31 AM JofS / l0520-A WNINGS 1. Both fabric and metal awnings currently shown on the drawings have been excluded from the GMP as an accepted Value Engineering option. 10431-IDENTIFYING DEVICES (SIGNAGE) 1. An allowance for exterior building mounted signage of $4,350 is included. 2. An allowance for interior room identification signage of$2,5oo is included. DIVISION ll-EOUIPMENT l1062-STAGE RIGGING AND DRAPERIES 1. We have included the Stage Rigging with the following accepted Value Engineering reductions in scope: a. We have provided manual counterweight linesets in lieu of motorized linesets. b. We have converted the frre curtain to manual operation. 2. We have included a $59,000 allowance for Stage Rigging and Drapery changes accepted by Theater Consultant (Ed Dugger). Reference GMP Q&A Attachment #1. Il06S-THEATER LIGHTING 1. We have included a $17,300 allowance for Theater Lighting changes accepted by Theater c;onsultant (Ed Dugger). ReferenceGMPQ&A Attaclunent#1. 11066-S0UND SYSTEM 1. We have included a $31,171 allowance for Sound System changes accepted by Theater Consultant (EO. Dugger). Reference GMP Q&A Attaclunent #1. DIVISION 12-FURNISHINGS 1. We have included an allowance of $3.000 for a presenter's podium and $3,000 for music stands and lights. 12484 - FOOT GRILLE ENTRANCE SYSTEM 1. We have included an allowance of$2,OOO at the building entrance(s) pending clarification. 12610 - FIXED AUDIENCE SEATING 1. We have included Series Seating Model Celebration II WB- WS 34" Fabric included is Maharam Crush. Per the supplier, the wood is NOT FSC Certified. The pricing is based upon CA 117 NOT 133. DMSION 14-CONVEYING 14420 - WHEEL CHAm. LIFT 1. We have included an allowance of$20,000 for one wheelchair lift pending confnmation of pricing. DMSION lS-M.ECHANICAL 15400 - PLUMBING S:\Avcntura A&:CCIOWNER CONTRACMACC - EXHIBIT C. QA 2-26.Q9.DOC Printed 2/2712009 at 10:31 AM 4 ofS I 1. We have excluded the supply & installation of the 1000 gallon underground LP Gas tank. DIVISION 16-ELECTRICAL ELECTRICAL 1. We have included 130 lineal feet of secondary conduits and wiring pending finalizing of the FPL Transformer location. **~ END Q & A *** L P~. ":'1 " _.~:- f .... < S;\Aventura A&CC\OWNER CQNTRACI\AACC . EXHIBIT C - QA 2-26..o9.DOC Printed 212712009 at 10:31 AM S ofS / Qu~lifications & Assumptions Attachments #1 Aventura Arts & Cultural Center PACA Recommendations Reference document dates 11117/08 Building Layout EG'M'''/ A-re'.5 . $I.J/C f Ft.oHII:- t>taAt.J R d h . b k . h' I d' 'ffi A API> .,,4 I- per . ecommen c angmg rea room mto tec OIca Irector s 0 Ice gree . . General storage room needs double doors Agree ~J#soJTtf SFfo.J,5 '51,..!r,c..e... bit. ><: Star Dressing Rooms share a bathroom. This is fairly unusual and recommend splitting shared bathroom into two bathrooms if space allows NO p.s:JZ. E~IC "!, E a , \ 0 lD Z.: Stage Rigging ~ l,a..\ ~ ~ C.,JPEe. &:Jce c~ c.. / JVI( / Er:> ( s "'8.5 _ to"" ",. & p. · 11062-1 1.3 Work Included - Electric Line Sets should be manual - not motorized J Deduct IBk per set, and make sure Div 16 work is also credited. see, pp..e-~ ~z:r~ rto4,oOO Add one full stage black sharks tooth scrim - seamless Add $6K ~ f>ez.. Ettie. Some bid sheets suggest lower weight allowance on draperies. Recommend staying with 25 ounce FR velour as per specifications for main drape, rear traveler curtain, leg curtains and border curtains. Add $5k , fL rat. ~,~ 11062-13 _ Pleats (F) - Recommend that draperies not be pleated and should be flat Deduct $1 Ok 0 t::: pu.. EJZ.-' c:.. 11062-13 - Bottom Hems (I) - Change bottom hem from chain to l/.t diameter bottom pipe for border curtain. NC q.e:. tEll- s;;!Z, c::.. 11062-14 (4) _ Recommend changing these legs to 22' -O"Hx 10' -O"W with the deletion of the movie screen Deduct $6k (I~ f~ E.IZt e 11062-14 - (6) - Cyclorama should have reinforced bottom pocket with allowance for 0/.4' diameter bottom pipe NC Oo~'~ pe.,e:. Fire Safety Curtain ( Draperies ::, 000 GOC>C .10,000 '(0,000 ,5'.0,00 . Add an additional 10 line sets - currently the total number of line sets does not allow for flexibility and will make the theater inaccessible to touring shows Add $6k per set #f7~t> line sets should be on 1'-0" centers with the additional line sets OK ~&:L. S,IC Add $4k for spot lines to pick up stage lighting multi-cables F..,e.. A-u. u..rIE~S f)Ef>&JI>S q.J Ifp-J M~ t, ~SS'TS .....E. Go t.J! v: /- /. h .;: ~ ~ 11063-5 - 2.4 (I) - Recommend that fire curtain restore mechanism should be ma.nua.l Just as long as the Owner understands that this is a safety issue. fN crMV ... . L Na ~A F6T'( f~ Itsl> &>v Gr~ / .;~c:. U8(q4> Audio . Recommend the addition of a center speaker duster (Line Array UPA-l P Meyers x 3) '1' 21 5'0 0 I UPA-I P (not a line-array) $5970 each, X 3 = $17,910. (additional UP-junior down-fill may be needed: $3590, total: $21,500) J. _ 1 e"$ (Listed UPQ-I P $B,500 each, X 2 = $17,000) 1,J~t.r.JD~ ,J ".l,.,~ Az.. r;.e:~ro.J NOTE: our reason for a stereo configuration was on the basis of the narrow seating configuration, feeling an LCR configuration would not be effective. It 11062-16 ED+A - Recommend purchasing 6 on stage monitors JBL PRX512M _;','1500 ~ -.,. \ list: $1429.00 each (typical web price: $950.) (we listed two of the sam.lj,mo.del) 1 . A t;lt,) L( <<11> q:s~ ::: =r . Recommend relocating Sub..,Wo(.>fers {rolTlProscenium hanging location to Deck6r orchestra level Not recommended. . Recommend purchasing addition~lfl.~~~."!lonitors for a total of ~. (preference) or 4 (minimum) Seems to e9nf!ict wit;hth~JB~~~e monitors listed ~l;>ove.-. ~... . Recommend ALD Infrared wire,l~s~ smemt-,Williams or Sennheiser with .IR headset \,~ k.eJ' OF F~ S1~~ l- or-: PEL Williams IR.~-.- , , ~\C ~'& (.-, MOD231.{:' f$t 144- WlRTX9 emitter' (1) @ $804 = $1608 WIR RX14-2 headset .(9) 2 $101 = $909 Total: $3761. - ~~ ; - ': "r.i,~ i ;::: ~'-r\ .) I~'}~_:~"r;;~ (listed Listen FM system: $1 648) ,4 It 'll"'f' Lizl. 3 ,.,: ..,.., ~~ 0'1-. Recommend Shure or Sennheiser wireless microphone package. specify range of 500- 600 MHz. Avoid aU 700 MHz mics. 5H.J~Je vs t-e e:TI! V~~ Ie" Shure UHF-R (B channels): (LESSt!12.. ft:No ""'.....t ) UR4D dual receiver (3) @ $3052 = $9156 UA844 antenna distr:ibution (I) @ $600 UA860WB antenna (2) @ $300 = $600 UA830WB in-line ant. amp (2) @20 I = $402 URI oodypack transmitter (8) @ $876 = 7008 UR2IBET A8? A handheld transmitter (2) @ $1260 = $2520 Total: $20,286. - I> ((I., ~215 (listed Lectrosonics system $16,528 credit) r t ~"1 S-g AD!> ~ t 31) I 7 \ ] ~~/ ,,~ PEe- Video VS~ c~ . Do not recommend purchasing video system as specified ( :i=t:>""t=' V~F\ . Recommend purchasing 10 1!2x 14 dual surface RP screen and 1800 lumen LCD u..J( ~c::.;o-A. projector Understood except for projector lumen output, which is way too low. How to handle project mount? . DVD player should be on FF & E list and not in specifications Not recommended. L t4ea 1,J ~C. Theatre Lighting . /~ ~eC. o-~ 11065-8 - Recommend choosing ETC dimmer systems and lighting control Get the Owner to sign off on a proprietary spec. sa c I ~ 7L1 R:1-~ ere (P?J!~a..s~) 1/ lit Each electric raceway has 5 Non-dim tails assigned throughout the pipe. recommend Dv- one N-D at each end of pipe. NC dI-- Recommend installing raceway that is easily relocated to different pipes for flexibility purposes. Deduct $1 Ok for connector strips. deduct $4k for multi-cables, Add $18k for Multi Cables. Drop Boxes. and breakouts. '5 EC. .IIOc.,~ t-tO- . 4 0,,0 . , Theatrical Lighting Fixtures rJ O. 11065-12 - Recommend purchasing ETC EOS Console and not ~trand Light Palette. ETC lighting cc>~s:~les are an industry standard. Strand lighting consoles are not well known and will be difficult to find a knowledgeable operator. Get the Owner to sign off on a proprietary spec. - (J-'1 r~'; E--rz::.. 11065-17 - Theatrical Lighting (B) - Do not recommend purchasing 10 degree ellipsoidal reflectorspotlight Qeduct $4.5k 11065-18 - Recommend reducing number Altman Lighting SKY CYC from ten (10) to five (5) units Deduct $7.5k 11065-18 - - Do not recommend purchasing eight (8) Fresnel spotlights Deduct $3.2k 11065-18 - - Recommend increasing number of Variable lens PAR fixtures from sixteen (16) to forty-eight (48) (Recommend 54 Pars or Parnels or combination) Add $9k 11065-18 - Recommend purchasing Lycian short throw followspots and not any of the followspots specified Lycians are spec'ed we need more specific info to respond. Recommend Altman Zip strips (xS) or T-3 strips (x5) for ground row Add $7.5k Purchase 8 - 50lb boom bases with 1-1/2" threaded opening Add $1 k Purchase 8 - 10' Schedule 40 pipe with threaded ends Add $1 k otL lit o~. 01"-. , owC.. r;<?(//!> 0't. · ~I?-. o~ cJ~ Recommendations on FF & E will be provided at a later date Questions: / I) ""'0.000 J~ 4) \1,':;00 5) What is the relationship to the Administrative area to the ADA compliant entrance by the valet office? PGAL will explain. Is there access from lobby to backstage from House Left side only? Are there on stage floor/wall outlets for Stagepin connectors and dimmers? Yes Recommend a minimum of 16 ~ 24 dimmers split into 4 locations on stage; USR, USL, DSR, DSL Add $1 Ok Ol!. pe It-- ~c::.. At what height is the control booth desk? Needs to be at or above the heads of the patrons directly in front of control booth. See PGAL section drawing. /Nf:;'J.fo..!-Ar'S> AL."~ Where is proposed Amp Rack placement and storage for Sound control? Needs to be readily accessible. Amps built into speakers on mains and monitors. front fills will be powered amps on stage rack at SMP. Storage backstage in limited storage rooms. 1(0114(( ,0 Sl,-J &- ED A-V t> p c.J G<;-e:z'. <:) c.J~(~ Gr- t:,oK ~1S~'Tf$ (;C.PA p.E.co.,J\W\e,..l~~ 5 / EXHIBIT "D" SUFFOLK AVENTURA ARTS" CULTURAL CENTER AVENTURA, FLORIDA COST CATAGORIES MATRIX NOTE; All personnel costs Indude salarIes and fringe benefits DESCRIPTION BASIC FEE GEN CONDS AlE COST OWNER COST COST OF WORK Pro "ntendentls) x Assistant SliDerinteooer\t(s) x Reid Enaineer x pimect Mimaaer x Suoerlntendent's TraMnnrtation x x PrIndDle In Charoe7*) x Protect Executive ("') x lJ!aal Services )C Accountlnal",) x Prolect ControllerC"') x Schedullna (*\ x Purchaslna (*) x Value En *\ x Svstem5 ~ment x EstImatlna (*\ x Cost Enaineers ('" x PrOlect CoordInatJ rio<) x Pro1ect Fww:IIter *) x Drafting Detaller x Drawlnas Olecker(*) x Safetv Ol'fIcerT*'I x 1:.1:.0. 0ITicer (*, x Secretartal (On-Site \ x Clerk - TVDIst x Mechanical Coordtnator x Etect:rlc8l CoordInator x Proiect Fnttlneer x Schedulina SeMc:es (*) x TIme Keeoer I Checker x SiMii Ena\neer (*) x Off-SIte Travel Costs x Off-SIte 5tlIff Tra x On-SIte ..~ Manaaer Tl'lInsoortation x Emllneer's Tra~t1on x ff MoYIn" ~ x Pro' ect staff SUbststence Cost x Pro EstImatina x Pro ect Phasina x (*) Home office personnel part of CM Fee, slte-asslgned (based) part of GCs. / AACC - EXHIBIT 0 - Cost Categor\lll MalrIx.x\$ Page 1 of 5 EXHIBIT "D" SUFFOLK AVENTURA ARTS" CULTURAL CENTER AVENTURA, FlORIDA COST CATAGORIES MATRIX NOTE: All personnel costs Include salaries and fringe benefits x )C x. ...... x.... . x x. x- ....... x x x x x x x x x x x x x x X X X X / AACC - EXHIBIT 0 - Cost C8tegorles Matrlx.Xls Page 2 of 5 EXHIBIT ~D" SUFFOLK AVENTURA ARTS .. CULTURAL CENTER AVENTURA; FLORIDA COST CATAGORIES MATRIX NOTE: All personnel costs include salaries and fringe benefits " ;: :-~." ':' x x x x Mce . EXHIBIT 0 . Cost Categories Matrb:.x1s Page 3 or 5 x x x x x x x )C X x x -x 'j( x "x-- --- .. --x---- .. ."c" -x-. ,e -----.,(--- X .....-X-:.. x> x x X x x x x x x / EXHIBIT "D" SUFFOLK AVENTURA ARTS .. CULTURAL CENTER AVENTURA, FLORIDA COST CATAGORIES MATRIX NOTE: All personnel costs \ndUde salaries and fringe benefits x x x x x x x x x x x x x ". x x.... x 'X x., .x. .... ....,)( / Mce . EXHIBIT D. Cost CategoI'Iea Matrlx,x1s Page 4 015 EXHIBIT "D" SUFFOLK AVENTURA ARTS .. CULTURAL CENTER AVENTURA, FLORIDA COST CATAGORIES MATRIX NOTE: All personnel costs Indude salaries and fringe beneflts x x x x x x x x x x x x x x x x x X Ucenses - x- x x x x x x x x x X J( X X X X X X X X X X X X / MCC . EXHIBIT 0 - Cost Categories Matrlx.x1s Page 5 of 5 SUFFOLK AVENTURA ARTS & CUL rURAL CENTER EXHIBIT "E"- SUMMARY LEVEL GMP PHASE 2 BUILDING AVENTURA. FLORIDA February 25, 2009 First Floor Mezzanine Gross Building Area 14,185 879 15,064 ~,~ ,-'~--V-~-'~,:'~-;-~;";;"'f.)';::c;~r;;:~'::'<;'"""i"-'1""~'.iWP""J~"",~;<;~~~~~"9~"'~~i~'":~j(WrlW'-m::~::~~,"f<"1 r ,'. ., ""': 'h, ..." ,..' .'" ,.".,' "',.),..-.'" ",,-- ..' "j' .,,'. .."...., ,. 'I IJ , J' -.~.. """,,"" ",," ,,1 )' .".! '-..,",~<'" "-,') "~'c .'",,'" ') .' ,:,',',..,. ~",..."'. . ,,,,,,"";'- ,;.;,~ I"' -, , . t' ,,', c ,.".~ ':[-'.',,,,-.,,'<' ,., ",'.' . " . , ',.'. .'., r . ,- .. .,..-" ' ltUJi:Ji}{'" "',' .,' ,,,.. ''''1'' ',....'4...' ",'if. "'-'1 "'-'~"'~Tr'= ~1::...~~~~.':':~.~~~L=~~~-OOl ~~~~, h~~~.~~i* '~~~~'i:.:',' ~~L~1?f~~ b~-J~~_.lli'~J~1i!JJ 02060 - Buildine Demolition In Phase 1 02200 - Site Work & Utilities $225,355 $14.96 02780 - Unit Pavers $28.805 $1.91 02800 - Planters lNIC) 02900 - Landscaoina & Imaation $32,637 $2.17 03300 - Concrete Work $880.345 $58.44 04200 - Masonrv Work . . .In Concrete 05100 - Structural Steel $385,980 $25.62 05500 - Metal Fabrications $150902 $10.02 06100 - Rouah Caroentrv $4.966 , $0.33 06200 - Finish Caroentrv $144,355 $9.56 07100 - Wateroroofina & Joint Sealants $25.929 $1.72 07525 - Roofina & Flashinas $165,025 $10.95 08100 - Doors, Frames & Hardware $75,665 $5.02 08330 - Coilina Doors and Grilles $1.592 $0.11 08410 - Aluminum Entrances Storefronts. Windows & Glazina $346 031 " $22.97 09220 - Stucco $164.554 $10.92 09250 - Gvosum Drvwall $273.500 $18.16 09310 - Ceramic tile $50.781 . $3.37 09400 - Terrazzo $99.213 $6.59 09511 - Acoustical Panel Ceilinas & Grid $43.810 $2.91 09646 - Wood f100rina $26,025 $1.73 09650 - Caroet and Resilient Floorina $17429 $1.16 09900 - Paintlna $77,271 $5.13 10000 '. Specialties $30 069 $2.00 10200 - Louvers $8,320 $0.55 11000 - Residential Eauipment $2,534 $0,17 11062 - Staae Riaaina and Draoeries $274,447 $18.22 11 065 - Theater Liehting $250,366 $16.62 11066 - Sound SYstem $213.245 $14.16 12000 - Fumishinas $6,000 $0.40 12485 - Foot Grilles $2 000 $0.13 12610 - Fixed Audience Seatina $112216 $7.45 AACC - EXHIBIT E - GMP For Contract 2-26-09.x1s pag.lo12Y SUFFDLK AVENTURA ARTS & CULTURAL CENTER EXHIBIT "E". SUMMARY LEVEL GMP PHASE 2 BUILDING AVENTURA, FLORIDA February 25,2009 First Floor Mezzanine Gross Building Area 14,185 879 15,064 13000 - S cial Construction Decorative Aluminum and Fabric Cano ies 16000 - Electrical $20 000 $1.33 $107,800 $7.16 $173,157 $11.49 $642718 $42.67 $619,862 $41,15 $5,682,9031 $377.251 14420 - Wheelchair Lift 15300 -"Fire Protection 15400 - Plumbin 15500 - HVAC ISUBTOTAL DIRECT COSTS General Conditions 427.478 $28.38 Labor Burden ... . . . 165,495 $10.99 Insurances 75.000 $4.98 Performance & Pavrnent Bond 50,630 $3.36 Builders Risk & Insurance & Deductibles By Owner Building Permit By Owner T emporarv Remote Parking . 90 000 $5.97 Contingency (2,5Ok) 142 073 $9.43 Sales Tax Savings (56,829) ($3.77) CONSTRUCTION COSTS WITHOUT eM FEE $6,576,750 $436.59 Construction Manage:r Fee $223,251 $14.82 ITOTAL CONSTRUCTION COSTS $6,800,0001 $451.411 AACC - EXHIBIT E . GMP For Contract 2-26-09.xls Page 2 01/