Loading...
2008-38 RESOLUTION NO. 2008-38 A RESOLUTION OF THE CITY COMMISSION OF THE CITY OF AVENTURA, FLORIDA APPROVING AND AUTHORIZING THE CITY MANAGER TO EXECUTE AND OTHERWISE ENTER INTO THE ATTACHED CHANGE ORDER EXHIBIT I FOR BID NO. 07 -02-26-2 FOR VETERAN'S PARK MODIFICATIONS CONSTRUCTION BY AND BETWEEN THE CITY AND LINK CONSTRUCTION GROUP, INC.; AUTHORIZING THE CITY MANAGER TO DO ALL THINGS NECESSARY TO CARRY OUT THE AIMS OF THIS RESOLUTION; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the City of Aventura desires to perform modifications to the previous dog park portion of Veteran's Park in a timely and cost effective manner; and WHEREAS, Link Construction Group, Inc. is performing satisfactory work for the Waterways Park Expansion project; and WHEREAS, time constraints on the Veteran's Park Modifications schedule will not allow for a formal bidding process to perform the restroom building and earthwork construction, and accordingly, the work required by this change order is exempt from further competitive bidding; and WHEREAS, use of the same contractor for the Waterways Park Expansion project to perform the restroom building and earthwork construction for the Veteran's Park Modifications will reduce the costs associated with bidding that could add additional profit and overhead costs to actual construction costs of the Veteran's Park Modifications project; and WHEREAS, the City of Aventura currently has Link Construction Group, Inc. under contract to perform improvements pertaining to the Waterways Park Expansion project; and Resolution No. 2008-38 Page 2 WHEREAS, a Change Order is necessary to provide for the restroom building and earthwork construction for the Veteran's Park Modifications project; and WHEREAS, work outlined on said Change Order will apply only to the restroom building and earthwork construction for the Veteran's Park Modifications project. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COMMISSION OF THE CITY OF AVENTURA, FLORIDA: Section 1. The above stated recitals are hereby adopted and confirmed. Section 2. The City Manager is hereby authorized to execute and otherwise enter into Change Order Exhibit I for Sid No. 07-02-26-2, Waterways Park Expansion by and between the City and Link Construction Group, Inc., for Veteran's Park Modifications construction attached hereto and incorporated herein as specifically as if set forth at length herein. Said Change Order amount is $258,841.66. Section 3. The City Manager is hereby authorized to do all things necessary to carry out the aims of this Resolution. Section 4. This Resolution shall become effective immediately upon its adoption. The foregoing resolution was offered by Commissioner Joel, who moved its adoption. The motion was seconded by Commissioner Holzberg, and upon being put to a vote, the vote was as follows: Commissioner Sob Diamond yes Commissioner Teri Holzberg yes Commissioner Silly Joel yes Commissioner Michael Stern yes Commissioner Luz Urbaez Weinberg yes Vice Mayor Zev Auerbach yes Mayor Susan Gottlieb yes Resolution No. 2008- a.. Page 3 PASSED AND ADOPTED this 9th day of September, 2008. APPROVED AS TO LEGAL SUFFICIENCY: r--i ~ ~ CITY ATTORNEY CITY OF A VENTURA CHANGE ORDER FORM CHANGE ORDER NO.9 CONTRACT NUMBER: 07-02-26-2 DATE: August 25, 2008 PROJECT TITLE: Waterways Park Expansion PROJECT CONTRACTOR: Link Construction Group COST: $258,841.66 BUDGET LINE ITEM: 170-5001-572-6206 DESCRIPTION OF CHANGES: Addition of contract work to allow the construction of the City's Veteran's Park Modifications project. Original Contract: Total Previous Change Orders: This Change Order: Revised Contract Amount: $ 2,993,817.41 $ 199,460.01 $ 258.841.66 $ 3,452,119.08 Total Change Orders to Date: 8 Contract Amount before This Change: $3,193,277.42 Total Change in Contract Period: 279 Calendar Days The sum of $258,841.66 is hereby added to the Contract price, and the total adjusted Contract price to date thereby is $3,452,119.08. The time provided for completion of the Contract will increase by 279 Calendar days. This document shall become an amendment to the Contract and all provisions of the Contract will apply thereto. Recommended by Recommended by Consultant ~~ ::f-J o~. Capital Projects Manager Date ~.. Z S-,.c~ Date Recommended for Budgetary Purposes: Finance Support Services Director Date Approved by City Manager Date Accepted by Contractor Date LINK CONSTRUCTION GROUP Veteran's Park Estimate SCHEDULE OF VALUES FOR LUMP SUM DescriDtion Y!!i! ~ Unit Price Extension ~ General Conditions LS $52,000.00 $52,000.00 Mobilization LS $6,000.00 $6,000.00 Construction Fence Stantion Type including vision screen LA $2,900.00 $2,900.00 Sub-Total $60,900.00 Demolition f LS $5,500.00 $5,500.00 Remove eXISting fencing & footings Cut down existing benn (inc. area to the SW) LS $11,000.00 $11,000.00 Demo & remove two (2) existing bench pads on dog park side NO CHARGE Demo & remove additional ornamental fencing as per walk thru NO CHARGE Sub-Total $16,500.00 Earthwork Strip building pad 12" & move to green area CY 20 $10.00 $200.00 Cut walkway & move to green area LS 1 $4,000.00 $4,000.00 Import crushed lime rock (elevation +7.5) TN 210 $30.00 $6,300.00 Misc. landscape grading +/- 0.25 LS 1 $4,000.00 $4,000.00 Survey LS 1 $1,500.00 $1,500.00 Sub-Total $16,000.00 Orai nace Raise existing yard drain inlets LS 2 $800.00 $1,600.00 Sub-Total $1,600.00 Pavement 12" stabilized subgrade SY 231 $15.00 $3,465.00 6" base SY 208 $36.00 $7,488.00 3/4" type S-1I1 asphalt sidewalk (1st lift) SY 185 $27.00 $4,995.00 3/4" type S-1I1 asphalt sidewalk (2nd lift) SY 185 $27.00 $4,995.00 Survey & asbuilts LS 1 $1,285.00 $1,285.00 Sub-Total $22,228.00 Concrete 4" concrete sidewalk (5' wide) SF 180 $11.50 $2,070.00 Survey LS 1 $205.00 $205.00 Sub-Total $2,275.00 Sians & Markinas Pavement restoration (Thenno) LS $2,000.00 $2,000.00 Sub-Total $2,000.00 Water Distribution System 1"P.E. LF 65 $10.00 $650.00 1" X 1" Tee schedule 40 EA 1 $100.00 $100.00 1" plug schedule 40 EA 1 $60.00 $60.00 Cut-in & connect EA 1 $3,500.00 $3,500.00 HRS & sampling points LS 1 $500.00 $500.00 Survey & asbuilts LS 1 $1,190.00 $1,190.00 Sub-Total $6,000.00 LINK CONSTRUCTION GROUP Veteran's Park Estimate SCHEDULE OF VALUES FOR LUMP SUM DescriDtion Y!!i! ~ Unit Price Extension Sanitary Sewer 8" PVC SDR-35 0/6 LF 19 $30.00 $570.00 6" PVC service SDR-35 LF 156 $20.00 $3,120.00 Manhole 0/6 2 EA coats paint only EA 1 $2,200.00 $2,200.00 Rainstoppers EA 1 $100.00 $100.00 8" coupling PVC SDR-35 EA 1 $130.00 $130.00 8" manhole adapter EA 1 $150.00 $150.00 8" X 6" Wye SDR-35 EA 1 $175.00 $175.00 6" X 6" Wye SDR-35 EA 3 $110.00 $330.00 6" 90 degree bend SDR-35 EA 2 $85.00 $170.00 6" 45 degree bend SDR-35 EA 2 $85.00 $170.00 6" clean out assembly SDR-35 EA 3 $220.00 $660.00 USF 7621 box EA 2 $200.00 $40000 Concrete collar EA 2 $160.00 $320.00 6" cap P\IC SDR-35 EA 1 $60.00 $60.00 Remove existing 8" plug & connect 0/6 EA 1 $2,000.00 $2,000.00 Hold existing utilities (WM & FM) LS 1 $7,000.00 $7,000.00 Remove & replace existing "'Z curb & gutter LF 30 $40.00 $1,200.00 Remove & replace 4" concrete sidewalk SF 150 $15.00 $2,250.00 Saw cut existing asphalt LF 200 $3.50 $700.00 Steel plate rental LS 1 $1,200.00 $1,200.00 Base & subgrade restoration wi 100 mix CY 74 $120.00 $8,880.00 Pavement restoration SY 240 $27.00 $6.480.00 MOT & traffic control <nol including police presence) I-S 1 $3,000.00 $3,000.00 Survey & asbuilts LS 1 $1,345.00 $1,345.00 Sub-Total $42,610.00 Restroom/BuildinQ Shell LS $13,200.00 $13,200.00 Trusses LS $1,500.00 $1,500.00 Roofing LS $7,350.00 $7,350.00 Doors/Frames/Hardware LS $3,900.00 $3,900.00 Epoxy Flooring LS $3,200.00 $3,200.00 Stucco LS $3.400.00 $3,400.00 Painting LS $3,150.00 $3,150.00 Toilet Accessories LS $2,800.00 $2,800.00 Plumbing LS $7,120.00 $7,120.00 Electrical LS $9,252.00 $9,252.00 Mechanical LS $3,506.00 $3,506.00 Allowance for damaged sidewalk & gutters LS $3,000.00 $3,000.00 Sub-Total $61,378.00 SUB TOTAL: $231,491.00 BOND: LS 1.50% $3,819.60 SUB TOTAL: $235,310.60 OH&P LS 10.00% $23.531.06 TOTAL: $258,841.66 Not included: Sols ~ naI .-- _tho time 01 tho bid, ___10 proof roll builcll1ll pad - ... widing pilei soill~on -- Nolil_ls_ Assume water service is existing Assume sewer $tLm out is existing & location per plan SiH: fencif"G J erosion cortrol LMdscaping or tr.. removal IrrigaiIon FlOlCirVG_es _F_ Benches r:I Bench Concrete P8ds Water Meters Assumina three f3l month schlNllJe for construction 8ctivities NOT INCWDING WASAAPPROVAL & CONVEYANCE